Minor Change Existing Approval MCU21/0156.03 [As Published]
52. Permanent educational signage must be erected to educate the public about the function of
the bioretention device(s).
53. All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). Records of all
maintenance activities undertaken must be kept and made available to Council upon request
54. Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
must include the full cost of maintaining the system in accordance with Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
system must be included in the proposed levies for each unit owner.
Erosion and Sediment Control
55. In conjunction with the application for Operational Works approval, provide an erosion and
sediment control plan, prepared in accordance with Best Practice Erosion and Sediment
Control (IECA, 2008) and which achieves the construction phase stormwater design
objectives of the State Planning Policy 2017. In addition, the ESCP is to demonstrate how
the downstream residential properties will be protected from increases in peak flows and
contaminated (with sediment) site runoff through all stages of construction.
DEMOLITION
Performance Bond
56. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council prior to the issue of a Development Permit for Building Works for
demolition, to secure the demolition conditions of this approval. The cash bond or trading
bank guarantee will be returned on performance of the demolition conditions of this approval
less any costs incurred by Council in respect of enforcing performance of these demolition
conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Works
57. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste management
58. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
prior to issue of a development permit for Building Works for demolition, removal or
relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
Page 11 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025
[OCR of page images]
52.
53.
54.
55.
Permanent educational signage must be erected to educate the public about the function of
the bioretention device(s).
All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). Records of all
maintenance activities undertaken must be kept and made available to Council upon request
Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
must include the full cost of maintaining the system in accordance with Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
system must be included in the proposed levies for each unit owner.
Erosion and Sediment Control
In conjunction with the application for Operational Works approval, provide an erosion and
sediment control plan, prepared in accordance with Best Practice Erosion and Sediment
Control (IECA, 2008) and which achieves the construction phase stormwater design
objectives of the State Planning Policy 2017. In addition, the ESCP is to demonstrate how
the downstream residential properties will be protected from increases in peak flows and
contaminated (with sediment) site runoff through all stages of construction.
DEMOLITION
56.
57.
58.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council prior to the issue of a Development Permit for Building Works for
demolition, to secure the demolition conditions of this approval. The cash bond or trading
bank guarantee will be returned on performance of the demolition conditions of this approval
less any costs incurred by Council in respect of enforcing performance of these demolition
conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Works
Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste management
A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
prior to issue of a development permit for Building Works for demolition, removal or
relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. | The areas for the storage and separation of waste shown on a site plan;
b. | Awaste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled — reused or disposed; and
Cc. Table — Waste Management Table
Page 11 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21/0156.03 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 200 KB (small file)
- File type
No other editions are linked here.