Skip to the record
The gold standard in government transparency.

Council archive · source document

07/2398 - Traffic report · 132007.2398

of 95

Text shows just the words. Original shows the document exactly as it was published.

Phasing Summary Page | of |

SIDRA =e
INTERSECTION

Phasing Summary

Elm St / Diamond St Intersection (Signalised Option)
2019 AM Design

C = 90 seconds
Cycle Time Option: Optimum cycle time (Minimum Delay)
Phase times determined by the program.

 

 

Phase H Phase G Phase I

Moy fl |

 

 

| _ le
Th | wy hy

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Green Time = 46 seconds Green Time = 14 séconds Green Time = 12 seconds
Phase Time = 52 seconds Phase Time = 20 seconds Phase Time = 18 seconds
Phase Split = $8 % Phase Split = 22 % Phase Split = 20 %

Normal Movement Permitted/Opposed

Slip-Lane Opposed Slip-Lane

Stopped Movement Continuous

Turn On Red

4-

SIDRA SOLUTIONS

Site: Design Signalised 2019 AM Elm at Diamond
T:\3400-3499\3427 - Cooroy Retirement Community\SIORA\Elm and Diamond Nov 28.aap
Processed Nov 29, 2007 01:30:44PM

A1059, McCormick Rankin Cagney, Large Office

Produced by SIDRA Intersection 3.2.1.1478
Copyright 2000-2007 Akcelik and Associates Pty Ltd
" .

about:blank 29/11/2007

Used in these records

About this file

File size
4.9 MB (large file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - Traffic report.tif · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.