PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  9 FEBRUARY 2021


            Plasterboard
            Metals -
            please specify
            Asbestos
            Other - please
            specify

          Note * If a demolition contractor is undertaking works, then the Waste Management table
          is to be completed by the demolition contractor.
          Damage to infrastructure
    44.   Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
          bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
          Vacant site
    45.   The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
          and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or
          landscaped in accordance with Planning Scheme Policy PSP 2 – Landscaping and to
          the satisfaction of Council so as to not cause nuisance to the surrounding area.
    46.   All waste materials must be removed from site.
          Litter, erosion and sediment control
    47.   Litter, erosion and sediment control measures must be installed and maintained until
          soils are stabilised by turf, vegetation or sealed.
          Note: it is an offence under the Environmental Protection Act 1994 to deposit or
          potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
          water drainage system (e.g. roadside gutter).
          Asbestos
    48.   Removal of building materials containing asbestos must be undertaken by a licensed
          asbestos removalist.
    49.   Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
          requires a licensed asbestos removalist to give notice to Workplace Health and Safety
          Queensland (WHSQ) of licensed asbestos removal work at least five days before the
          work commences. Notification must be made using Form 65: Notification of licensed
          asbestos removal work, demolition work or emergency demolition.
    50.   All building materials containing asbestos products are wrapped and disposed of in
          accordance with the Public Health Regulation 2006 and the Environmental Protection
          Regulation 2008.
          Note: Asbestos is a Regulated Waste. The Department of Environment & Science
          licenses businesses that transport asbestos waste, and landfills that accept this waste.
    51.   All building materials containing asbestos, including asbestos cement sheeting or roofing
          and lagging are removed from the building prior to demolition/relocation.




                                                                                       Page 12 of 98
Log in to download the original file

2021-02-09 Planning and Environment Committee Meeting Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.