PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 FEBRUARY 2021
Health and Safety
6. The development must not, at any time during the life of the development, result in human
exposure to environmental electromagnetic emissions exceeding the current regulations,
standards and/or recommendations of the Australian Radiation Protection and Nuclear Safety
Agency (ARPANSA). The carrier of the infrastructure must provide, at any time upon request
by Council, written certification to demonstrate compliance with this condition. The written
certification must assume:
a. a maximum number of users over the lifetime of any pole or other supporting structure
b. full power usage
c. a maximum down tilt of antennae.
7. Warning information signs and security fencing must be provided on the site to prevent
unauthorised entry. Fencing must be set back a minimum of 2 metres from the front boundary
and must be camouflaged through the use of colours, materials and screening vegetation to
blend the fence into the visual landscape.
Colours and Finishes
8. The monopole, all associated antennas and the head frame must be finished in pale eucalypt
to assist in blending the tower visually into the landscape.
Vegetation Retention
9. The following trees must be surveyed and retained:
a. the three large trees marked as 7.1 and 7.2 on Figure NP7 of the Second Visual Amenity
Joint Expert Report dated 2 December 2020 (page 15); and
b. any tree with a trunk diameter at or wider than 200mm, in a 10m wide buffer within the
areas marked 5 and 5A on Figure NP7 of the Second Visual Amenity Joint Expert Report
dated 2 December 2020 (page 15).
10. For the purpose the development permitted under this approval, no clearing of vegetation is
permitted within reasonable proximity to the tower apart from those trees identified on Drawing
No. 4POM-51-45-CRNA-C5 Revision A prepared by Aurecon and dated 10 January 2020.
Cessation of Use
11. The tower facility must be removed from the site upon cessation of the use.
Stormwater Drainage
12. Stormwater runoff from the development must be disposed of on-site without causing scour or
damage to the subject site or any adjoining property.
Earthworks
13. All earthworks and associated batters must be contained entirely within the subject site. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
14. A condition report of the existing formation of Tablelands Road must be submitted to Council
at least 10 business days prior to the works commencing. The report must:
a. be prepared by a Registered Professional Engineer of Queensland (RPEQ)
b. extend from the intersection with Falls Creek Road to the access to the subject site
c. include vegetation (roadside and overhanging) that has potential to be impacted by the
construction activities
Page 68 of 98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.