Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

SC3395-SWMP Rev A

Attached to the e-mail OPW15/0134 Application for Operational Works - 60 Hofmann Dr Noosaville.

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SC3395-Lot 4 Hofmann Drive, Noosaville                                                                    6




2.0 Water Cycle Management

2.1     Background
The purpose of this section of the SWMP is to outline water saving measures that will be implemented in
the design and construction of the proposed development.


2.2     Wastewater Minimisation
To reduce the impact of water demand from the development and to minimise the loading on the existing
sewerage network, it is intended to reduce the wastewater leaving the site through the use of “at source”
measures. This will include:
        Water saving shower roses with a AAA rating or better
        Dual flush toilet cisterns that do not exceed 6 litres on full flush and 3 litres on half flush
        The use of 3 star (or higher) water efficient appliances


2.3     Stormwater Harvesting Tanks
Subsequent to the State Government’s repeals to mandatory rainwater tank usage, the developer has not
opted to utilise rainwater harvesting or re-use related to this development.
Log in to download the original file

SC3395-SWMP Rev A.pdf · 983 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.