Decision Notice - 010.2009.00000512.001 [As Published] · 132009.512

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         2009/512



21.    Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site,
       the relocation site or between the sites must be repaired or reinstated to at least pre-existing
       conditions.
22.    Sediment and erosion control measures must be placed on site prior to the works
       commencing and shall be maintained until all works are complete. The erosion and sediment
       control measures shall be in accordance with the “Best practice guidelines for control of
       stormwater on building sites” prepared by Healthy Waterways (available at
       www.healthywaterways.org).
23.    All disturbed areas must be revegetated or otherwise stabilised at the completion of the works.
       Disturbed areas are revegetated using species identified in PSP3 – Landscaping Plants and
       Guidelines.
24.    The transportation of all materials to and from the site must be undertaken in a manner such
       that no particle matter escapes onto a public road. All vehicles carrying out materials either to
       or from the site shall be covered to prevent materials including dust being windblown from the
       vehicle.
25.    A Waste Management Plan shall be submitted for the demolition to Planning Assessment,
       Tewantin Office, Sunshine Coast Regional Council, prior to the development permit for
       building works being issued. The Plan shall contain the following information:-
       MATERIALS ON-SITE                         DESTINATION
                                                 Re-use and Recycling      Disposal
       Expected waste     Estimated    volume    On-site *specify Off-site               *Specify
       materials          (m³)                   proposed reuse or *specify              contractor &
                                                 onsite  recycling contractor     &      landfill site
                                                 methods            recycling outlet
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber         –
       please specify
       Plasterboard
       Metals – please
       specify
       Asbestos
       Other – please
       specify
       NOTE: Details of site area to be used for onsite separation, treatment and storage (including
       weather protection) shall be provided on the plan drawings accompanying your application.
Relevant Period
26.    The Development Permit for a material change of use lapses if the use has not happened by
       10 June 2013, unless an application to extend the relevant period is approved by Council.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency         Referral Address

 Nil


                                                                                       Page 4 of 8

Used in these records

About this file

File size
62 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00000512.001 [As Published].pdf · 62 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.