Skip to the record
Every meeting, every word.

Original source · versioned page text

Civil Engineering Report

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
83 Butler Street, Tewantin
3 March 2022

                PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                              RESPONSE

Dams
PO11                                                             AO11.1                                                       RO11.1
Dam location and construction does not impact upon               Development does not involve:                                Not applicable.
neighbouring properties in terms of—
                                                                 (a) excavation on land previously occupied by a notifiable
a) hydrology;                                                    activity or on land listed on the Environmental
                                                                 Management Register or the Contaminated Land
b) alteration of existing overland flowpaths and patterns;       Register;

c) landslide or failure of dam wall; and                         (b) filling with material containing a contaminant.

d) effluent disposal areas.
                                                                 AO11.2                                                       RO11.2
                                                                 Where the site is in the Rural Zone—                         Not applicable.

                                                                 a) the land has a slope of less than 25% (1:4); and

                                                                 b) the earthworks including cut and fill batters and
                                                                 retaining walls are setback a minimum of 50m from the
                                                                 property boundary; and

                                                                 c) the size of the lot is greater than 5 hectares;

                                                                 AND
                                                                 AO11.3                                                       RO11.3
                                                                 For all other zones—                                         Not applicable.

                                                                 No solution provided.




l:\9000-9999\9200-9299\9279\code\03-03-22 earthworks code.docx
                                                                                            Page 5
Log in to download the original file

Civil Engineering Report.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.