Original source · versioned page text
2014-04-28 General Committee Meeting Agenda Pages 1-64
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
Page 14 of 200
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
s lla ad. ot i } S {} fi j i} ad
y ing |
NC offers a voluntary green waste collection service, with fortnightly collection of
240-1 wheelie bins for an annual fee of $75. To date, the service has had minimal
subscription (in excess of 3,000 households participating currently). There is no data
available for the number of households in NC area treating organic waste in-situ,
through home-composting systems. However, anecdotal evidence suggests a
reasonable level of home-composting activity in the region. NC may give
consideration to a mandatory domestic collection service for green waste, possibly in
combination with food waste, in urban Council areas, if there was community
support and if a cost-benefit analysis proved beneficial. However, concerns have
been raised regarding the potential impact of a mandatory system on home
composting activity.
Sunshine Coast Regional Council conducted an organics collection trial in Peregian
Springs and Cooroy. The voluntary opt in trial was conducted on only single
occupancy residential properties in the new housing estate of Peregian Springs
(participation 251 households) and the established housing of Cooroy (participation
220 households). Approximately 20% participants opted out of the trial
A weekly collection of combined garden and food organics was undertaken.
Participants were provided with a 240 L green lid bin, an aerated kitchen tidy and 6
months’ supply of compostable bags.
Organics collection per delivered bin yielded:
* 9.5 kg per week Peregian Springs
* 6.2 kg per week in Cooroy.
Garden organics comprised between 85% and 92% of all materials collected in the
organics bin;
Waste made up between 7% and 15%, The detail of the trial results are in The
Sunshine Coast Organics Collection Trial Summary Report February 2012 — The
Organic Force.
If food waste were to be added to green waste and processed at the Eumundi landfill
a new environmental licence ERA 53 Composting and Soil Conditioner Manufacturing,
would be required. A purpose built facility would need to be readily and cost
effectively established.
It should be noted that NC intends to pursue @ technical review of various aspects of
the Eumundi Road Landfill, including assessing any discharge issue from existing
organic waste processing operations at the site. Options that may change these
operations could adversely or beneficially impact on a discharge issue.
a Themes for Options Development | Lloyd Consulting
Page 14 of 200See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.