Council archive · source document
07/2398 - Traffic report · 132007.2398
Movement Summary Page 1 of 2 SIDRA ~= INTERSECTION Movement Summary Elm St / Diamond St Intersection (Signalised Option) 2019 PM Design Signalised - Fixed time Cycle Time = 80 seconds Vehicle Movements 95% Dem Deg of Aver Aver MovID Turn Flow %HV Satn Delay evel or Queue Queed erator _ Speed (veh/h) (w/c) (sec) (m) (km/h) Elms 2 T 495 10.5 0.387 5.3 LOS A 73 0.44 0.39 52.4 3 R 399 10.0 0.670 30.9 Los C 100 0.91 0.96 32.6 Approach - 894 10.3 0.670 16.7 Los B 100 0.65 0.65 41.2 Diamond E 4 L 483 5.6 0.463 13.2 LOS B 70 0.55 0.76 44,1 6 R 165 8.5 0.628 48.1 LOS 0 61 0.99 0.83 26.8 Approach 648 6.3 0.628 21.4 Losc 70 0.66 0.78 38.0 Elm N . 7 L 272 5.1 0.388 16.4 LOS B 48 0.50 0.76 41.4 8 T 478 6.3 0.680 22.9 LOS ¢ 125 0.90 0.79 36.9 Approach 750 5.9 0.680 20.6 tosc 125 0.75 0.78 33.4 All Vehicles 2292 7.7 0.680 19.3 LOS B 125 0.69 0.73 39.3 Pedestrian Movements 95% Mov 1p Dem Flow belay Levelof Backof Prop. Eff. Stop (ped/h) (see) Service Queue Queued Rate (m) Pl 53 34.2 LOS D 0 0.93 0.93 P3 $3 17.6 LOS B 0 0.66 0.66 All Peds 106 25.9 Los c a 0.79 0.79 Symbols which may appear in this table: Following Degree of Saturation # Xx = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements about:blank 29/11/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.