GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 41 of 200

GENERAL COMMITTEE MEETING AGENDA                                                      28 APRIL 2014

                                  ener                               rree creer
         vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
         footpath without any step or level difference. Should any driveways be constructed to grades that
         de not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the
         driveway be removed and reconstructed to levels that do comply.
    10.  All vehicles shail enter and leave the site in a forward direction.
    Loading Areas
    11.  Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as
         shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of
         AS 2890.2-2002 where applicable.
    Car Parking
    12.  A Sealed car parking area shall be provided on site generally as shown on drawing number SK-01,
          dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where
          applicable.
    13.   A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly defined
          disabled carpark space.
    14.   All carparking shall be kept, maintained and tine-marked in a condition fit for use.
    Roadworks Contributions
    15.   Acontribution of $5,960 shail be paid to the Council towards the cost of improvements to the major
          road network of Cooroy, as a@ result of increase traffic generation caused by the proposed
          development. The contribution shall be paid to the Council pnor to obtaining a Development Permit
          for Operational Works, This amount will be subject to variations in the Consumer Price Index, All
          Groups Brisbane from December 2007 until the date of payment.
    16. A contribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy
          Mountain Road, as a result of increase traffic generation caused by the proposed development. The
          contribution shall be paid to the Council prior to obtaining a Development Permit for Operational
          Works. This amount will be subject to variations in the Consumer Price Index, Al! Groups Brisbane
          from December 2007 until the date of payment.
    Water Quality
     17.  The applicant shall submit a Water Management Plan for Council approval prior to the issue of any
          Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified
          Environmental Engineer and certified by a Registered Professional Engineer of Queensland
          The Water Management Plan shail detail water quantity and quality requirements of environments
          receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate
          treatment measures will be incorporated into the proposed use to ensure the existing water quantity
          and water quality within environments receiving runoff from all aspects of the proposed use (i.e.
          including but not limited to effluent, carpark runoff and any by products of industrial use occurring on
          site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water)
          Policy 1997.
     Effluent Disposal
     18.  -,
     18A. The design and construction of the on-site effluent disposal system and disposal area shall be in
          accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and
          Sutheriand, dated Geteber ek subject to the following requirements:
                          Hohe nr
          {i}       ongoing monitoring of treatment process and disposal areas shall be undertaken to
                   ensure both are functioning effectively over time. They shail be undertaken generally
                    as follows:                                                      .
    ae                                                                                  Jofé

                                                                                      Page 41 of 200
Log in to download the original file

2014-04-28 General Committee Meeting Agenda Pages 1-64(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.