                          MATERIALS ON-SITE                                   DESTINATION
                                                                  Re-use and Recycling                    Disposal
                          Expected waste    Estimated  On-site                 Off-site               *specify contractor
                          materials         volume(m³) *specify     proposed   *specify contractor    and landfill site or
                                                         re-use or on-site     and recycling outlet   other disposal site
                                                         recycling methods
                          Excavation
                          material
                          Green waste
                          Bricks
                          Concrete
                          Timber-please
                          specify
                          Plasterboard
                          Metals - please
                          specify
                          Asbestos
                          Other - please
                          specify
                      Note * If a demolition contractor is undertaking works, then the Waste Management table is
                      to be completed by the demolition contractor.
                      Damage to infrastructure
               59.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
                      Vacant site
               60.    The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
                      and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or
                      landscaped in accordance with Planning Scheme Policy PSP 2 – Landscaping and to the
                      satisfaction of Council so as to not cause nuisance to the surrounding area.
               61.    All waste materials must be removed from site.
                      Litter, erosion and sediment control
               62.    Litter, erosion and sediment control measures must be installed and maintained until soils
                      are stabilised by turf, vegetation or sealed.
                      Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).
                      Asbestos
               63.    Removal of building materials containing asbestos must be undertaken by a licensed
                      asbestos removalist.
               64.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               65.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2006 and the Environmental Protection
                      Regulation 2008.
                      Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.




                                                                                                       Page 12 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025


[OCR of page images]
59.

60.

61.

62.

63.

64.

65.

 

MATERIALS ON-SITE DESTINATION

 

 

Re-use and Recycling Disposal
Expected waste | Estimated On-site Off-site *specify contractor
materials volume(m?) *specify proposed | “specify contractor | and landfill site or

re-use or on-site | and recycling outlet | other disposal site
recycling methods

 

Excavation
material

 

Green waste

 

Bricks

 

Concrete

 

Timber-please
specify

 

Plasterboard

 

Metals - please
specify

 

Asbestos

 

Other - please
specify

 

 

 

 

 

 

 

Note * If a demolition contractor is undertaking works, then the Waste Management table is
to be completed by the demolition contractor.

Damage to infrastructure

Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.

Vacant site

The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or
landscaped in accordance with Planning Scheme Policy PSP 2 — Landscaping and to the
satisfaction of Council so as to not cause nuisance to the surrounding area.

All waste materials must be removed from site.
Litter, erosion and sediment control

Litter, erosion and sediment control measures must be installed and maintained until soils
are stabilised by turf, vegetation or sealed.

Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
system (e.g. roadside gutter).

Asbestos

Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.

Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.

All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.

Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
businesses that transport asbestos waste, and landfills that accept this waste.

Page 12 of 16

Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025

Used in these records

About this file

File size
200 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval MCU21_0156.03 [As Published].pdf · 200 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.