Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-12-17 General Committee Agenda

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                 17 DECEMBER 2018


3.3. Statutory Instruments – Planning Scheme
One condition is requested to be changed as a result of the proposed changes to the
development.
Condition 2 – Approved Plans
2.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table unless
      otherwise amended by these conditions.

      Plan No.        Rev.   Plan/Document Name                                         Date
      SD A 1.2               Site Plan, prepared by Sparks Architecture
      SD          A          Site Plan - Stage 1, prepared by Sparks Architecture
      1.2.1
      Community House
      SD C 1.1               Basement Floor Plan, prepared by Sparks Architecture
      SD C 1.2               Ground Floor Plan, prepared by Sparks Architecture
      SD C 2.1               North Elevation, prepared by Sparks Architecture
      SD C 2.2               East Elevation, prepared by Sparks Architecture
      SD C 2.3               West Elevation, prepared by Sparks Architecture
      SD C 2.4               South Elevation, prepared by Sparks Architecture
      SD C 3.1               Section B, prepared by Sparks Architecture
      SD C 4.1               Perspective, prepared by Sparks Architecture
      Digital Hub
      SD B1.1                Ground Floor Plan, prepared by Sparks Architecture
      SD B1.2                First Floor Plan, prepared by Sparks Architecture
      SD B1.3                Roof Plan, prepared by Sparks Architecture
      SD B2.1                North Elevation, prepared by Sparks Architecture
      SD B2.2                East Elevation, prepared by Sparks Architecture
      SD B2.3                South Elevation, prepared by Sparks Architecture
      SD B2.4                West Elevation, prepared by Sparks Architecture
      SD B3.1                North Elevation, prepared by Sparks Architecture
      SD B4.1                Perspective, prepared by Sparks Architecture

Applicant’s Request
Resulting from Council’s Project Control Group input, community consultation and budget
considerations, the applicant seeks to remove the earth ramp and roof terrace, change the built
form and amend the internal layout of the community house. No other changes to the
development are proposed.
Assessment of Request
Internal layout
The internal layout changes reflect community consultation and provide more functional and
useful spaces for the community and raise no planning concerns.


                                                                                       Page 9 of 44
Log in to download the original file

2018-12-17 General Committee Agenda(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.