Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2014-04-28 General Committee Meeting Agenda Pages 1-64

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 40 of 200

GENERAL COMMITTEE MEETING AGENDA                                                       28 APRIL 2014

           (a)  the use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road be
                prohibited except in case of an emergency (i.e. safety requirement);
           (b)  Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr.
      Hours of operation
      5E.   The hours of operation for the use are limited to:
                *   6:00am to 10:00pm Monday to Friday;           :
                *   8:00am to 5:00pm on no more than five (5) Saturdays per year, where production has
                    been disrupted during the week due to breakdown.
      Maximum staff
      5F.   Amaximum number of 48 staff (including drivers) are permitted on the premises during the hours of
            operation and are not permitted to arrive at the premises prior to 6:00 am except for:
                *   1 employee (maintenance worker) who is permitted to afrive at $:00 am Monday to Friday:
                *   1 employee (maintenance worker) who is permitted to arrive at 5:30 am Monday to Friday:
                    and
                                                                                                +0
                 *  8 employees (production workers) who are permitted to arrive at 5:45 am Monday Friday. *”
      5G.   Administrative staff will be relocated from the site by 31 October 2012 such that the maximum
            number of staff on site from that time forward will be 30, generally represented by 15 production
            staff, 7 semi-trailer drivers, 3 management staff (from time to time), 2 ancillary truck drivers and 2
            maintenance workers.
      Home and office deliveries     :
      5H.     No home or office delivery staff or vehicles shall operate from the premises.
      Miscellaneous
      6.    Existing trees on the site and within road reserves are to be retained, except where required to be
            removed due to building operations or the conduct of the approved use. These landscape plans
            required to be submitted are to denote areas of existing vegetation or existing trees proposed or
            required to be retained.
      7.   Any advertising sign or device is to comply with Council's policies on advertising.
     Land Development
      Vehicle Access and Frontage works
      8.    The applicant shall relocate the existing site access to a location between 80 and 110 metres east
            of the existing site access on Cooroy Mountain Road, to the reasonable satisfaction of Council. The
            intersection between Cooroy Mountain Road and the relocated site access shall be designed and
            constructed to provide safe turning areas for the vehicles likely to use the access. In this respect the
            intersection between Cooroy Mountain Road and the relocated access shall be designed and
            constructed in accordance with the most recent edition of the Department of Main Roads Road
            Planning and Design Manual and The Noosa Plan Planning Scheme Policy 5 Engineering Design
            Standards - Roads, Orainage and Earthworks. The redundant access (ie. the existing access
            driveway) shall not be used for vehicular access. To ensure vehicular access via the redundant
            access does not occur, the redundant access point within the Cooroy Mountain Road reserve shall
            be revegetated in accordance with Council standards.
      9.    The relocated driveway from Cooroy Mountain Road to the car parking loading area shall be sealed,
            designed and constructed in accordance with AS/NZS 2890.1-2004, AS 2890.2-2002 and The
            Noosa Plan Planning Scheme Policy 5 Engineering Design Standards - Roads, Drainage and
            Earthworks. The relocated driveway shall be designed and constructed to grades that prevent
: ae .                     .                                                              2of 8
 ein    \eo

                                                                                       Page 40 of 200
Log in to download the original file

2014-04-28 General Committee Meeting Agenda Pages 1-64(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.