IDAS Code responses · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
distributed live load of 1.5kPa is applied to half of the surface of the
pontoon’s flotation unit and all of the surface of the pontoon’s access
walkways;
(e) subject to paragraph (f), the whole base of the pontoon’s flotation
unit remains in contact with the water over which it is constructed at all
times and tilts no more than 15º at any time;
(f) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a), (b), (c), (d) or (e)—the relevant
planning scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a), (b), (c), (d) or (e).
18.5 Prescribed tidal work that is a pontoon is designed The design and construction of the pontoon is consistent with the N/A
and constructed in a way to ensure it remains above the following standards—
water at all times. (a) subject to paragraph (b), the pontoon’s abutment is located no less
than 300mm above the water at high water mark;
(b) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a).
18.6 Prescribed tidal work that is a pontoon is designed The design and construction of the pontoon is consistent with the N/A
and constructed in a way to ensure that if tidal water following standards—
levels change, the pontoon’s flotation unit will— (a) subject to paragraph (c), the pontoon’s flotation unit is—
(a) rise and fall to allow for the change; and (i) attached, through the pontoon’s system for mooring the unit, to
(b) not be separated from the lot to which the pontoon is concrete anchors in the bank landward of the pontoon; or
connected (ii) moored by piles;
(b) subject to paragraph (c), if a tidal water level change resulting from
a 1% probability flood event would cause a pontoon’s flotation unit to
detach from the system for mooring the unit—
(i) the standard applying under paragraph (a); and
(ii) the pontoon’s flotation unit is restrained with a tethering system so
that it can withstand the effects of the event;
Design, construction and safety—retaining walls, revetments and seawalls
19.1 Prescribed tidal work that is a retaining wall, (s 6(2) solution) N/A
revetment or seawall, is designed and constructed in a The design and construction of the retaining wall, revetment or seawall
way to ensure it is able to support its intended loads, is consistent with the following standards—
having regard to its relevant loading matters. (a) subject to paragraph (b), a retaining wall, revetment or seawall is
able to support at least a distributed live load of 3.0kPa;
(b) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme standard, to the extent it is more
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.