Council archive · source document
Delegated Report - Code - Planning MCU23 0163 [As Published] · MCU23/0163
Street address: 30 Mossman Ct Noosa Heads Qld 4567 Real property description: Lot 149 N 21859 Planning Scheme: Noosa Plan 2020 (25 September 2020) 2. DECISION DETAILS Council decided to issue the following type of approval: • Development Permit for Approval for Material Change of Use - Landing – Residential • Development Permit for Approval for Operational Works – Landing & Jetty 3. CURRENCY PERIOD OF APPROVAL The currency period for this development approval is stated in the conditions below. 4. ASSESSMENT MANAGER CONDITIONS Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date TJS-SJ-04870-02 B Layout Plan 2 February 2024 Prepared by The Jetty Specialist TJS-SJ-04870-03 B Elevation 2 February 2024 Prepared by The Jetty Specialist Currency Period 2. The Currency Period for this development approval lapses if all conditions have not been complied with, and the plan of survey lodged with Council for endorsement by 23 February 2026, unless an application to extend the currency period is approved by Council. Performance Bond 3. Security in the form of a cash bond or trading bank guarantee to the sum of $2,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the commencement of the works. The cash bond or trading bank guarantee will be returned on performance of the conditions of this approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. General Conditions 4. The maximum number of vessels that may be berthed, moored, attached or stored on the structure must not exceed 2. 5. The use of the pontoon must not cause any adverse effects on the amenity of the surrounding areas including changes to light, views, air quality and noise. 6. Vessels berthed/moored at the pontoon must be located a minimum of 3.0 metres from the prolongation of the property boundaries. 7. Vessels and boatlifting devices must be connected directly to the pontoon, and not located side by side or in tandem with another vessel. Page 4 of 6 Document Set ID: 22822207 Version: 4, Version Date: 06/03/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU23 0163 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.