GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
Page 41 of 200
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
ener rree creer
vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
footpath without any step or level difference. Should any driveways be constructed to grades that
de not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the
driveway be removed and reconstructed to levels that do comply.
10. All vehicles shail enter and leave the site in a forward direction.
Loading Areas
11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as
shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of
AS 2890.2-2002 where applicable.
Car Parking
12. A Sealed car parking area shall be provided on site generally as shown on drawing number SK-01,
dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where
applicable.
13. A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly defined
disabled carpark space.
14. All carparking shall be kept, maintained and tine-marked in a condition fit for use.
Roadworks Contributions
15. Acontribution of $5,960 shail be paid to the Council towards the cost of improvements to the major
road network of Cooroy, as a@ result of increase traffic generation caused by the proposed
development. The contribution shall be paid to the Council pnor to obtaining a Development Permit
for Operational Works, This amount will be subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2007 until the date of payment.
16. A contribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy
Mountain Road, as a result of increase traffic generation caused by the proposed development. The
contribution shall be paid to the Council prior to obtaining a Development Permit for Operational
Works. This amount will be subject to variations in the Consumer Price Index, Al! Groups Brisbane
from December 2007 until the date of payment.
Water Quality
17. The applicant shall submit a Water Management Plan for Council approval prior to the issue of any
Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified
Environmental Engineer and certified by a Registered Professional Engineer of Queensland
The Water Management Plan shail detail water quantity and quality requirements of environments
receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate
treatment measures will be incorporated into the proposed use to ensure the existing water quantity
and water quality within environments receiving runoff from all aspects of the proposed use (i.e.
including but not limited to effluent, carpark runoff and any by products of industrial use occurring on
site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water)
Policy 1997.
Effluent Disposal
18. -,
18A. The design and construction of the on-site effluent disposal system and disposal area shall be in
accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and
Sutheriand, dated Geteber ek subject to the following requirements:
Hohe nr
{i} ongoing monitoring of treatment process and disposal areas shall be undertaken to
ensure both are functioning effectively over time. They shail be undertaken generally
as follows: .
ae Jofé
Page 41 of 200See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.