Original source · versioned page text
Civil Engineering Report
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Dams PO11 AO11.1 RO11.1 Dam location and construction does not impact upon Development does not involve: Not applicable. neighbouring properties in terms of— (a) excavation on land previously occupied by a notifiable a) hydrology; activity or on land listed on the Environmental Management Register or the Contaminated Land b) alteration of existing overland flowpaths and patterns; Register; c) landslide or failure of dam wall; and (b) filling with material containing a contaminant. d) effluent disposal areas. AO11.2 RO11.2 Where the site is in the Rural Zone— Not applicable. a) the land has a slope of less than 25% (1:4); and b) the earthworks including cut and fill batters and retaining walls are setback a minimum of 50m from the property boundary; and c) the size of the lot is greater than 5 hectares; AND AO11.3 RO11.3 For all other zones— Not applicable. No solution provided. l:\9000-9999\9200-9299\9279\code\03-03-22 earthworks code.docx Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.