05. Hales - Planning Report · OPW20/0118
PROJECT URBAN – 20152 1 Jul 2020
Subject Site
Figure 7: Marine amenity Mossman Court & Witta Circle (Source: Nearmap 2020)
5.0 PROPOSED WORKS
This application seeks a Development Permit for Operational Works for:-
1. Removal of the existing retaining wall, boat ramp and jetty; and
2. Installation of a new boundary wall and jetty.
The demolition works is shown in Figure 8 below. This involves the removal of the existing finger jetty,
retaining wall and small concrete ramp located on the south-western corner of the property. The foreshore
rocks and grassed area (labelled as “Landscaping” in figure 8) will also be removed to allow for the
construction of the new boundary wall and reshaped to allow for the jetty entry access.
Figure 8: Demolition works
Development Assessment Report Page 9 of 42
Operational Works
35 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
05. Hales - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.