Skip to the record
Search everything, all in one place.

Council archive · source document

08/0529 - Op Works - Road works & Stormwater [As Published] · 142008.529

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist; Version 21: 1-3 Marcty 2008-———_

IPA, schedule 8. part 1, lable 5, tem 7: IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, tem 2 iwild river area): Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A

     

 

 

IENVIRONMENTAELY REEEVANT ACTIVI: WILD: RIVER AR AREA *,;

 

13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

  
 

 

1X] No-Gotoar4 [_] Yes
IPA, scheduie 8. 3 | lable 3, tems 3 and 4; [P Regulation, schedule 2. table 2, items 1 and 23: Envirenniental Protection Aci 1394, section

FIA foid tiver evail wild river declaration; Wild Revers Code.

 

14 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[IX] No -Gowans

(] Yes

JP Regulation, schedule 2, table 2, items 15 and 16

 

 

a 1.5 ~~ Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
—X] No -Gowars

0 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, ten 26

COMMUNITY INFRASFRUCTURE:.

 

     

16 Is any part of the premises designated for community infrastructure?
EX] No - Goto 01.7

CO Yes

IP Regulation, schedule 2, table 3, item 7

WASTE WATER MANAGEMENT.4

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

[XI No - End of Section? ([_] Yes
IP Regulation, schedule 2, table 3. tem 5

 

 

4, 44 Is any of the proposed operational work assessable under a planning scheme?
([] No - Goto Q4.2 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below,

 

 

4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

{XJ No
LC Yes

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

ER] No - Goto.04.7.2

Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation, schedule 2, table 3. ilem 3; IP Requiation. scheduie 2, table 3. tem 1{0)

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0529 - Op Works - Road works & Stormwater [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.