Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2016-11-08 S&O Agenda - Item 1, Attachment 1 - Annual Report 2015-16

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              8 NOVEMBER 2016


          Waste Disposal
    26.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
          and Industrial Premises”. The facilities must include an external impervious area
          correctly sized for all refuse and recycling containers and suitably screened from
          public places and neighbouring properties. A bin wash area is required with a cold-
          water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
          outlet must be designed to prevent storm water entry to the sewerage system. This
          can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
          0.5m²), or alternatively the waste area can be roofed, or any other design approved
          by Council.
    27.   Refuse containers must be provided in accordance with the requirements of the
          Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
          Regulation 2000, for the storage and collection of refuse.
    OPERATIONAL WORKS - OPW16/0183
    PLANNING
          Approved Plans
    1.    Development undertaken in accordance with this operational works approval must
          generally comply with the approved plans of development. The approved plans are
          listed in the following table unless otherwise amended by these conditions.
           Plan No.           Rev.   Plan/Document Name                                 Date
           C001               A      Drawing Index and Standard Notes, prepared by      18/08/2016
           Job No: SC-5734           Empire Engineering

           C020               A      Siteworks and Drainage Plan, prepared by Empire    18/08/2016
           Job No: SC-5734           Engineering

           C025               A      Siteworks and Drainage Sections and Details,       18/08/2016
           Job No: SC-5734           prepared by Empire Engineering

           C030               A      Pavement Plan, prepared by Empire Engineering      18/08/2016
           Job No: SC-5734
           C040               A      Sign and Linemarking Plan, prepared by Empire      18/08/2016
           Job No: SC-5734           Engineering

           Sheet 07 of 09     Q      Part 1 Landscape Plan, prepared by Building        11.09.16
                                     Suncoast Green
           Sheet 08 of 09     Q      Part 2 Landscape Plan, prepared by Building        11.09.16
                                     Suncoast Green
           Sheet 09 of 09     Q      Landscape Details, prepared by Building            11.09.16
                                     Suncoast Green
    LANDSCAPING WORKS
    2.    The low wall and screening trellis near the corner of Venture Drive and the unnamed
          Road must be setback in accordance with the approved Landscape Plans.
    3.    All landscape works must be constructed and undertaken generally in accordance
          with the approved plans and conditions detailed in this Decision Notice.
    4.    Turfed areas within the Venture Drive and the unnamed road reserves must:
          a.    Join smoothly and level with adjoining surfaces.
          b.    Be free of disease, pest, weeds, rock and debris.


                                                                                     Page 42 of 70
Log in to download the original file

2016-11-08 S&O Agenda - Item 1, Attachment 1 - Annual Report 2015-16(PDF, 7MB).pdf · 7.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.