PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 FEBRUARY 2021
15. Any damage to the existing road formation as a result of construction operations must be fully
repaired at the developer’s expense:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
16. Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Construction Management
17. A Construction Management Plan must be submitted to Council at least 10 business days prior
to the works commencing and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction
ii. Proposed fencing to the site during the construction phase of the development
iii. Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment control
measures.
c. Works programme identifying key components of the works and their respective
durations.
d. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues.
e. Include a post out to the local residents immediately adjacent to the site, and any persons
who were at one point part to Appeal No. 897/20 advising of the proposed development,
the expected time frames and the site contact details.
f. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details
g. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
Currency Period
18. The Currency Period for this development approval lapses if the use has not happened by 18
February 2027, unless an application to extend the currency period is approved by Council.
REPORT
Council, at its Ordinary meeting on 20 February 2020, resolved to refuse an application to construct
a NBN Tower on land at 244 Tablelands Road, Cooran for the following reasons:
1. The proposed infrastructure will compromise the scenic amenity and regional landscape in an
area identified by the SEQ Regional Plan as being of regionally significant scenic amenity
contrary to the strategies referred to in Element 4 of Chapter 3 Goal 4:Sustain.
Page 69 of 98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.