Original source · versioned page text
Civil Engineering Report
Original PDF page 46, section 1. The text section number identifies this passage in the reader.
ROADS AND DRAINAGE CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE contributing catchments and the preservation of all AO1.3 RO1.3 weather access; On-road cycling treatment is utilised to provide safe and continuous movement of cyclists along a roadway, such Not applicable – No new public roads are proposed to be c) kerb and channel— as-- constructed as part of the development. i. controls vehicle movement by delineating the a) sealed shoulders; carriageway for all users; ii. conveys road pavement run-off to stormwater b) wide kerbside lane; drainage in a manner that allows the road to be c) exclusive or peak period bicycle lane; trafficable in Q100 ARI local rainfall events; and d) verges and footpaths provide— d) advisory treatments such as Bicycle Awareness Zone; i. safe access for pedestrians and cyclists clear of e) shared parking / bicycle lane; obstructions; ii. an access area for vehicles onto properties; f) contra flow bicycle lane; and iii. a corridor allocated for services and utilities; and iv. additional amenity for minor roads. g) bus/bicycle lane. AO1.4 RO1.4 The provision of bicycle lanes at intersections is generally Not applicable – No new public roads are proposed to be in accordance with AUSTROADS Part 14, section 5 and constructed as part of the development. the Manual of Urban Traffic Control Devices (MUTCD) Part 9. l:\9000-9999\9200-9299\9279\code\03-03-22 roads and drainage code.docx Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.