Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

AS PUBLISHED Information Request MCU24 0074 · MCU24/0074

of 12

Text shows just the words. Original shows the document exactly as it was published.

                 Issue – Flood Hazard
                 The SMP prepared by RECOR identifies the height of fill required to achieve flood immunity
                 requirements in accordance with the Flood Hazard Overlay Code, however additional
                 assessment is required to address Performance Outcome 10. Amend the SMP to address the
                 following:
                 Information Required
                 The development and associated earthworks:
                 37. Do not directly, indirectly or cumulatively cause adverse impacts external to the site.
                 38. Do not cause increased flooding, which adversely affects the safety or use of any land
                     upstream or downstream.
                 39. Do not cause ponding of water on the site or nearby land.


                 Issue – Earthworks Within Adjoining Land
                 Bulk Earthworks Layout Plan (Drawing 020 Rev B, Dated 31.05.24) shows cut and fill within
                 Easements A, B, C & D which extend across 6 Thomas Street (described as Lot 1 RP161212).




                 Information Required
                 40. Provide finished levels demonstrating that a suitable transition can be provided without
                     impacting vehicle access to both sites.
                 41. Provide owner’s consent for all works in adjoining properties or easements.


                 Acid Sulphate Soil Overlay & Construction Management Plan
                 The development site is mapped within Council’s Acid Sulphate Soil (ASS) Overlay and
                 involves excavation and fill that trigger further reporting in accordance with the requirements
                 of the Acid Sulphate Overlay Code.
                 Note – Conditions will be included for further Acid Sulfate Soil reporting, preliminary
                 construction management plan and dewatering plan to be provided prior to the lodgement of
                 Operational Works in accordance with the Acid Sulfate Soils Overlay Code and Earthworks
                 Code.
                 Information Required
                 42. Provide a preliminary ASS investigation and soil analysis according to the National Acid
                     Sulfate Soils Guidance prepared by a suitably qualified person.


                 Note -         For the purpose of preparing an Acid Sulfate Soils Management Plan, a qualified
                                person is considered to be a person who:



                                                                                                      Page 11 of 12
Document Set ID: 23083379
Version: 6, Version Date: 08/07/2024

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AS PUBLISHED Information Request MCU24 0074.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.