Council archive · source document
08/0529 - Op Works - Road works & Stormwater [As Published] · 142008.529
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist; Version 21: 1-3 Marcty 2008-———_
IPA, schedule 8. part 1, lable 5, tem 7: IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, tem 2 iwild river area): Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
IENVIRONMENTAELY REEEVANT ACTIVI: WILD: RIVER AR AREA *,;
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
1X] No-Gotoar4 [_] Yes
IPA, scheduie 8. 3 | lable 3, tems 3 and 4; [P Regulation, schedule 2. table 2, items 1 and 23: Envirenniental Protection Aci 1394, section
FIA foid tiver evail wild river declaration; Wild Revers Code.
14 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[IX] No -Gowans
(] Yes
JP Regulation, schedule 2, table 2, items 15 and 16
a 1.5 ~~ Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
—X] No -Gowars
0 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, ten 26
COMMUNITY INFRASFRUCTURE:.
16 Is any part of the premises designated for community infrastructure?
EX] No - Goto 01.7
CO Yes
IP Regulation, schedule 2, table 3, item 7
WASTE WATER MANAGEMENT.4
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[XI No - End of Section? ([_] Yes
IP Regulation, schedule 2, table 3. tem 5
4, 44 Is any of the proposed operational work assessable under a planning scheme?
([] No - Goto Q4.2 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below,
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
{XJ No
LC Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
ER] No - Goto.04.7.2
Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3. ilem 3; IP Requiation. scheduie 2, table 3. tem 1{0)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0529 - Op Works - Road works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.