Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
b) Overall outcomes for the Noosaville Locality (Division 16);
c) Specific outcomes for the Noosaville Locality (Division 17); and
Including amendments to 3 July 2017
d) Specific outcomes for each zone in the locality including—
The Noosa Plan
i. Detached Housing Zone (Division 18);
ii. Semi-Attached Housing Zone (Division 19);
iii. Attached Housing Zone (Division 20);
iv. Visitor Mixed Use Zone (Division 21);
v. Neighbourhood Centre Zone (Division 22);
vi. Business Centre Zone (Division 23);
vii. Shire Business Centre Zone (Division 24);
viii. Community Services Zone (Division 25);
ix. Industry Zone (Division 26);
x. Open Space Recreation Zone (Division 27); and
xi. Open Space Conservation Zone (Division 28).
Division 2—General provisions for assessment tables
11.2 Categories of development and assessment
The categories of development and assessment for each type of development are
identified in column 2 of tables 11.1 to 11.12. The types of development are as follows—
11.2.1 Tables 11.1 to 11.11 – making a material change of use for a defined use, or another use
in a defined use class, listed in column 1; or
11.2.2 Table 11.12 – development other than a material change of use, listed in column 1 and
including—
a) Carrying out building work not associated with a material change of use;
b) Carrying out building work if demolition, relocation or removal of a building and not
associated with a material change of use;
c) Placing an advertising device on premises;
d) Reconfiguring a lot;
e) Carrying out operational work associated with a material change of use where a
Development Permit for material change of use has been issued;
f) Carrying out operational work associated with reconfiguring a lot where a
Development Permit for reconfiguring a lot has been issued;
g) Carrying out operational works for the construction of a driveway for a Detached
house;
h) Carrying out operational works for prescribed tidal works;
11-2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.