Council archive · source document
IDAS Code responses · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
the following— (a) subject to paragraph (e),prescribed tidal work does not extend past
(a) the character and amenity of the work’s immediate the side boundary or extended side boundary of the lot connected to
surroundings and the locality within which the work is the work;
located; (b) subject to paragraph (e),prescribed tidal work is the only work of its
(b) if the relevant planning scheme states the desired type along the edge of the tidal water fronting the lot connected to the
character or amenity for the work’s immediate work;
surroundings or the locality within which the work is (c) subject to paragraph (e),prescribed tidal work that is a boardwalk or
located—the stated desired character or amenity. independent deck is not roofed;
(d) subject to paragraph (e), prescribed tidal work other than a
boardwalk or deck is not roofed unless it is the main access to land;
(e) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a),(b), (c) or (d)—the relevant
planning scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a), (b), (c) or (d);
(f) any other relevant planning scheme standard that is not inconsistent
with the standards mentioned in paragraphs (a) to (e).
2.2 Prescribed tidal work not in a canal and for a non- The design and construction of the prescribed tidal work is consistent Complies – the works do no extend past the side
private purpose is compatible with its location, having with the following standards— boundary of the lots.
regard to the following— (a) subject to paragraph (c), prescribed tidal work used for a
(a) the character and amenity of the work’s immediate commercial purpose does not extend past the side boundary or
surroundings and the locality within which the work is extended side boundary of the lot connected to the work;
located; (b) subject to paragraph (c),prescribed tidal work used
(b) if the relevant planning scheme states the desired for a commercial purpose is not roofed unless it is the main access to
character or amenity for the work’s immediate land;
surroundings or the locality within which the work is (c) if a relevant planning scheme standard is more stringent than the
located—the stated desired character or amenity. standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent the standard is more stringent than the
standard mentioned in paragraph (a) or (b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to (c).
Character and amenity (height, scale and size)
3.1 Prescribed tidal work is of a height, scale and size to The height, scale and size of the prescribed tidal work is consistent Complies – pipeline is underground and does not
ensure the work is compatible with the character and with each relevant planning scheme standard. affect amenity.
amenity of its location, having regard to the
following—
(a) the height, scale and size of the natural features of
the work’s immediate surroundings and the
locality within which the work is located;
(b) the height, scale and size of the existing buildings or
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.