Safety Risks Mitigation
submitted to Council for review. Regular audits on
contractor compliance with these approved plans
will be undertaken by Council throughout
construction.
Preschool, and community Traffic and Specific requirements for contractor to manage
pedestrians must share Rufous street with safety of pedestrians and traffic are included in the
construction vehicles and machinery contract conditions. Regular audits on contractor
operating and accessing the work site. compliance with these approved plans will be
undertaken by Council throughout construction.
Environmental Harm Risks Mitigation
Environmental harm risks are generally The contractor is to prepare an environmental
limited to any contaminants found during management plan, workplace health and safety
excavation such as acid sulphate soils or management plan and safe work method
previously discarded materials such as statements to manage risks.
asbestos and unexploded ordinance. A hold point will be established prior to excavation
and a risk-based approach for construction
methodology to ensure impacts are minimised.
Scope And Quality Risks Mitigation
Risk of not meeting project objectives To be managed through Superintendent and
Council staff reviews supported by specialist
consultants who developed the designs and
specifications.
Public Disruption and Council Mitigation
Reputation Risks
There is a risk that the proposed pedestrian Specific requirements for contractor to manage
and traffic management plans do not safety of pedestrians and traffic are included in the
provide an acceptable level of service during contract conditions. Regular audits on contractor
the construction period compliance with these approved plans will be
undertaken by Council throughout construction.
There will be regular contact with adjacent tenants
to review impacts as well as weekly review of
systems in place and seek opportunities to
improve wherever possible.
Noise may be a cause of disruption due to Specific requirements for contractor to manage
noise from plant and equipment. safety of pedestrians and traffic are included in the
contract conditions. Regular audits on contractor
compliance with these approved plans will be
undertaken by Council throughout construction.
Vibration Not expected to be of concern due to excavation in
soft soils. Specific requirements are included in the
conditions to ensure that adequate notification of
surrounding tenants is provided.
Amenity of the site reduced by construction Propose to appropriately screen construction
process and not acceptable for surrounding fencing and work areas.
tenants.
Page 16 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.