Civil Engineering Report

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 42, section 1. The text section number identifies this passage in the reader.

EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
83 Butler Street, Tewantin
3 March 2022

              PERFORMANCE OUTCOMES                                                 ACCEPTABLE OUTCOMES                                                  RESPONSE

Erosion and drainage control, sediment capture and stormwater runoff
PO1                                                                AO1.1                                                        RO1.1

Development design, density, layout, and staging provide           Construction works are designed, planned and executed        Complies – The proposed construction works will be
for erosion control, drainage control and sediment capture         with respect to the principles of erosion reduction,         designed, planned and executed with respect to the
and treatment during the construction phase.                       drainage management and sediment capture in                  principles of erosion reduction, drainage management and
                                                                   accordance with Appendix 2, Table A of the Queensland        sediment capture in accordance with Appendix 2, Table A of
                                                                   State Planning Policy and                                    the Queensland State Planning Policy and International
                                                                                                                                Erosion Control Association Best Practice Erosion and
                                                                   International Erosion Control Association Best Practice      Sediment Control (BPESC) 2008.
                                                                   Erosion and Sediment Control (BPESC) 2008;

                                                                   AND
                                                                   AO1.2                                                        RO1.2

                                                                   Construction works are designed and managed to restrict      Complies – The proposed construction works will be
                                                                   the extent of clearing and soil exposure to that necessary   designed and managed to restrict the extent of clearing and
                                                                   for access, and safe construction;                           soil exposure to that necessary for access, and safe
                                                                                                                                construction.
                                                                   AND
                                                                   AO1.3                                                        RO1.3

                                                                   Clean stormwater is diverted or managed around or            Complies – Where applicable, clean stormwater will be
                                                                   through the site without increasing the concentration of     diverted around the site without increasing the concentration
                                                                   total suspended solids or other contaminants in the flow     of total suspended solids or other contaminants in the flow
                                                                   and without causing erosion (onsite or offsite);             and without causing erosion (onsite or offsite).

                                                                   AND




l:\9000-9999\9200-9299\9279\code\03-03-22 erosion and sediment control code.docx
                                                                                             Page 1
Log in to download the original file

Civil Engineering Report.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.