Council archive · source document
IDAS Code responses · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
other structures in the work’s immediate surroundings
and the locality within which the work is located;
(c) if the relevant planning scheme states the desired
height, scale or size of buildings or other structures in
the work’s immediate surroundings or the locality within
which the work is located—the stated desired height,
scale or size.
Character and amenity (materials and colours)
4.1 The materials used for, and the colours of, The materials used for, and colours of, the prescribed tidal work are Complies – pipeline is underground and does not
prescribed tidal work are compatible with the character consistent with each relevant planning scheme standard. affect amenity.
and amenity of the work’s location, having regard
to the following—
(a) the natural features of the work’s immediate
surroundings and the locality within which the work is
located;
(b) the existing buildings or other structures in the work’s
immediate surroundings and the locality within which the
work is located;
(c) if the relevant planning scheme states the desired
materials to be used for, or desired colours of, buildings
or other structures in the work’s immediate surroundings
or the locality within which the work is located—the
stated desired materials or colours.
Lighting
5.1 Lighting, other than an aid to navigation, for The lighting for the prescribed tidal work, other than an aid to N/A
prescribed tidal work is installed in a way to navigation, is consistent with the following standards—
ensure the security and safe use of the work without (a) subject to paragraph (c), lighting for prescribed tidal
causing significant adverse effects on the amenity of the work is hooded and directed downwards;
locality within which the work is located. (b) subject to paragraph (c), each lighting standard, to the
extent relevant;
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent the standard is more stringent than the
standard mentioned in paragraph (a) or (b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to (c).
Signage
6.1 A sign erected or otherwise placed in position for A sign erected or otherwise placed in position for prescribed tidal N/A
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.