Skip to the record
Accept no substitutions.

Council archive · source document

07/2398 - Traffic report · 132007.2398

of 95

Text shows just the words. Original shows the document exactly as it was published.

 

 

3.5 Trip Generation

The trip generation exercise was split into the two phases of the proposed development. Given
the staged implementation of the development, and the uncertainty in completion of the second
stage of development (i.e. some time prior to 2019), the trip generation was estimated for both
the initial stage (referred to as Stage 1) and the ultimate development (referred to as Stage 2).
While Stage 1 has been assumed to be completed and operational by 2009, the completion of
Stage 2 is planned to be operational before 2019. For this, analysis up to a horizon year of 2019
was undertaken.

Recognising the likely mix of trip generation rates and directional split of traffic generated by the
various types of residential developments within the retirement community, each residential type
was assessed separately, and the resulting sub-totals were summed to estimate a total
development trip generation.

Trip generation rates were based on the NSW Roads and Traffic Authority (RTA)'document.
This data was supplemented with figures from the Institute of Transportation (ITE) Engineers Trip
Generation Manual (7* Edition). The directional distribution split data was taken directly from the
ITE Trip Generation Manual.

The following table summarises the results of the Stage 1 trip generation analysis.

Table 1: Stage 1 Trip Generation by Type

 

 

 

 

 

 

Type Number of Units/Beds Peak Hour Trips Tota! Trips In/Out Spiit*
per Unit AM (PM) AM (PM)
AM (PM)
Residential Cara 120 ~ 0.2 (0.2) “24 (24) 73%/27% (52%/48%)
Facility
Apartments. 20 0.29 66) 45%/55% (61%/39%)
Residential Lots 73 0.29 (0.53) 21(39) = 38% /E2% (61%/39%)
‘Total 213 Wa “61 (69) 51%/49%
{59%/41%)

 

 

“per ITE Trip Generation Manual - Senior Adult Housing

The following table summarises the results of the ultimate (i.e. Stage 1 + Stage 2) development
trip generation exercise.

' "Guidelines to Traffic Generating Developments”, RTA, Issue 2.2 October 2002.

 

27-001(1}Final.doc: 04/12/07

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - Traffic report.tif · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.