Original source · versioned page text
2014-04-28 General Committee Meeting Agenda Pages 1-64
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
• Sampling and testing shall be in accordance with relevant regulatory
requirements and manuals such as those provided by the Environmental
Protection Agency, with testing undertaken by an accredited Laboratory;
• Continuous monitoring shall be undertaken by the system for any water on the
surface of the application area, downslope resurfacing, changing plant growth
on or around the application area and any other signs of problems, and
addressed through maintenance or servicing.
(vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site
washing of any plant or equipment is necessary, all wastewater shall be
collected in a sump and disposed of off-site as trade waste by a registered
operator.
(viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic
Plan (Open Space-Conservation & Waterway Protection) is to be undertaken in
addition to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-
Based Stormwater Management Plan.
C. Refuse to change conditions 15 and 16;
D. Include the following additional conditions:
1. The effluent holding tank and STP shall have visual and audible high level
alarms systems installed with secondary power backup (e.g.: battery power);
2. The effluent facilities and grease trap facility shall be serviced and maintained on a
three monthly service regime with all documentation for maintenance and servicing
forwarded to Noosa Council.
REPORT
1. Proposal
The applicant has requested Council provide a pre-request response notice to change conditions
of a Development Permit for a Material Change of Use for a Resource Based Bottling Plant
issued by the Planning & Environment Court. The proponent advises it wishes to significantly
reduce the scale of the approved operation and seeks changes to a number of the conditions that
attach to the Court Order (included as Attachment 2).
The applicant indicates the Cooroy Mountain Spring Water business will now operate as follows:
Reduced operations from 5 days per week plus 5 Saturdays per year to 2 - 3 days per week;
A reduced number of employees from 48 to approximately 3 - 4 staff (maximum of 10) and 3
visitors at any one time;
No longer manufacturing or distributing products for office water coolers;
Reduced vehicle movements and access requirements due to the changes in manufacturing
and hours of operation; and
Changes to on-site effluent requirements as a result of the reduced number of employees
and visitors.
The applicant originally sought changes to conditions 8, 9, 13, 15, 16, 18A & 18B in relation to
car parking, access relocation, development contributions and effluent treatment. During the
course of the assessment it also agreed to change conditions 5B, 5C, 5E, 5F & 5G relating to
truck movements, staff and operating hours and add two new effluent treatment conditions.
Page 28 of 200
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.