Minor Change Existing Approval MCU21/0156.03 [As Published]

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

               52.    Permanent educational signage must be erected to educate the public about the function of
                      the bioretention device(s).
               53.    All stormwater quality treatment devices must be maintained in accordance with the Water
                      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). Records of all
                      maintenance activities undertaken must be kept and made available to Council upon request
               54.    Any proposed Community Management Statement required for the development must
                      include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
                      must include the full cost of maintaining the system in accordance with Water by Design
                      (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
                      system must be included in the proposed levies for each unit owner.
                      Erosion and Sediment Control
               55.    In conjunction with the application for Operational Works approval, provide an erosion and
                      sediment control plan, prepared in accordance with Best Practice Erosion and Sediment
                      Control (IECA, 2008) and which achieves the construction phase stormwater design
                      objectives of the State Planning Policy 2017. In addition, the ESCP is to demonstrate how
                      the downstream residential properties will be protected from increases in peak flows and
                      contaminated (with sediment) site runoff through all stages of construction.
               DEMOLITION
                      Performance Bond
               56.    Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
                      submitted to Council prior to the issue of a Development Permit for Building Works for
                      demolition, to secure the demolition conditions of this approval. The cash bond or trading
                      bank guarantee will be returned on performance of the demolition conditions of this approval
                      less any costs incurred by Council in respect of enforcing performance of these demolition
                      conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
                      compliance with conditions.
                      Works
               57.    Demolition must be undertaken in a manner that causes no detrimental effect upon the
                      amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
                      hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
                      in accordance with the nuisance provisions of the Environmental Protection Act 1994.
                      Waste management
               58.    A Waste Management Plan (demolition) must be submitted in accordance with Planning
                      Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
                      prior to issue of a development permit for Building Works for demolition, removal or
                      relocation.
                      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
                      effective reuse and recycling of such materials. Segregated wastes attract significantly
                      reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
                      mixed waste.
                      Waste storage areas must provide for adequate separation of all reusable, recyclable and
                      waste materials. These must be located so that they are convenient and safe to use.
                      The Plan must contain the following information:
                      a.      The areas for the storage and separation of waste shown on a site plan;
                      b.      A waste management table as indicated below is to be completed showing how waste
                              material is to be segregated - recycled – reused or disposed; and
                      c.      Table – Waste Management Table




                                                                                                     Page 11 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025


[OCR of page images]
52.

53.

54.

55.

Permanent educational signage must be erected to educate the public about the function of
the bioretention device(s).

All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). Records of all
maintenance activities undertaken must be kept and made available to Council upon request

Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
must include the full cost of maintaining the system in accordance with Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
system must be included in the proposed levies for each unit owner.

Erosion and Sediment Control

In conjunction with the application for Operational Works approval, provide an erosion and
sediment control plan, prepared in accordance with Best Practice Erosion and Sediment
Control (IECA, 2008) and which achieves the construction phase stormwater design
objectives of the State Planning Policy 2017. In addition, the ESCP is to demonstrate how
the downstream residential properties will be protected from increases in peak flows and
contaminated (with sediment) site runoff through all stages of construction.

DEMOLITION

56.

57.

58.

Performance Bond

Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council prior to the issue of a Development Permit for Building Works for
demolition, to secure the demolition conditions of this approval. The cash bond or trading
bank guarantee will be returned on performance of the demolition conditions of this approval
less any costs incurred by Council in respect of enforcing performance of these demolition
conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.

Works

Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.

Waste management

A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
prior to issue of a development permit for Building Works for demolition, removal or
relocation.

The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.

Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.

The Plan must contain the following information:
a. | The areas for the storage and separation of waste shown on a site plan;

b. | Awaste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled — reused or disposed; and

Cc. Table — Waste Management Table

Page 11 of 16

Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025

Used in these records

About this file

File size
200 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval MCU21_0156.03 [As Published].pdf · 200 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.