Skip to the record
Every meeting, every word.

Council archive · source document

05. Hales - Planning Report · OPW20/0118

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

PROJECT URBAN – 20152                                                                                    1 Jul 2020


 Performance Criteria                Acceptable Solution                             Comments
                                        the extent it is more stringent than the
                                        standard mentioned paragraph (a);
                                     d) any other relevant planning scheme
                                        standard that is not inconsistent with
                                        the     standards      mentioned      in
                                        paragraphs (a), (b) and (c).

 Performance Criteria                Acceptable Solution                             Comments
 Earthwork and Vegetation
 7.1 Excavation and filling for      The earthwork and filling for the prescribed    Compliant.
 prescribed tidal work:-             tidal work is consistent with each relevant
 a) is carried out only to the       planning scheme standard.                       Only the minimum excavation
     extent         reasonably                                                       necessary for the wall works
     necessary for the work;                                                         and placement of the jetty will
     and                                                                             occur. A temporary sediment
 b) does not have a                                                                  control measure will be used to
     significant       adverse                                                       ensure disturbance is kept in
     effect on:-                                                                     the site location. This is shown
     (i) the natural features,                                                       on the proposed plans.
          including the banks,
          of the tidal water in
          the           works’
          immediate
          surroundings; or
     (ii) the level of the
          surface of the land
          under the tidal
          water in the works’
          immediate
          surroundings or any
          foreshore near the
          works.
 7.2       The location and          Vegetation on land affected by the              Not applicable.
 construction of prescribed          prescribed tidal works is dealt with in a way
 tidal      works      ensures       consistent with the following standards:-       No vegetation will be disturbed
 vegetation is cleared or            a) subject to paragraph (b), the clearing       on the site.
 disturbed only to the extent            or disturbance of vegetation for a
 reasonably necessary for the            purpose      associated      with     the
 work.                                   construction of prescribed tidal works,
                                         including, for example, parking for
                                         construction or workers’ vehicles or
                                         stockpiling of construction materials –
                                         (i) Is avoided; or
                                         (ii) If the clearing or disturbance of
                                              vegetation     for    a    purpose
                                              associated with the construction of
                                              a works cannot be avoided – the

Development Assessment Report                                                                            Page 17 of 42
Operational Works
35 Mossman Court, Noosa Heads 4567

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05. Hales - Planning Report.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.