IDAS Code responses · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
support its intended loads, having regard to its relevant (a) subject to paragraph (c), a pontoon open for use by the general
loading matters public or used for a commercial purpose is able to support at least the
following—
(i) a distributed live load of 3.0kPa;
(ii) a concentrated live load of 4.5kN;
(b) subject to paragraph (c), a pontoon other than a pontoon
mentioned in paragraph (a) is able to support at least the following—
(i) a distributed live load of 2.0kPa;
(ii) a concentrated live load of 4.5kN;
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent it is more stringent than the standard
mentioned in paragraph (a) or (b).
18.3 Prescribed tidal work that is a pontoon and used (s 6(2) solution) N/A
only for rowing is designed and constructed in a way to The design and construction of the pontoon is consistent with the
ensure— following standards—
(a) it is able to support its intended loads, having regard (a) subject to paragraph (c), the access walkway of a pontoon used
to its relevant loading matters; and only for rowing is able to support at least a live load of 3.0kPa;
(b) it is safe for persons using the pontoon to launch and (b) the flotation unit of a pontoon used only for rowing is able to
retrieve rowing vessels. support at least a live load of 1.5kPa;
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent it is more stringent than the standard
mentioned in paragraph (a) or (b).
18.4 Prescribed tidal work that is a pontoon is designed (s 6(2) solution) N/A
and constructed in a way to ensure any load applied to The design and construction of the pontoon is consistent with the
the pontoon by a person or thing on the pontoon does following standards—
not cause the pontoon to tip over or tilt to a degree (a) subject to paragraph (f), a pontoon’s access walkway extends at
causing the person or thing to fall off the pontoon. least 500mm onto the pontoon’s flotation unit;
(b) subject to paragraph (f), a pontoon’s access walkway is constructed
with a material that has a non-slippery surface;
(c) for a pontoon used only for rowing—subject to paragraph (f), at
least 75mm of the height of the pontoon’s flotation unit remains above
the water over which it is constructed if a distributed live load is applied
to half of the surface of the pontoon’s flotation unit and all of the
surface of the pontoon’s access walkways;
(d) for a pontoon other than a pontoon mentioned in paragraph (c)—
subject to paragraph (f), the top surface of the pontoon’s flotation
unit remains above the water over which it is constructed if a
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.