               8.     All structures must be designed and constructed such that they are free standing within the
                      waterway and are not connected to or behind the revetment wall.
               9.     All structures must have no detrimental effects on stormwater drains and/or easements.
               10.    A rigid handrail must be fitted on one side of the gangway. The handrail must be of an open
                      design and in accordance with the approved plans.
               11.    No posts or vertical supports of the proposed pontoon are to extend vertically from the
                      structure unless they provide necessary support for the handrail.
               12.    No boatlifting devices are to be attached or moored at the pontoon structure for the purpose
                      of elevating a vessel above the water without Council approval.
               13.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               14.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               15.    The pontoon is to be used for private purposes only with no commercial operations to be
                      undertaken.
               16.    Boat repair activities are not permitted on site.
               17.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               18.    The mooring facility must not be utilised for live-aboard purposes.
               19.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               20.    Certification by a Registered Professional Engineer of Queensland that states that the
                      pontoon is constructed in accordance with best practice methods and is structurally sound
                      must be submitted to Council. This certification must be submitted to Council within three (3)
                      months of the completion of the works. A final inspection and approval of the structure by
                      Council’s Inspector is also required. Please contact Council’s Development Assessment
                      Branch on 5329 6500 to arrange the inspection.
               21.    This approval lapses where the construction of the pontoon has not commenced within two
                      (2) years of the date of issue of the approval unless application is made and approved by
                      Council for an extension.
               22.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.




                                                                                                       Page 5 of 6

Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU23 0163 [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.