Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2018-12-17 General Committee Agenda

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                 17 DECEMBER 2018


Built form
The built form is quite different to that approved, as the earth ramp and roof terrace were
dominant features of the design. The proposed building footprint remains generally as approved.
The proposal is articulated, uses aluminium timber-look screening devices, incorporates
generous covered outdoor spaces and a split level roof design with high level windows which
provide internal natural light and interest to the building.
The roof pitch is less than the Probable Solution which requires the main roof to be a minimum of
5°. The main skillion roof is 3° with the surrounding outer hip roof a lesser pitch. The Specific
Outcome seeks roof form is articulated, complements the surrounding area and avoids box
profiles/parapets. Although a low pitch, the roof form is not a box profile and does not use
parapets. Furthermore, eaves are provided to the perimeter of the building and the articulated
roof design and generous balconies overall provide an interesting roof form and building design
which complements the Digital Hub’s design and Peregian Beach village vernacular and is
considered to comply with the Specific Outcome for roof form.
Although the architectural dominant features of the earth ramp and roof terrace have been
removed, importantly, the proposed building provides an interesting, functional and efficient
community space which has been designed in consultation with the relevant community
stakeholders. The proposal does not raise any significant planning concerns and is
recommended to be supported.
4     CONCLUSION & REASONS FOR DECISION
The proposed changes to the built form and floor layout are in accordance with the Planning
Scheme and do not raise any planning concerns and are recommended to be approved.


Departments/Sections Consulted:
    Chief Executive Officer   X   Community Services                          Corporate Services
    Executive Officer         X   Community Development                       Financial Services
    Executive Support             Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

    Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service          X   Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 10 of 44
Log in to download the original file

2018-12-17 General Committee Agenda(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.