Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
i) Carrying out operational works in Noosa Waters canal;
j) Excavating or filling of land not associated with a material change of use; and
k) Other.
Including amendments to 3 July 2017
The Noosa Plan
11.3 Assessment benchmarks for assessable development and
requirements for accepted development
11.3.1 The relevant assessment benchmarks in each zone are referred to in column 3 of tables
11.1 to 11.11.
11.3.2 For accepted development subject to requirements and development requiring code
assessment, the relevant assessment benchmarks and requirements for accepted
development are the applicable codes2.
11.3.3 For impact assessment development, the development is assessed against the whole
planning scheme.
11.4 Consistent and inconsistent uses in zones
11.4.1 In accordance with the following sections identified for the respective zones, a defined
use or use class is noted in column 1 of the assessment table for making a material
change of use for the relevant zone as either a consistent use or as an inconsistent use
in that zone—
a) Division 18 — Detached Housing Zone (Sections 11.11 and 11.12);
b) Division 19 — Semi-Attached Housing Zone (Sections 11.15 and 11.16);
c) Division 20 — Attached Housing Zone (Sections 11.18 and 11.19);
d) Division 21— Visitor Mixed Use Zone (Sections 11.23 and 11.24);
e) Division 22 — Neighbourhood Centre Zone (Sections 11.27 and 11.28);
f) Division 23— Business Centre Zone (Sections 11.31 and 11.32);
g) Division 24 — Shire Business Centre Zone (Sections 11.36 and 11.37);
h) Division 25 — Community Services Zone (Sections 11.46 and 11.47);
i) Division 26— Industry Zone (Sections 11.50 and 11.51);
j) Division 27 — Open Space Recreation Zone (Sections 11.54 and 11.55); and
k) Division 28— Open Space Conservation Zone (Sections 11.59 and 11.60).
2
Assessment benchmarks will include matters prescribed by Sections 3.5.4 (Code Assessment) and 3.5.5 (Impact
Assessment) of IPA in addition to the provisions of this planning scheme.
11-3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.