Table 13.12—Flood levels and flood immunity requirements




                                                                                                                                             Including amendments to 3 July 2017
     Type of development                                    Flood level (Define Flood Event47) for a 2100




                                                                                                                                 The Noosa Plan
                                                            planning period
     General
     Business uses                                          1% AEP

     Residential uses                                       1% AEP

     Community Use                                          0.5% AEP
     Education Type 1 Childcare, Type 2 School

     Other uses, unless specified below                     1% AEP

     Community Uses that are essential community infrastructure (recommended flood level)
     Emergency service facilities, other than 0.2% AEP
     police station48

     Hospital and associated facilities                     0.2% AEP

     Police facilities                                      0.5% AEP

     Stores of valuable records or items of                 0.5% AEP
     historic or cultural significance

     Infrastructure Uses that are essential community infrastructure (recommended flood
     level)
     Major switch yards and substation          0.5% AEP

     Power facilities49                                     0.2% AEP

     Sewerage treatment plant50                             0.01% AEP

     Water treatment plant                                  0.5% AEP

     Hazardous materials
     Hazardous materials                                    1% AEP




47
   The Defined Flood Event is the nominated recurrent event at the end of the nominated planning period.
48
   Some emergency service and police facilities (e.g. water police and search and rescue operations) are dependent on
direct water access. The flood levels do not apply to these aspects but other operational areas should be located above the
recommended flood level to the greatest extent feasible
49
   Some emergency service and police facilities (e.g. water police and search and rescue operations) are dependent on
direct water access. The flood levels do not apply to these aspects but other operational areas should be located above the
recommended flood level to the greatest extent feasible.
50
   For a sewerage treatment plant the recommended flood level applies only to components that are likely to fail or may result
in contamination.


                                                         13-51
                                     Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB).pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.