Civil Engineering Report

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

 3 March 2022



8         ROADWORKS
The existing asphalt crossover off Butler Street will be removed and the verge reinstated in
accordance with Noosa Shire Council requirements.

New driveways will be constructure with the future building works suit the building layout. No new
driveways are to be constructed with the proposed subdivision.

The existing crossover location is shown on the subdivision plan prepared by Site Surveys attached
in Appendix 2.

All roadworks will be designed and constructed in accordance with the relevant Noosa Shire
Council and Australian Standards.


9         EARTHWORKS
It is not proposed to undertake any earthworks as part of the reconfiguration of a lot.

Any minor earthworks to create a level pad for the buildings and the new retaining walls will be
undertaken as part of the building works.

The design and construction of the earthworks will be undertaken in accordance with AS 3798 –
Guidelines on Earthworks for Commercial and Residential Developments.

Any excavated material not suitable for reuse as fill will be removed from the site and disposed of
appropriately in an approved landfill.

All filling operations will be completed under level 1 geotechnical supervision.

As no excavations are proposed to expose subsoil at or below RL 5.0m, the development is not
subject to the State Planning Policy July 2017 and consequently, will not require an Acid Sulfate
Soil investigation to be undertaken as part of the Development Application.


10        ELECTRICITY AND COMMUNICATIONS
The proposed development will be serviced for electricity and telecommunications from the
existing overhead and underground infrastructure in Butler Street and Ghostgum Court. All works
will be undertaken in accordance with the appropriate authority and Australian Standards.

The existing Telstra, NBN and Energex underground infrastructure in the vicinity of the site is
shown on the DBYD plans attached in Appendix 4, 5 and 6 respectively.


11        GAS
There are no reticulation gas mains located on the vicinity of the site.

If gas is required to service the site, APA will need to be contacted to arrange a connection to the
site.



 Excellence with Economy in Engineering                                                                13
 l:\9000-9999\9200-9299\9279\report\03-03-22 civil engineering report_issue a.docx
Log in to download the original file

Civil Engineering Report.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.