Civil Engineering Report
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
3 March 2022 8 ROADWORKS The existing asphalt crossover off Butler Street will be removed and the verge reinstated in accordance with Noosa Shire Council requirements. New driveways will be constructure with the future building works suit the building layout. No new driveways are to be constructed with the proposed subdivision. The existing crossover location is shown on the subdivision plan prepared by Site Surveys attached in Appendix 2. All roadworks will be designed and constructed in accordance with the relevant Noosa Shire Council and Australian Standards. 9 EARTHWORKS It is not proposed to undertake any earthworks as part of the reconfiguration of a lot. Any minor earthworks to create a level pad for the buildings and the new retaining walls will be undertaken as part of the building works. The design and construction of the earthworks will be undertaken in accordance with AS 3798 – Guidelines on Earthworks for Commercial and Residential Developments. Any excavated material not suitable for reuse as fill will be removed from the site and disposed of appropriately in an approved landfill. All filling operations will be completed under level 1 geotechnical supervision. As no excavations are proposed to expose subsoil at or below RL 5.0m, the development is not subject to the State Planning Policy July 2017 and consequently, will not require an Acid Sulfate Soil investigation to be undertaken as part of the Development Application. 10 ELECTRICITY AND COMMUNICATIONS The proposed development will be serviced for electricity and telecommunications from the existing overhead and underground infrastructure in Butler Street and Ghostgum Court. All works will be undertaken in accordance with the appropriate authority and Australian Standards. The existing Telstra, NBN and Energex underground infrastructure in the vicinity of the site is shown on the DBYD plans attached in Appendix 4, 5 and 6 respectively. 11 GAS There are no reticulation gas mains located on the vicinity of the site. If gas is required to service the site, APA will need to be contacted to arrange a connection to the site. Excellence with Economy in Engineering 13 l:\9000-9999\9200-9299\9279\report\03-03-22 civil engineering report_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.