Council archive · source document
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
Including amendments to 3 July 2017
Division 15—Erosion and Sediment Control
The Noosa Plan
Code
14.120 Erosion and Sediment Control Code
The provisions in this division comprise the Erosion and Sediment Control Code. They
are—
compliance with the Erosion and Sediment Control Code (section 14.122);
overall outcomes for the Erosion and Sediment Control Code (section 14.123);
and
specific outcomes and probable solutions for the Erosion and Sediment Control
Code (section 14.124—14.125).
14.121 Compliance with the Erosion and Sediment Control Code
Development that is consistent with the specific outcomes in sections 14.124 and 14.125
complies with the Erosion and Sediment Control Code.
14.122 Overall outcomes for the Erosion and Sediment Control Code
14.122.1 The overall outcomes are the purpose of the Erosion and Sediment Control Code.
14.122.2 The overall outcomes sought for the Erosion and Sediment Control Code are the
following—
a) construction activities are managed to prevent erosion and sedimentation to offsite waters
including stormwater, creeks and rivers;
b) development facilitates erosion control, drainage control and sediment capture and
treatment; and
c) construction activities within watercourses are planned to prevent erosion, construction
failure and associated sedimentation.
14.123 Specific outcomes and probable solutions for the Erosion and
Sediment Control Code
14.123.1 The specific outcomes sought for the Erosion and Sediment Control Code are included in
column 1 of Table 14-53. Probable solutions for code assessment development are
included in column 2 of Table 14-53.
Table 14-53 —Erosion and sediment control
column 1 column 2
Specific Outcomes Probable solutions (if code assessment)
14.124 Effects of works
Erosion and drainage control, sediment
capture and stormwater runoff S1.1 Construction works are designed,
O1 Development design, density, layout, and planned and executed with respect to the
staging provide for erosion control, drainage principles of erosion reduction, drainage
control and sediment capture and treatment management and sediment capture in
during the construction phase. accordance with Appendix 2, Table A of the
Queensland State Planning Policy and
International Erosion Control Association Best
Practice Erosion and Sediment Control
(BPESC) 2008;
14-130
Erosion and Sediment Control Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections.pdfRelated documentPublic source context ↗
2017-11-07-p-e-committee-attachment-1-to-item-1-amendments-for-multiple-housing-type-2-duplex-minor-corrections-pdfRelated documentPublic source context ↗
About this file
- File size
- 9.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.