Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

08/0529 - Op Works - Road works & Stormwater [As Published] · 142008.529

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

as

 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21:1, 3 March 2008
ACID: SULFATE SOILS :
cs —

4.1.2 Is any of the operational work proposed | in a local government area listed*"' in State Planning Policy 202: Planning and Managing
Development Involving Acid Sulfate Soils

&K] No -Gotoar.1.3 (J Yes

41 gurukun, Bowen, Brisbane, Broadsound, Bundaberg, Surdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

 
 
         

is, Section 3.6

 

IP Regulation. schedvle 2. table 3. item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate St

 

4.1.3 Ss any of the proposed operational work for filling or excavation?
DB] No -Gota414

[] Yes

IP Regulation, schedule 2, table 3 item 10fa); IP Regulation, schedule 2, table 3, item 10(0)

4.1.4 4s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

[] No -Gowa4.15 [] Yes

IP Regulation, schedule 2, table 3, tem 17

 

415 Is any oft the proposed operational work listed in schedule 13¢ of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

[XJ No- Goto 04.1.6 oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.

IP Regulation. schedule 2, table 3, item #4

 

RAILWAY SAFETY AND EFFICIENCY. i

 

4.1.6 Is any of the proposed sed operational work isted in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

{] No-Gotoa41.7 — ([] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tent 15

‘KOALA CONSERVATION °

 

4.1.7 \s any part of the premises in a koala conservation area or koala sustainability area?
[X] No -Gowas2 [[] Yes

IP Regulation. schedule 2, table 3. item 79

 

 

 

 

 

42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

No -Gotoa43 [_] Yes

edule 8, part 1, table 4. tem 2; iP Regulation. schedule 1, part 2, table §, Rem Mc)
vers vode (Note: Ihe cude does nel currently cutain applicable pravisions for residential, industrial er commercial developinent ipsite a designaied urban

 

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0529 - Op Works - Road works & Stormwater [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.