PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 FEBRUARY 2021
DEMOLITION
Performance Bond
41. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council’s Building and Plumbing Services prior to the issue of a
Development Permit for Building Works for demolition, to secure the demolition
conditions of this approval. The cash bond or trading bank guarantee will be returned on
performance of the demolition conditions of this approval less any costs incurred by
Council in respect of enforcing performance of these demolition conditions. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Works
42. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection
Act 1994.
Waste management
43. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP10 - Waste Management and approved by Council’s Waste
Coordinator prior to issue of a development permit for Building Works for demolition,
removal or relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for
the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate fees
are charged for mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable
and waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify
waste volume(m³) *specify proposed *specify contractor and
materials re-use or on-site contractor and landfill site or
recycling methods recycling outlet other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Page 11 of 98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.