ROADS AND DRAINAGE CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE PO2 AO2.1 RO2.1 Stormwater drainage infrastructure is planned, designed Stormwater drainage planning, design and construction is Complies – All proposed stormwater drainage will be and constructed to— in accordance with Section 4 of PSP5 Engineering Design designed and constructed in accordance with Section 4 of Standards – Roads, Drainage and Earthworks; PSP5 Engineering Design Standards – Roads, Drainage a) be accessible, cost effective and easily maintainable; and Earthworks. AND b) protect downstream capacity;. AO2.2 RO2.2 As Constructed data is submitted in accordance with Complies – Where applicable, as constructed data will be c) protect downstream water quality; Section 6 of PSP5 Engineering Design Standards – submitted in accordance with Section 6 of PSP5 d) maximise on-site stormwater retention and retardation; Roads, Drainage and Earthworks; Engineering Design Standards – Roads, Drainage and and Earthworks. e) convey run-off to stormwater drainage in a manner that AO2.3 RO2.3 allows roads to be trafficable in Q100 ARI local rainfall Stormwater drainage planning, design and construction is Complies – The stormwater drainage planning, design and events. in accordance with the Queensland Urban Drainage construction will be undertaken in accordance with the Manual. Queensland Urban Drainage Manual. Environmental Protection. PO3 AO3.1 RO3.1 Roads and stormwater drainage infrastructure are located Roads and stormwater drainage follow the edge of Not applicable – All frontage roads and stormwater and aligned so as to— existing disturbed areas, or alternatively, these works are connections to the site are already constructed or will be co-located within a combined utility corridor; constructed prior to site completion. a) minimise disturbance to native vegetation and/or other habitat areas; AND AO3.2 RO3.2 b) protect and maintain wildlife corridor movements and the Roads avoid native vegetation and provide for fauna Not applicable – No new public roads are proposed to be safety of native fauna; underpasses and associated fencing where appropriate; constructed as part of the development. l:\9000-9999\9200-9299\9279\code\03-03-22 roads and drainage code.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.