Original source · versioned page text
Civil Engineering Report
Original PDF page 49, section 1. The text section number identifies this passage in the reader.
ROADS AND DRAINAGE CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE PO4 AO4 RO4 Roads and stormwater drainage infrastructure is proven to No solution provided Not applicable - No new public roads or stormwater drainage be suitable for its use prior to Council accepting the infrastructure is proposed to be constructed as part of the dedicated asset. development. PO5 AO5.1 RO5.1 Alignment of stormwater drainage infrastructure is to allow The location, design and construction of stormwater Not applicable - No new public stormwater drainage for easy access for the ongoing maintenance by Council. drainage structures is in accordance with Sections 4 and 5 infrastructure is proposed to be constructed as part of the of PSP5, Engineering Design Standards - Roads, development. Drainage and Earthworks; AND AO5.2 RO5.2 Where infrastructure is located on private land an Not applicable - No new public stormwater drainage easement is dedicated over the infrastructure in infrastructure is proposed to be constructed as part of the accordance with Section 4 of PSP 5, Engineering Design development. Standards – Roads, Drainage and Earthworks. Frontage works PO6 AO6.1 RO6.1 Development is provided with external roadworks along the The following infrastructure components already exist at Complies – The frontage road to the development is fully full extent of the frontage of the site to an appropriate the frontage of the site or are provided at the developer’s constructed. standard having regard to the specified function of the road. expense— a) full width sealed road; b) concrete kerb and channel where appropriate; l:\9000-9999\9200-9299\9279\code\03-03-22 roads and drainage code.docx Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.