Council archive · source document
Decision Notice - 010.2009.00000512.001 [As Published] · 132009.512
2009/512
9.2 Disposal for firewood.
9.3 Disposal for landscaping purposes.
9.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
9.5 The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
9.6 The applicant is advised that burning off is an unacceptable method of disposal.
10. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
11. A minimum of 20% of the site shall be retained as soft landscaping.
12. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
13. A geotechnical report, prepared by a registered professional engineer shall be obtained and: -
13.1 certify that the site is not at risk from landslide emanating from the site or from other
land; or
13.2 identify methods of stabilising all buildings, access ways and uses areas; and where
the geotechnical report identifies methods of stabilising buildings, access ways and
uses areas. The development shall implement those methods, which are
recommended.
14. External colours and finishes of the building shall comprise of muted/environmental tones that
blend with the natural environment.
Demolition or Relocation of the Existing Dwelling
15. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority;
16. All infrastructure must be disconnected, capped or sealed including:-
16.1 electricity meters removed and electrical wires disconnected; and
16.2 telephone lines are disconnected; and
16.3 high speed data cables and television provider boxes are disconnected and removed
to the standard required by the regulatory authority;
17. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, must be removed from the building and disposed of in accordance with industry best
practice.
18. Waste generated during construction must be stockpiled in a centralised location and covered
as required to prevent material being blown onto adjoining properties including the road
reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service. Storage areas are to be located near the temporary access to the site so
that access can be gained with out damage to infrastructure.
19. All building materials containing asbestos products must be disposed on in accordance with
industry best practice.
20. A temporary crossing must be provided to protect road reserve infrastructure including kerb
and channel;
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00000512.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 62 KB (small file)
- File type
No other editions are linked here.