Original source · versioned page text
2018-12-17 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 17 DECEMBER 2018
Built form
The built form is quite different to that approved, as the earth ramp and roof terrace were
dominant features of the design. The proposed building footprint remains generally as approved.
The proposal is articulated, uses aluminium timber-look screening devices, incorporates
generous covered outdoor spaces and a split level roof design with high level windows which
provide internal natural light and interest to the building.
The roof pitch is less than the Probable Solution which requires the main roof to be a minimum of
5°. The main skillion roof is 3° with the surrounding outer hip roof a lesser pitch. The Specific
Outcome seeks roof form is articulated, complements the surrounding area and avoids box
profiles/parapets. Although a low pitch, the roof form is not a box profile and does not use
parapets. Furthermore, eaves are provided to the perimeter of the building and the articulated
roof design and generous balconies overall provide an interesting roof form and building design
which complements the Digital Hub’s design and Peregian Beach village vernacular and is
considered to comply with the Specific Outcome for roof form.
Although the architectural dominant features of the earth ramp and roof terrace have been
removed, importantly, the proposed building provides an interesting, functional and efficient
community space which has been designed in consultation with the relevant community
stakeholders. The proposal does not raise any significant planning concerns and is
recommended to be supported.
4 CONCLUSION & REASONS FOR DECISION
The proposed changes to the built form and floor layout are in accordance with the Planning
Scheme and do not raise any planning concerns and are recommended to be approved.
Departments/Sections Consulted:
Chief Executive Officer X Community Services Corporate Services
Executive Officer X Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services X Environment & Sustainable Development X Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service X Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 10 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.