Attachment C - SWMP Report by Bax Engineering_compressed
STORMWATER QUALITY MANAGEMENT
The proposed development is an industrial lot which includes, driveways and carparks. It is proposed that the
driveways and carparks will flow to a single catchment shown as 1/1 as show in Figure 3.
Figure 3 – Proposed catchment plan
CONSTRUCTION PHASE
The design milestones for water quality during the construction phase of the development will be in
accordance with Table A of the SPP Code: Water Quality. The design objectives will be achieved using approved
Sediment and Erosion Control measures.
General pollutants generated during construction are listed in Table 1 below.
Page 9 of 14
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.