Council archive · source document
08/0529 - Op Works - Road works & Stormwater [As Published] · 142008.529
Ans
<}
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.173 March 2008
VEGETATION CLEARING; KOALA CONSERVATION, WILD RIVER AREA: °
43 Is any of the proposed operational work for the clearing of native vegetation to 5 which the Vegetation Management Act 1999
applies?
BX] No -Gotoaas [] Yes
IPA, schedule 8, part 1. table 4. items 1A-1G; 1p Regulation, schedule 2, tabfe 2. item 5 (vee
conservation); IP Regulatior
dition clearing}: IP Regulation. schedule 2, table 2, item 34 tkoala
3, table 4, item fveyetation clearing/wild river area): Vegetation Management Act 1999, section Z2A (vagetation
ections 3iF and 43A
clearingAwild river area); Wild Rivers
44 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a 30) ) lake or spring {other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
& No - Goto 04.5 oO Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, items 2(a); IP Reguiation. schedule 2. table 2, item 8: {P Requialien, schedule 7, part 3. table 4, items 3 and 3A; Water Act 2000. section GBA {wild river
area); Wild Rivers Act 2005, section 43A: relevant sald reer deciaraticny, Witd Rivers Code
4.5 -. -Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
& No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, ihe agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, tabie 4. item 3(b); IP Regulation, schedule 2, table 2, item 8: IP Regulation. schedule |, part 3, table 4, item 3
Wild Rivers cove {Nete: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No -Gotoat7 ([] Yes - Answer (a) and (b) below
IPA schedube 3, part 1, table 4, item 3c}ti); IP Regulation, scheduie 2, rable 2, item 3: 1P Reguistinn, schedule 1, pan 3. table 4, item 3: Water Act 2000, section 966A (wild river 3rea);
Wild Rivers Avt 2005, section 434; selevant wild river declaration: Wid Rivers Cade.
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[KX] No -Gotoaas ([] Yes
IPA, schedule 8. part 7, lable 4, item 3(c){ii): P Regulation, schedule 2, lable 2, item 3: iP Regulation, scheifule 1, part 3, table 4, itern 3
Water Act 2000, section 966A (wild river area){Note: no cusremt Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Nate: the code does not cusrenily contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
(X] No -Gotoaz9 [C] Yes - Answer both (a) and (b) below
IPA, schettute 8, pari 1, table 4,
iver area); reiovant wild river de
Ms 3c)(i) and Id} IP Requtatien, scherlule 2, table 2. tem 9; iP Regulation. schedule i. part 3, table 4. tem JA: Water Act 2000. section G6EB (wild
mation, Wild Rivers Cede.
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [& No CO Yes
(ii) To increase the storage capacity of a referable dam by more than 10% I No O Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1. table 4, item 4: IP Regulation, seheduie 2, table 2, tem 10
4.10 !s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
BX] No -Gota4.17 [_] Yes - Answer (a) and (b) below -
IPA, schedule 3, part 1, table 1, item 5; iP Regulation, schedule 2 table 2, tems 12, 14 and 17; iP Regulation, schedule 7, part 3, table 4, tems 4A and 5
Coastal Protection and M,
nagement Act 1985, saction 1044 fwild river area)
(COASTAL MANAGEMENT DISTRICT, WILD RIVER AREAS
411 's any of the operational work proposed to be carried out within a coastal management district?
[IX] No -cotwoati2 ([] Yes
IPA, schedule 8. part 1, fable 4, tem 5: 1P Bi
Coasial Protectan and i
Jation, schedule 2, table 2. items 12 and 14,
5 Act 1995, section 104A (wild river area):
Regulation, schedule i, part 3, table 4, items 44 and §
ction 434
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0529 - Op Works - Road works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.