The new boundary wall will be constructed along the boundary line of the property with no portion of the
wall extending past the defined boundary. The boundary wall will be constructed of masonry block and have
a finished level of approximately RL 1.5m AHD. The new jetty will be freestanding and not connect to the
new wall but rather abut up to the same level as the top of the new wall.
Figure 9: Proposed works
The jetty deck will initially slope down slightly keeping a low profile in line with the beach level and then level
out with a finished level of RL 0.8m AHD. The jetty will extend a total of 12m from the boundary wall to the
designated quay line. It will be constructed of timber with 200mm diameter treated hardwood piles for
support. The jetty is to be right-turned with a head of 7000mm in length and 1500m in width. There will be
a handrail down one side of the jetty as required for Australian Standards.
Figure 10: Proposed elevation of the works
Development Assessment Report Page 10 of 42
Operational Works
35 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
05. Hales - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.