07/2398 - Traffic report · 132007.2398

of 95

Text shows just the words. Original shows the document exactly as it was published.

 

 

 

16-

Table 6: 2009 Design Analysis - Elm Street / Diamond Street

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Movement Volume Degree of Delay (s) 95" %lle Queue
Saturation () (m)
AM Peak Hour
Elm Street South (1) 332 0.18 0 0
Elm Street South (R) 230 0.32 14.0 15
Diamond Street {L) 384 0.55 14.9 35
_ Diamond Street (R) 79 0.43 38.4 16
Elm Street North (L) 273 0.15 8.4 ; 0
Elm Street North (1) 527 0.28 0.1 0
PM Peak Hour
Elm Street South (1) 369 0.20 0 - 0
Elm Street South (R) 297 0.31 | 11.8 15
Diamond Street (L) 360 0.41 11.3 22
Diamond Street (R) 123 0.57 38.4 25
Elm Street North (L) 203 0.11 8.4 0
Elm Street North (1) 358 0.19 0.2 0

 

 

 

 

 

 

Note: Practical Maximum Degree of Saturation (X) for unsignalised intersections is 0.80.

The analysis indicates that, in 2009, the intersection of Elm Street / Diamond Street will continue
to function within an acceptable degree of saturation in both the AM and PM peak periods with
the addition of traffic generated by the proposed development.

5.1.2 Elm Street / Pearsons Road

The traffic distribution for the proposed development (discussed in Section 3.6) indicates that the
northbound right-turn movement at Pearsons Road was estimated to be approximately 55
vehicles, with an opposing through volume of approximately 550 vehicles in the AM peak hour.
Likewise, the northbound right-turn volume was estimated to be 67 vehicles with an opposing
volume of approximately 402 vehicles in the PM peak hour. According to the Department of
Main Roads’ “Road Planning and Design Manual”, Chapter 13, Figure 13.21, these volumes
warrant a separate right-tum bay from Elm Street into Pearsons Road. A functional layout of the
Elm Street / Pearsons Road intersection, including the recommended right-turn bay, has been
included as Figure A2.

The results of the traffic analysis for the 2009 scenario, including the base traffic, the traffic
generated by the proposed development and including provision of a right-turn pocket, are
presented in Table 7. The SIDRA3.2 Movement Summary output data sheets for the analysis
are provided in Appendix C.

A SIDRA generated configuration of the proposed upgrade is shown as Figure 5.

 

3427-001(1)}-Final.dec: 04/12/07

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - Traffic report.tif · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.