Original source · versioned page text
Civil Engineering Report
Original PDF page 50, section 1. The text section number identifies this passage in the reader.
ROADS AND DRAINAGE CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE c) forming and grading to footpaths; d) vehicular kerb and footpath crossings; e) a constructed bikeway; f) a constructed footpath; g) a constructed carriageway; h) required alterations to public utility mains, services or installations; i) construction of any required alterations to public utility mains, services or installations; j) stormwater drainage works; and k) installation of electrical conduits; AND AO6.2 RO6.2 Road and drainage design and construction is in Not applicable - No new public roads or stormwater drainage accordance with Sections 3 and 4 of PSP5 Engineering infrastructure is proposed to be constructed as part of the Design Standards – Roads, Drainage and Earthworks. development. l:\9000-9999\9200-9299\9279\code\03-03-22 roads and drainage code.docx Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.