Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections

of 862

Text shows just the words. Original shows the document exactly as it was published.

            Including amendments to 3 July 2017




                                                                                  Division 15—Erosion and Sediment Control
The Noosa Plan




                                                                                                       Code
                                                  14.120 Erosion and Sediment Control Code
                                                           The provisions in this division comprise the Erosion and Sediment Control Code. They
                                                           are—
                                                                  compliance with the Erosion and Sediment Control Code (section 14.122);
                                                                  overall outcomes for the Erosion and Sediment Control Code (section 14.123);
                                                                   and
                                                                  specific outcomes and probable solutions for the Erosion and Sediment Control
                                                                   Code (section 14.124—14.125).

                                                  14.121 Compliance with the Erosion and Sediment Control Code
                                                           Development that is consistent with the specific outcomes in sections 14.124 and 14.125
                                                           complies with the Erosion and Sediment Control Code.

                                                  14.122 Overall outcomes for the Erosion and Sediment Control Code

                                                  14.122.1 The overall outcomes are the purpose of the Erosion and Sediment Control Code.

                                                  14.122.2 The overall outcomes sought for the Erosion and Sediment Control Code are the
                                                           following—

                                                  a)    construction activities are managed to prevent erosion and sedimentation to offsite waters
                                                        including stormwater, creeks and rivers;

                                                  b)    development facilitates erosion control, drainage control and sediment capture and
                                                        treatment; and

                                                  c)    construction activities within watercourses are planned to prevent erosion, construction
                                                        failure and associated sedimentation.

                                                  14.123 Specific outcomes and probable solutions for the Erosion and
                                                         Sediment Control Code
                                                  14.123.1 The specific outcomes sought for the Erosion and Sediment Control Code are included in
                                                           column 1 of Table 14-53. Probable solutions for code assessment development are
                                                           included in column 2 of Table 14-53.
                                                  Table 14-53 —Erosion and sediment control
                                                                   column 1                                             column 2
                                                               Specific Outcomes                         Probable solutions (if code assessment)
                                                  14.124 Effects of works
                                                  Erosion and drainage control, sediment
                                                  capture and stormwater runoff                       S1.1 Construction works are designed,
                                                  O1 Development design, density, layout, and         planned and executed with respect to the
                                                  staging provide for erosion control, drainage       principles of erosion reduction, drainage
                                                  control and sediment capture and treatment          management and sediment capture in
                                                  during the construction phase.                      accordance with Appendix 2, Table A of the
                                                                                                      Queensland State Planning Policy and
                                                                                                      International Erosion Control Association Best
                                                                                                      Practice Erosion and Sediment Control
                                                                                                      (BPESC) 2008;

                                                                                                  14-130
                                                                                     Erosion and Sediment Control Code

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB).pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.