Original source · versioned page text
Attachment C - SWMP Report by Bax Engineering_compressed
It is noted that the proposed development has a reduced impervious area compared to the existing site. It is
also highlighted that no flows currently reach the Bartlett Street frontage (with all flows diverted to the pipe
network). It is expected that with an increased pipe capacity and a diversion of major flows from this system,
stormwater mitigation should be improved.
Flooding
Flood mapping courtesy of the Noosa Council (ARCGIS Web Map) indicates the site is not subject to flooding
from any sources.
The mapping demonstrates all defined flood extents limited to the parkland in the west.
Page 8 of 14
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.