_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd


the following—                                                  (a) subject to paragraph (e),prescribed tidal work does not extend past
(a) the character and amenity of the work’s immediate           the side boundary or extended side boundary of the lot connected to
surroundings and the locality within which the work is          the work;
located;                                                        (b) subject to paragraph (e),prescribed tidal work is the only work of its
(b) if the relevant planning scheme states the desired          type along the edge of the tidal water fronting the lot connected to the
character or amenity for the work’s immediate                   work;
surroundings or the locality within which the work is           (c) subject to paragraph (e),prescribed tidal work that is a boardwalk or
located—the stated desired character or amenity.                independent deck is not roofed;
                                                                (d) subject to paragraph (e), prescribed tidal work other than a
                                                                boardwalk or deck is not roofed unless it is the main access to land;
                                                                (e) if a relevant planning scheme standard is more stringent than the
                                                                standard mentioned in paragraph (a),(b), (c) or (d)—the relevant
                                                                planning scheme standard, to the extent it is more stringent than the
                                                                standard mentioned in paragraph (a), (b), (c) or (d);
                                                                (f) any other relevant planning scheme standard that is not inconsistent
                                                                with the standards mentioned in paragraphs (a) to (e).
2.2 Prescribed tidal work not in a canal and for a non-         The design and construction of the prescribed tidal work is consistent       Complies – the works do no extend past the side
private purpose is compatible with its location, having         with the following standards—                                                boundary of the lots.
regard to the following—                                        (a) subject to paragraph (c), prescribed tidal work used for a
(a) the character and amenity of the work’s immediate           commercial purpose does not extend past the side boundary or
surroundings and the locality within which the work is          extended side boundary of the lot connected to the work;
located;                                                        (b) subject to paragraph (c),prescribed tidal work used
(b) if the relevant planning scheme states the desired          for a commercial purpose is not roofed unless it is the main access to
character or amenity for the work’s immediate                   land;
surroundings or the locality within which the work is           (c) if a relevant planning scheme standard is more stringent than the
located—the stated desired character or amenity.                standard mentioned in paragraph (a) or (b)—the relevant planning
                                                                scheme standard, to the extent the standard is more stringent than the
                                                                standard mentioned in paragraph (a) or (b);
                                                                (d) any other relevant planning scheme standard that is not
                                                                inconsistent with the standards mentioned in paragraphs (a) to (c).
Character and amenity (height, scale and size)
3.1 Prescribed tidal work is of a height, scale and size to     The height, scale and size of the prescribed tidal work is consistent        Complies – pipeline is underground and does not
ensure the work is compatible with the character and            with each relevant planning scheme standard.                                 affect amenity.
amenity of its location, having regard to the
following—
(a) the height, scale and size of the natural features of
the work’s immediate surroundings and the
locality within which the work is located;
(b) the height, scale and size of the existing buildings or


IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose                                                                                                          pg. 2

Used in these records

About this file

File size
388 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

IDAS Code responses.pdf · 388 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.