Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Attachment C - SWMP Report by Bax Engineering_compressed

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

           STORMWATER QUALITY MANAGEMENT

The proposed development is an industrial lot which includes, driveways and carparks. It is proposed that the
driveways and carparks will flow to a single catchment shown as 1/1 as show in Figure 3.




Figure 3 – Proposed catchment plan



         CONSTRUCTION PHASE

The design milestones for water quality during the construction phase of the development will be in
accordance with Table A of the SPP Code: Water Quality. The design objectives will be achieved using approved
Sediment and Erosion Control measures.


General pollutants generated during construction are listed in Table 1 below.




                                              Page 9 of 14
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092           [email protected]
Log in to download the original file

Attachment C - SWMP Report by Bax Engineering_compressed.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.