Council archive · source document
0014CBAC.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
oO , . Trish Sweeney 07 5447 5293
, . Email: [email protected] .
‘ Application Ref: 2007/676 ,
. 17 April 2007 | | . , .
Noosa Jetty Builders | ; .
_ PO Box 299
NOOSAVILLE QLD 4566 ; yO,
~ Dear Sir, 7 | .
e | Re: Application for a Development Approval for Prescribed Tidal Works -
Transport Type 5 situated at 74 Noosa Parade Noosa Heads described as
Lot 268 N 21854 .
, "| refer to your application and advise that it is not a properly made application, as
- defined by Section 3.2.1(6) of the Integrated Planning Act. Specifically,
° Inadequate fees have been paid, with an additional $700 required in accordance
with Council's adopted Planning & Development Fees & Charges required to be
_ provided. Application fee for Prescribed Tidal Work is $1900 plus $500 bond.
° A superseded version of the IDAS Assessment Checklist has been provided. A
current version is attached for your convenience.
Please arrange for the submission of the outstanding item/s such that processing of the
application may commence. at :
@ . Yours faithfully, .
Trish Sweeney S| . . .
ADMINISTRATION OFFICER - LAND USE
Award Winner - Australian Clean Beach - |
a Challenge 2004 Litter PreventionSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 28 sections
Section 2
NEOLONe ee Checklist - Applications Involving Land
moe Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
EARPLIC ATION EORMS RTE ST SUE EE NY PE
14.1. Form1 PartA
‘ 1.1.1 Ensure that the form is fully completed. me
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 ifthe owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [J
‘ 1.1.2.1 Ensure that each of Forms 8-O which are attached are fully completed. [4
2aee REFERRAL INFORMATIONS Se ae eg Gea Me GN ene Noo unre [email protected] Ensure that items 1-23 have been checked and/or completed with regard to referrals. K []
ry ane ee erp ce nena career ae ay marae pate 7 3 oe Sle As REBT TT
SRE ENVIRONMENTALLY RELEVANT ACTIVITES TASucs utiwe nad Scare umm Nmea re
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
*eRRORMZEREQUESTsT O. CHANGE APPROVAL Aran aa irienen Rouen aut en ee oprs
YAR TR ee ae a TA RIA EER DD DOAUAL PAT EMU iL NERY aE ee SITE NT Pha i. shel [ag
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
EEE LEAT SS CRU TOME Bast eet samuel SRL OR TROT RNEEEY Fist Yd CREME ea CR ER inrn IRM AAs SAB Tg BN
BS UNS ae a a RR TRS ATE
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! [ec]
" Works) accompanies the application. In addition ensure that each set is complete.
. 5.2 Ensure that 1 of the copies of the Pian of Development is in an A3 or A4 format and is [4
unbound.
SEM SURBOR TING INFORMATION LYE ae es OU Ra
, 6.1 ‘Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration [ - |
and Operational Works). !f the application is accompanied by a covering letter, ensure that it is
@ capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =
BOER Bm ea SIRS opts soe i Be DE AST DD cel ere be aac: ree SAT Re ae Oe Bas PReR oie a fe ee i sgt
TITRE LEE a a et ee ee nee a enous
: 7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. . , |
Receiving Officer . SAB Aa cece Date LOL MY Dyce secon
Having completed this form and accepted thé.Application, please deliver both to the following IDAS Application Receiving
trays:-
«= If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
e Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
e If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
e Inall other circumstances — AOP1’s desk in the Land Use Section.
Please OO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEPI g:\ant\VYorms\application checklist.doc ‘ /Section 3
mo,
Ro
4
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
) LK Form 1 Development Application eS
<< Bee is
Be afr
: om ern 5
. : ‘
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
. Description of fand 1. Street address: {nctudinghouse number, street name, suburb/ocality name & postcode) (if applicable)
All land the subject of the application, must be ; TS ,
dented, However, 2 descr fhe and fo Noosa Parade _,Necs4 HEADS USC7
ttenmntaly Recent actey (ER 2. Name of water body or watercourse, within which the development is proposed: (if appficable)
wiamemencene, | [NCoaA Cive@,
development is proposed within a water body or = — V ie -
@ watecourse, 3. Lot on plan.déscription (eg. Lot 123 on RP 4567)! GPS coordinates: .
. Advice for completing Q3 - Most fand can be 7 7
Wentfedby ataton dan desta, Tose deta
be obtained from title documents or through the ——
local government. " mens ores 4. The above description is for: (tick applicable box)
However, ithe land on wich the developments CJ (i). the land on which the development is proposed; or
re dorebpmene proposed ina waterbody cr fe ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide = te proposed; or
tio es
8 shina! ahovent aa me ["] (iii) the water body or watercourse.
erohievadnentlord fen Meeten Bay. |. Shop/tenancy number. 6, Storey / level: 7, Total area of land: (m? or ha):
GPS coordinates where there Is
a a
development is within a water body or watercourse. .
- i i | . . ‘ . . ’ ‘ 5 . .
aR tral govenment area. 8. Local govemmment area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc) (if applicable)
rivronminrnwaemamneraone | (vaosA. COUNC{e. id
focal government's area unless provided for under the NO U > - C OM 4 - , .
Local Gavemment Act 1993. + |9. Port authority for the strategic port land or strategic port land tidal area on which the
I tae aerebae von ae i stoi development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
- i t t . 2 * y ~
priitidomaFermmceserarwadtt| [Mey
A —
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
sonore
@ provided in an attachment to the application. 1YXIS-OC
11. Proposed use of the land: (eg. 6 unit apartment buitding, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters efc).
WHEE JETS.
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc)
camer ermettt, | (BP
completed parts of Form 1. For Information about ee,
when a part of Form 1 may apply refer to Guide 4, c/
Applicant details 13. Applicant's name: 15. Contact person: :
cpomnesmfeteomadteans > | Ka Noosa Jetty Kurita _| o
When staning and lodging this application ==. (14. Contact number: 16. Facsimile number/e-mail address:
information provided is correct. The assessment \ aC)
manager, any referral agency & the Chief Executive -
{where epplicabie) will rely on this information when | 17. Postal address: “ma | oa
romaine 20 Rex 294 Meas) Wa
Hove apfiart isa compen contact person | FO. Be Voosuville “ \we tel >» |
must be shown. 18. Signature: Cv pate: AL XY ;
i? 2)
(UD 13 APR 2007
Si FRONT COUNTER C
- NOOSA SHIRE Counc é*}
Ik
e 58 ©,Section 4
vod,
4
+
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
application must contain, or be supported by, the a?)
written consent of the land owner/s, if the application : J yp é 3
{i} a material change of use; O Biwepeton, ee LO bh MSL ee. C~ O20;
involves: ' . | c , -o7,
{ii) reconfiguration of a lot .
{ii} work on land below high-water mark & not within a {ii) - ¥
canal as defined under the Coastal Protection and eS Sa
Management Act 1995;0r i
(iv) work on rail coridor land defined under the (iii)
Transport Infrastructure Act 1994. wn ee ee ee ee ee ee ee ee ee ee eee ce ee eee ence eee eee eee bem e eee eeeee
Section 3.8.1{2)(a) of the IPA provides that .
tandowner’s consent is not required for a mobile or (iv)
For more Information refer to Guide 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quany material on Slate coastal fand under the Coastal Protection and Management Act 1995)?
resource entiftement be given for applications that mn
involve a prescribed State resource. NO - go to 24 L] YES - go to 22
Section 3.2.1{10)(a)(@) of the IPA prescribes that an . eer . .
application ont S aken to be property made 22. This application is accompanied by evidence: (tick applicable box)
euneveence vane eB a C1 {i)_ of the allocation of, or entitlement to, the resource — attach evidence and go to Q23(u)
Refer to schedule 10 of the integrated Planning (1 (ii) the chief executive of the department administering the resource is satisfied the
Regufation 1998 that prescribes the nature of evidence i j i i i -
requited by the State hn support of the lodging of this development is consistent with an allocation of, or entitlement to, the resource - go
6 development application,
([} (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to 023
se ea ne vdatory# evidence | 23. Evidence of the resource entitlement:
required under a W) (i nencatony f evidence (i) Resource entitlement / authority details (vii) Official stamp of the department
Information In (f} — m: " : . . a .
The offical stamp of the Department of Natura administering the resource (if
Resources, Mines and Water is mandatory where the applicable
application involves any water of riverine quarry {i) Name of delegated officer
cern 32.164 aos he ea Td
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be iii iti
completed the evkdonce fs ime Eriied (ii) Position of — officer
(iv) Pe of ~ officer
(v) Date
(vi) pea date of evidence a
Assessment triggers 24. ts the IDAS Assessment Checklist completed and attached to this application?
theconpiefen ef PoE Ama boree Form ony 1 Vv | YES (J NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. . grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
. the application durin pubic scrutiny or public (i) OF l2z0 ~—| 6. Coron Feo]
Manages, referral agencies and any person viewing r
notification to understand the scope of the proposal ean seen conta roo OTT TT re eae cencsanacnpe sconces enn enn
ard eny polenta impact. ) O1lZo0-2 G. Pator 2 6
(i) (hz
Ce RA GX
PLEASE NOTE: The assessment manager may refuse to accept.an application that, at the time of lodgement, fails to prov AS? DoticalS EQ gy ven” MAT
and any other relevant part of Form 1. . ' : * .
OFFICE USE ONLY (appiicabio to assessment manager's SPR 2007 bee
FEES | eno | Mer] Ne Ex)
RECEIVED NAMEIS . __JANUMBERISSTMRE COtni ci —_/
Notification of Engagement of Private Certifier (Optional format}
To Council. | have been engaged as the private certifier for the building LIEN at)
. \
Date ofengagement / / Accreditation Number: __ Name: Signature:Section 5
pa rhe}
wey
INTEGRATED PLANNING ACT 1997. Part E, Version 2.0, 4 October 2004
NN
RN Form 1 Development Application eS
Operational &/or building work BE
assessable against a local government's planning scheme &
. ; .
oO a
Completion of ail question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed ‘
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable) 2
A development permit authorises . imi - . 4
development to occur, while a preliminary a Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process :
and does not authorise development to occur.
The types of work that are assessable against
: © a planning scheme are determined by the
scheme for a particular local government and ‘
will vary across the State.
To determine the types of work that are
assessable under a particular planning
scheme, contact the relavant locat
government.
AND/ OR
Tbccclopment permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
2. Are the works subsequent to a previous development approval?
/ No (1 YES - provide cetails of all previous approvals (eg. file references)
3. Is the subdivision for a canal estate?
Ko
Clyes a Nt TS
Portable Long Service Leave levy (if |4, Is payment of a Portable Long Service Leave (PLSL) levy applicatile DHE propiyga? “ND
applicable) . ; (1) YES - complete 05
Prior to issuing a development permit for the C E | V F 0 w
works, the assessment manager is required NO - 05, 6&7 do not apply R E an
nO - 43 APR 2007 fF
\35, FRONT COUNTER
3 a
NOOSA SHIRE COUN
- 4
8 5
| AAS:Section 6
net
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
by law to “sight” an approved form, issued by |5, Has the PLSL levy been paid?
Qleave, which signifies that the PLSL levy
has been paid. Whe. — completeQ6
O ~ the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
7. What is the receipt number of the payment?
PLEASE NOTE .
This application cannot be accepted unless accompanied by Part A of Form 1. '
"The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information "
requested by Part A and any other refevant part of Form 1.
OFFICE USE ONLY (applicable fo assessment manager} '
(i) Is a PLSL levy applicable in this instance? LINO (2 YES - complete Qti9
@ (ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application? LINO (1 YES - provide receipt details below
9 RECEIVED \
\ FRONT COUNTER 0,
a
HOOSA SHIRE COUR
LTSSection 7
INTEGRATED PLANNING ACT 1997. oe 0 .”"_,” IDAS Assessment Checklist, Version 18.0, 10 November 2006"
- ‘ . Form 1 Development Application ec
. SA YA OY ; P p ‘ :
. . Py \ .
pw # IDASAssessment
y . Checklist — a
a - ol (Formerly the “Referrals Checklist”) , a
IMPORTANTNOTEFORALLAPPLICANTS:© ;
~ +4. This checkist was formerty referred to as the “Referrals Checklisf. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
a “Referrals Checklisf. The name.of this checklist was changed from 25 July 2005 to more accurately describe its function. Los :
2. Under the IPA and.1DAS framewark, an application may require assessment by the local Council and/or cestain Queensland State entities (e.g. Environmental Protection. ~~
.. _ +. Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.). ° Lo oe ~ . , .
- .3._ This checldist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the appficantto
determine the assessment manager’ for thé application. . uO oo . ‘ me, .
' ° _ 4. Therefore; the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & Bony. :
m_5. . itis the responsibility of the ‘applicant to accurately complete this checklist. _ . : . *
Ot eo Depending on the nature of the application, an applicable State entity may be either the assessment manager or.an IDAS referral agency for the application. :*
+, 7. The assessment manager for fhe application will rely on the infomiation provided in this checklist (as well as any material lodged in support of the application) to identity
. any applicable referral agencies for the appiication in the Acknowledgenient Notice. The assessment manager will also rely on this information when identifying if the
: appfication tiggers referral coordination’. . . m Oe : / : vs . : .
8. To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS |
oo Assessment Checkist in the IDAS appfication process, and its relationship to the Form 1 development application. ot, . ,
- 9 Any other parts of Form 4 that this checklist requires to be completed are available from the Council or the applicable State entity, or can-be downloaded free from *” ;
” waww.ipa.qid.qov.au. . . me . :
~ *+. 10. Section 2 on page 10 provides adviee about the referrals that can be required for applications for building work asséssable against the Building Regulation 2006. .
“Sis a: = eet pe rR es Ee pa ee a Sr x Sisieiaic ree ae esac zi Soe so Naren Pe iG ETT ST Et,
+. SECTION 1 - STATE ASSESSMENT (completion mandatory) cS
, . Note:. The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006. Lo,
' —-SEhVifonmentally relevant activity. 2/1. The application involves: (tick applicable bowes) Ta
+ Bal more Information fefel tO Guide 4s izes] ).(i)_ an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless You answered none ol the-abovelio. Qt) . ~ has not been-made complete PatGofFomt - a mS,
epphcation requires assessment by the “P2075. w rev _ +s: ee ae
- ° Ceditanistering sumone. ee s8] (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
<ifan entity, other than'the adrfinisteting: authority. 1S.} wa made - complete Part G of Form 4 oo oo oo
* Hite asse8Sment ihanager. for the application. thes. Alii. none of th i
-_anistring ‘authors a canciteice ent (il) none ofthe above : oO 7
the appli in tafon to ths mate S| oe, | . -
gppnoleAn application iavolving ERAS andlor 20h} 7 . ok, _
Oa: completion of Part Ky of Form 1 tors" o : “
approval where an allocation under the: Water Act* ,
. 2000 i Pecquired ss fi. eb hae ears Peto errem sper sy es Oe tii Saker ged a oT ESL atte Le tha ee fiat . eu et Jere Seeks pa ee ee 2, tee . . -
shite ronbolled coadiinaltes. “05312. The application involves: (tick applicable boxes) a
. — Rermoreintemabon refer toured: sat i): nti : 5 “- ,
“(Wes jib answered ‘ni ft abet 6 02 the O i) development on land contiguous" to a State controted road and for- - ;
. Capplicanon triggers fefertal td tielDeparimentotty| L (a) material change of use assessable against the planning scheme; a
. Main Roads (DMR) 3s 3 feferta agency. 55°. “2 ina a fot unless = ——
"cet Grants OM wit ab dice C1 fb) reconfiguring a fot. unless = :
__Fgeney, While i otter ciccumstarices DMR wil be 3? - © the total number of lots is not increased; and — soo
yess ot ihe IP Reaul sgt aiseea vob _° , « the total number of lots abutting the State-controlled roadis notincreased; 2°
slr ere DUR ea es of SORE CI (©) operational work {not associated with a material change of use assessable against the -
_ :ageney ee Me app ee “planning scheme or reconfiguring a lot mentioned in (b) above)— _
pe i See eR * associated with access to a Staté-controlied road; or
pink eRe Rae _ © for filing or excavation; or. “ ——
ae a + involving the redirection or intensification of site stormwater from the land, througha
Seg Ee eee] - pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
ER ES] Seale conbrolled road eee se
1 The assessment manager ts responsible for assessing and deciding an IDAS appfication. The assessment manager for an application is prescribed in schedule 8A of the IPA. : .
. 2 For additional information refer to Guide 6 ‘Does my appicabon trigger the referral coordination process? - . . | . .
3 The ‘administering authority’ may be either the Environmental Protaction Agency, the relevant local government (for a devolved ERA) or the Queenstand Department of Primary industies and
Fisheries {for a delegated ERA). - . . :
4 Land contiguous to a Staté-contratied road fs defined in schedule. 14 of the IP Regufation to mean land - if part of the land is within 100m of the Stato-controfed road; or Batis part of a future State. -
controfled road. . - . ‘ . . .
: : . . "Paget ; : ;Section 8
oe __ = ment on fant - - fanning scheme; holds set by .
oo Version 18.0, 10 November 2008. oF
. ; tguous to a State-con . te (8
. TEGRATED Fahne on): Ow Da male! change one focal government's pt nd exceeding the (hreshodds
"INTEGRATE Nigdiroad. matters. Cts a 4 ‘the IP Requlation a re
. mn and not contiguous to a Stal ‘heme; and”
oo Se ee So * assessable ageinst S afte IP Regulation fe 5 of the IP regulation .
pegisphe Sarit gs i a SIN. afisk ES a! ainst " ‘ . 7
es. Se ne erel - tention , joned in schedule -
- oo oe that chee or purpose nenonedn schedule Bf he sin te
+ BE Sae seers Re See eee " ing a fot for at schedule, . able against the,
; Ee ee eae y tity figuring a t by th f use assesse ,
e Oe SE OO demas he itt eco merinedin@)ebow |
eee ae res ee La ee So ontiguring Ids se : 0 -:
ES as oe seres Oo tional work (not assoc a lot mentioned in (i scheme; and _ et-by
i 8h hs, 2 ES opera ' figuring fanning sholds set-by
Be EE. SS Oe oe eee ea ovemment’s p ceeding the thre
tole a eet _— Plann ble against the local g Regulation and ex 4
oo BOS es Ms . foie is sho oe "# assessabie ag: ule 5 of the IP So en
. ie ET ae RGR "© mentioned in sched oo ‘, esis eg
BP RE gies eS PT ° yo oo ocho wns oe
ae Orcs? Sis oe ,. ~ that schedule. sks aaneoemi De
eee Sg yee ae reofthe above = —— i. a
| BERS ER i SE Fo ne ee ble boxes) |
RES ot Pn ee plication involves: (tick applica : Fe, .
“Btedge 3 eee 3. The applica lal change of use — ning scheme; - |
(ceunumucin oa =e ~ CU) materi ble against the planning s oo le vegetation; or =
Ee ae eee (a) assessable ce , y map of assessab t vegetation;
, eens oe (b) on‘alot containing - . Sn on a Property for the in vege Ls
ee ey ; ; Zor 3 area ssable vegetation mental use; an -
. ce vce . an ‘anemone map of assessable wo Eevronmental use; a ee
(of Notes Resouces Min ie eS iments: ot i isa omplete
[a Neleat Resouless Mines at Wate RMW 6 Be sssetsnen oy ere Is na pr a Use e lan : :
Se a ine: oooh tailing nines e tanger - | ee
poe ee ee "(where the soe of he land ie 2 he | of ,
cee oe d)_where the size of . on a property map station for
- Ge (we ring alot~ = acts no preparty map of toseesple ta _
eer CAG recontigurt ntining a category 8 no property map ner :
7 pee | 1) onalotco jon o,f there. ; large,
MBE septate Sees _ sable veg ony is 2hec
Lo fees eres Re eat SERRE" ores a) on. . etation ’ : : A tares or
| Da. esse hz fe ot belo te rxmntgratin Jer -conttePat soifamt
. Begs ieee rece . : oe a q ; : .
nie ine eos where 2 oF more lot lot created fs 25 hee .
eee Hoe na pase {c). here the sizé of any co tation clearing is made mo,
pers ee fe setae ge Seria: dees . Wi , , a .
Bo eee eens “es al work - tion where the vegetation clea aii .
xe ae SCONE ba gerey iii) operation tive vegeta ; and inst the planning
Be ee Me ay Ses? "BS regan’, aay : (iii) Pp . of na i IPA an . ainst
ACRE OE PEARCE oO for the clearing of n: edute 8 of the IPA; assessable agai te Part J of
eee OE segceie] | {a} assessable under Sch aterial change OF use mentioned:in (ii) - comple
£ e reat Ae as (b) fot associated win in (i) 6f reconfiguring < | Je .
a ! “ie a Se ei. : : : ith am Ne ing alo . ; :
PS tineen oo werent scheme meritio , Ste 1 econ teenie tees ee
é sels ESSERE 8 8 ae We: . ; ; Form : : ee ee che the cs - : .
pe oe m nest . df. none of the above. “ cstnepame se ” a rt infrastructure Act 1994 (TI
. Be Sfagy ies Ee - pant Seeaeitees ° in the Transpo . ue
se Siew er eRe IV} - seen on ener : é _ .
aac Sa aot ae nase naan oe : . efined in
«BRE glans =e 4. The application vont on stegi prt land as d Fo, d.use plan approved under the
See eg Ot, ted) mara ‘offom | tis inconsistent with , “ . .
“Exo nna Ayn | ei) -« ial change of use tend cota pat fofForm aa , :
Gere eae pean” os | Act for. the s wie yt aatned® local govemmen - i
: . sien eet Moca, Trenspbr i RT . - neigh eg se —— j len ; . . |
‘thew ticki i) Qiee itietepphicaton: = oa li) none ofthe above = d situated in an id reof -
alfivou ticket ney Fon wetapph My gd (iii), sii nt on.lan mor more of J
- soncurtenes agent} gilt a oo a fion involves von (tick applicable box) Ive the excavation of 1000m |
t ee ¥ bees oY pplicatio 5 vill involve ,
Re Pee SS CRS B : surface 3 developmen : oo Orn? or more .
mo age sas — ESOT The applica’ of the lan t wil InvO . e .
Sa =a ag PART ana eee where the yAHD® and the de ’ ite with 1000m: «
: cee ee a Nk an boon ba AND, or il involve filing the site with'10 .
yAcId'st ee ec. : a {i . ediment at or. . | ment will i . / - . t
cepa cern tt er olf Soll or sedi D and the develop a
pooapepeies: WM at or below 5m AH CO oe a
‘belie a tO a) - C1) a terial bee . |
sence eanen ee yi ananee | "of ma above — : -
Besieas 2 ny OI ed fe oi tea et alle ‘i sire a. : . i i ~ mo, . : - . '
: Ses. (ii) none-of the abov | |
. “Man pe ee ge y hi LY oe ees ab wee eimai eee . . . t
“SES Cy: for tha’ ey OSES sa SAE Net nadia : . . : {
Ore! Manas aioe . . . . . :
thy . . mo . _— . . ‘ . |
oo. . a . . oo “Caton Vale Momiagion Noosa Pee ra, |
, oe . tr, Cams, Caliope, Micha Vate, Moméngton, h me
Oo : : , . Burke, Bumef, boo ochy, Maryborough,
Se nvdaberg, Surdekin, Logan, Mackay, Se
-. : : _ Broadsound, Bu , Livingstone, .
: n, Brisbane, Broz Isis, Johnstone, .
"Austrian Heigh . are: Aurukun, Bowe Bay, Hck, s,s oO = .
5 The iden Dounglas, Fitzroy, Sarina, Thuringon : : .
Cootoota, Doung! Rockhampton,
; "Rastahon Helgi Deter AND .Section 9
INTEGRATED PLANNING ACT 1997 = -___IDAS Assessment Checklist, Version 18.0, 10 November 2006
‘Malor hazard facilities of possible:“") 6. Does the application involve a material change of use for a major hazard faciity or possible ©
: denilaeti eel oc major rdzard facility as defined under the Dangerous Goods Safety Management Act 20017
.—$fbe taba thlormalion Tes te Guided 7ee ae ; ¥
| Ae ee gs - No : : So
Extaeean NRT a ys ple sp a PAO 22 : ‘. . : .
oO a a ae (CLYES-complete Patt ofFormt a .
| Resemarige Lee Acne .
MG oneCVOHeLDANDESE Rasen | | oo, : :
haves Ochs application, DES 3 concllvene?
podeney fa tis: epplicaborin tetotion: 6 th iter: ere epee 2 : Nene: by Pipe enteral ste ang rn: aS spay Teese tee lg oe gk Sete ESS a. ed .
FWaterrelated development under tties| 7. The application involves:
ae Ato (1 {i) operational work, for taking or interfering with water under the Water Act 2000, thatis: ~:
o beurre Re rg ae Cen te ORT {tick eppticable box/es) ; - 7
Loe Screams . - [)\a) ina watercourse, lake or spring, or from adam constructed on a watercourse (eg.
paiseconent 0a feerane van? evant “a pump, gravity diversion, stream re-direction, weir or dam) - completo Patt Ka, Ky Ke Ka, orKeof
a {Us you pete ree ators G7 BS : Form 1 whichever is applicable, . . a
‘SINERES Heep Mind Wale ae : (1 (6) for an artesian bore anywhere in the State, no matter what the use - complete Patt = .
LES ennMW EMER) | Keotfome oo 7
See Te a areTe) - [© fora'subartesian bore, in declared groundwater afea’, for use for purposés other
“flhis tater Pena & than stock and/or domestic use - complete Part Ks of Form 1, ee
LESSOR ee SRE Wen eee remem G pene ae . . : Po . . . “I
ee ce ais es e eee Oe [-) (d) for a subartesian bore, in certain declared groundwater area, for use for stock ;
. Eee ee _ and/or domestic purposes - complete Part Ki of Fomn 1, .
oo ree z rece ees elie ‘1 @) for constructing a referable dam? or that will increase the storage capacityofa
a a PRO see _ feferable dam by more than 10% < complete Part Ksof Form 1,06
Bes oe : eee i (_] (f) for taking or interfering with overland flow water - complete Parts Ke and G of Form
. EXee ph Be Ne eer ad evs . . > A - ; . -
| Fey ae ee (i) noneofthéabove, ates ec pmtenugteeese yt
. PRemOVALSEguarry:materialifromas<18, Does the application involve development for the removal of quarry material from a watercourse?
. MESS GSS CARA Scans hee eho uanh 5a eto oa . .
WalerCOulseu eae Nene e requifjag.an allocation notice under the Water Act 2000? .
see eras Unt te eee NN eae a le ’ .
Fo ote internation eter CMe tbs Se Oo oe - oe
++ TiFansetod VES: Gs i apeaton’ SO an
’ (tequifés assessment by the Department of Natural (-] YES - complete Parts Kr and G of Form 1
.. _ his Hatter Zee Sear cot See pea ee ; ;
. PASSER SRS BRL ea re ee een er Pare - .
| Rabie Sct of removing quarry miateraloan a8) . : oF
puelcreautes © 38 pan Enuronmentally Retevant'-r} =
| Acinily (ERARSSSC SSS oecte trig ha Hots wets ese te ee ite wee es alg pipiens ce oben 55 eeeins toto fe Niet et atti Spe
. . ° ‘ , . . . |
"7. Tha declared ground water areas are sted in Guido 13,Develoomertin adectared catchment area, = |
. -B Referable dam is defined under the Water Act 2000. :- . ,
“9 Watercourse is defined in sch 10 of tha IPA. -
: Sa Page 3. —Section 10
- INTEGRATEDPLANNINGACT 1997_— aS Assessment Checkist, Version 18.0, 10 Novernber 2008 He
"Operational works in aitiiajarea.or' 9. . The application involves operational work that Is (ck the applicable baxies) _ oR
a Soest atoemnent dit eee - C1) tidal work as defined under the Coastal Protection and Management Act 1995 (the ee
> Bian aeteeciera web: | 7 Coastal Act) that isnot prescribed tidal work - complet Pat M of Form 4; Of _
apne au ie yee hows (ji) tidal Work that is prescribed tida! work" other than in a canal? -complete Part PofFom f:or
. ans nts roy are ree Te Meck Bln wetg Beta ye, 2 net e : . - . = . . . , , .
7 dboliction requires assessment byihe:: -<<'r"."| . ([] (ill) carried out within a coastal management district under the Coastal Act and for - complete
" Eibmentl Protein Aaah (EPAV © Part M of Fort 1 if any box/es (a) to () below are tked.
- tif aregency ober tian EPA the acess: 73 ru in a watert stween MHWS a
¥ iaiagel forthe Sppiicabon’ EPA ig 4 concureace | (] (a) constructing or installing works in a watercourse between MHWS and HAT (Le.
«ae frie potion ela Os at | + other than those works in tidal wate) where the development has been determined riot
_ $LOGél wéinnien is the ascaesinent ange etal - . fo be assessable against the Water Act 2000;
* [prescribed IdM ABNC AEROS S) ntite ante a
SERRE ORES a Arias EEN ee a [J (b) constructing a canal'2 intended to be connected to tidal waters; -
ES Sasi isi ga Raa . ae “at : : . .
cee eas - [J (e) ‘constructing an artificial waterway; a
Seabee gs ROR Sn ean eG Re - te og a4 y) , cote ,
nn eee Bee (_]{d) reclaiming land under tidat water,
Biba: eee [_]{e) disposing of dredge spoil or other solid waste material in tidal water; ’ =:
ERE LISP ASR EAR NR EEE BS : “a aefnet ean aac . ave hi
beri “a Ca OO Re oo (J (f) interfering with quarry material on State coastal land above high-water mark:
a SST SER - [J (g) draining oF allowing drainage or flow of water or other matter across State ,
Es RR Ae ne - coastal land above high-water mark; : oe
eee Se ae a - L1(h) removing or interfering with coastal dunes on land, other than State coastal land,
| GR Rev ih ce eee ee es REE a Saat ) removing or interfering wi i
ee eee ass SS - that is in an erosion:prone area and above high-water mark; -
. WE abe oe sath rl sy eRe FT ay . ne a
Bae eh * -* {] (i). constructitig a bank or bund wall.to establish a ponded pasture on land, other
- @. “! oe he oe than State coastal land; above high-water mark: or oo 3
LM) none ofthe abe, se cena cst pe ssc, |
: EQueratonal Wark Below RG Malet 40. The application involves operational work that is: ( tick the appiicable box/es) oe
; ae ue ee ee “CI () tidal work's as defined under the- Coastal Protection and Management Act 1995 {the -.
"ligation about pfedribied bak wortcht otal = ’ Coastal Act) that is not prescribed tidal work — compiete Part M of Form 1; or
. “Uns you Le ugeee we _- WI (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF - '
{Repeat ag ol Gust (J (iii) carried out within a coastal management district'S under the Coastal Act and for - ° .
eon Tene ae. : eae acs - [J (a) disposing of dredge spoil or other solid. waste material tidal water — complete Part
{Lota goveinmentis thé dssébsmesi{nailager fora - Mof Form 1,
eal Wawo : ~ oN [7] {b) - reclaiming land under. tida! water — complete Part MofFonn f;0r =|
; fo i “stl” EV (6) constructing a canal", if the canal is associated with reconfiguring a lot - complete
Bra ot, TP, "Part Mof Form 1; ~ : Ll.
ogee 8 nO ESS SZ] (iv) - none of the above. . .
: -SGoastal anagénient” " ~ "-""]14. The application involves: (tick tha appficable boxes) 0 i ,
+ primer iomaton refer te Gude18"- - |” (1 (i) - amaterial change of use assessable under a planning scheme involving operational .
Shee te ee eS ieee | _ work carried out completely or partly in a coastal managementdistrict'§; ti
tonne EPA under a planning scheme involving buiiding —
Spvicmmentat Protection Anencr(EPA.. ° | {7} (i) a material change of use assessable under a planning scheme involving buildin
Re ss re oihes Te hr Ene, do work, carried out completely or partly in a coastal management district that is - a
ney lor the apfiication in rettion to this matter. | " » the construction of a new premises with a GFA” of atleast 1000m2 . a
, an ». the enlargement of the GFA of existing premises by more than 1000m2
ho, . (1 (ii) reconfiguring a lot assessable tinder schedule 8 of the IPA where the land is situated.
on . an , completely or partly in a coastal management district
So | Ci fivy reconfiguring a iot!® assessable under schedule 8 of the IPA: and in connection with
o mo the construction of a canal'® ~ complete Part M of Farm 1
oo a (¥) mone ofthe BOVE eee ep ee ce |
10. Tidal work is defined in sch 10 of the IPA , a
MW Prescribed tidal work is defined in the Caasta! Protection and Management Regulation 2003 and includes certain tidat works completely or partly wilhin a local government dal area, ,
12 Canal means canal as defined under the Coastal Protection and Management Act 1995 . : :
13 Tidal work is defined in sch 10 of the (PA _
14 Prescribed Uda work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parily within a tocal government tidat area
“ 6 Coastal management district is defined in sch 10 of the IPA and means a coastal management districl under the Coastal Protection and Management Act 1995, other than an area declared as 9
coastal management district under section 47(2) of thal Act. . . ‘ _ .
1§ Canal means canal as defined under the Coastal Protection and Management Act 1995 . , Se
17 GFAis defined in sch 14 of the IPA to mean the grass floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application Is being assessed.
18 Under 117 of the Coastat Protection and Management Act 1995, an appfication for reconfiguration, where thé reconfiguration is associated with the construction of an arfificial waterway, musibe -
accompanied by the application for the operational works to construct the arfificia! waterway. . . mo ,
: : Page4: . . aeSection 11
INTEGRATED PLANNING ACT 1997 _. _ _- __IDAS Assessment C eckist, Version 18.0, 10November 20066
“Development.within the limits of 12. Does the application involve development below high water mark" and within the fimits of a port
sport m undepAfie Transport Infrastructure Act 1994? a
fot more information fetes to Guide.18: Fors... 2 : : - sO
~Guiig ag ee) YES - complete Pait M of Forin 1, or Part P of Form 1 if the work is prescribed tidal work
- ll you answered “YES" to 012; Wie application” —°* se .
- pMevélopmentisss = EP . 7 oo |
E®. within 200m of.a shipping channel oc an etry .
- Laie shipping Comidor for tie port 2c
ESE he Gora swig bas acaemeteiy . co
“ES Shipping whiatt, a mooring, anchotaye oe spol. |
Be. Sounds oe se ”
f° wii 40i0mrat spent port icaiy Menuet] Se
{> inva land'usé' plan approved under the: Transport oo ot .
. FO ONY 3 ees Bayh Lee oe I FOES MNT ES A SNARE NRE a ROA PTE A seh CE VST Se ca arian ye TY PETE me,
EMarings: 2 “PS. 3 2143.. Does the application involve operational work that is tidal work for a marina with more than 6
*—_ PRGenasen asinine sma eeES =) ai -
~ ida Work fetes to Guste 24°. Thi eat government.) es
scoueveenemere dpe ~ [CV YES complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work |
Pay ace NALIECS eae Se ese eA yey ' ‘. se . .
Hijouansweed VES wGtd he pica | . |
-——_Elfagers referal to, Queensland Fire and Rescate. m 7 3 : oO :
Bag inant ne ane aera : + ee : Pry tatanienailandtidalarea”i?.
8 dl woke In trateg port ance) 14. Doesshe application involve. tidal works within a strategic port land tidal area”? oo.
eo ee NO BO, |
ol inove informalion reter io Gudea” "22, : Co
Unless you asi ior at bahia fd [1 YES - complete Part M of Form ce oo
BPA SS DUE eae Se ier pee S28 8 ae - complete 1 . ‘ : . : .
- __eAaBlicy (EPA) arid Quaenstand Transport (A) a8: me ,
‘Heritage’ =~". 45. Does the application involye development in a heritage registered place as defined under. the
“For further information referto Guid” = | «= Queetnsland Heritage Act 1992? Doe, oo
"Sif you answered “YES" to Q15, ieiapplication’ | NO co ; .
"lagers referral to the Québiistand Hesitene: Counedl: : — co
=Deétared catthrhentiareas __ -"—_: | 16. The application is in an area declaréd to be a catchment area under the Water Act 2000 and
For more information, Inching 3 tof he dear ' involves: (tick the applicable boxes) oo a ,
catchment areas within Queenstand, refer to. Guide — ee i . ce
Ep — we L1() reconfiguring a tot if any lot resulting from the reconfiguration is less than. 16 hectares,
“Unless you answered “none of thé above"to 16, | — [] (i) development assessable agairist the planning scheme involving the establishment or
eer totNaura Resonees Mines and Water: expansion of a waste water disposal system, other than a disposal system for carrying
~AINRMW). ef A out an environmentally relevant activity under the Environmental Protection Act 1994,
Qi: Denier NAWe a (ii) none of the above ; a,
~ concurrence agency for he application in.retafion to . :
“this matter. Ecce cpegetnecape psa tec grtacepegtaiicriss pe tthe tas Sth Acti Sakae
“Contaminatedland © ~~. 117. The application involves: (tick the applicabte bovis) = Se 7
‘Applications involving material change ofuse and?) Fg s af the pram} _ ; -
“orrecontguing alt tay tage’ Os cleral | C) (i) reconfiguring a fot for which all of part of the premises are ~ .
: For moreinfonfationrefero'GuideS. (a) (premises mentioned in the IPA, schedule 8, part 1, table 2- |
Unless you answered. “none of the above to G7; =f. . « item 5, including the exemption otherwise provided for by paragraph (d); ; -
“Die application requires byeveny ta 4 ’ @ item 6, including the exemption otherwise provided for by paragraph (a); or.
_ + agency other tidn EPA‘ the assessment mariager: ___ « item 7, including the exemption otherwise provided for a mining activity or petroleum
“fot the application, EPA wiltbe aiconcurrenté *. "activity; or . -_ i,
~ Baeney for Ine application in relafon fo Bas NES (b) ‘in an area for which an area management advice has been given for unexploded
Sp ordnance - complete Part N of Form 1 oo
_ Li) a material change of use - . _
, , . . (a) -made assessable. under the IPA, schedule 8, part 1, table 2, items 5to7;or
oo uo ~ (b) assessable against the planning scheme and if all or part of the premises is in an area
, en for which an area management advice has been given for unexploded ordnance - - _
; - 8 complete Part N of Form 1 oo
oe rE EC) tone of the above sass’ antntiunnennss names ses
49. High water mark is defined in the Coastal Pratection and Management Act 1995 and means the ondinary high water mark at spring Gd.
20 Marina is defined in the Transport Operations (Maritime Polluion} Regutation 1995. ° . a i
21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port fand. . ; 4
a a — 'Section 12
- INTEGRATED PLANNINGACT 1997. . _ ___"_JDAS Assessment Version 18.0, 10November 2.
_ petit inhailite 18. The application invotves: tick the epplicable box/es) a
Appa epos id phe meet cw ie ayeet > Tetees eat g . : : : NEES
Be BAS Seo ce aro ah Pea ee Sek ey eae eer t yes t. : . ELE
a Fae so © BCA DIP _ (Gi) ° reconfiguring a lot where any part of the lot is — . . Ee
a TUNES you suduciel baw HG be seis . _ © Subject fo an easement in favour of a-distribution entity or transmission entity underthe =
alte appheabon tigaérs feferal tlhe Sdency oY _ Electricity Act 1994 and the easement is for a transmission grid or supply network under e
. idleh Ihe easement iS taned lila at a advice . that Act; or os :
Pagengy Re ete ma Rar CSR std octet nea ot aan 7m
ee + situated within 100m of a substation site; _
. ee C1 (i) a material change of use, assessable against a planning scheme and not associated
ee with reconfiguring alotif- 4
a Bs ao * any part of the premises is subject to an easement in favour of a distribution entityor
eae eee transmission entity under the Electricity Act 1994 and the easement is for a transmission
HORRORS OSS ST NETO Seer usa * sg a . . / ;
oO ee - «any structure or work that is thé natural and ordinary consequence of the use is, or will be,
* BREN S IEG. steele erences eka Wenders ' : ' . : : . sot . . .
eee ue located wholly or partly in the easement;
ep Sea RRR no SEEN te ee . : a . : . ;
Tt Rae Sig Beee sy ee SURE {_] (ii) a material change of use, assessable against a planning scheme and not associated
Pe * with reconfiguring a lot if any part of the premises is situated within 100m of a substation... -
basse ARE ReneS ne eee IS . . . . ° .
ee ees site; a : |
pee. Ae is Ste {J (iv), operational work that is filling or excavation assessable against the planning scheme,
NASAM CE Sant agy een tac RM MORGUE] | ee . “oe . : .
Se . hot associated with reconfiguring alot, if—- mo,
IR SSF RE COA RG RLMEWE UG “he PS Meee ‘ . . - * . ,
raahs hoa teoee red garg gig y ce ed . . . . . + ar *
_ Reece AUR CES eg ee a ‘any part of the premises is subject to an easement in favour of a distribution entityor.
te Se x 3 . transmission entity under the Electricity Act 1994 and the work is located wholly or parily in
Eanes oe HIRES S Ape seen es the easement;3:- , |
. e.. is , /, « the work is located wholly or paitly within 10m of a substation site; 7
Par eae eee MER ee eel . . _ . ;
7 HE | A) none ofthe 00 couse tence
_. Haid designated for comiiuhity $4%'119. Does the application involve development assessable against the planning'scheme and on land
jinlstncture’S ese wa os designated for community infrastructure?
[desighati fo oir ira uetre ray Suet {t) intended to be Supplied by a public sector entity; and 7 Soe,
gi lee eo Oa ciaeer ens " {ii)_ on land not owned by or on behalf ofthe State; and = . a
. TFot more Information reter.to schiedute’2 af the {Psst Poy ge , :
{ Regulation He PSE See 2 ee (ii) other than development — . : .
‘ fiijod siswerea VES. to O18 the application teres - fa) for the designated purpose; or |
pers Account TEGO Ae eek ceamete ete : : 7 . :
“fegumes assessment by the chief éketubve of fers: .
; depaniiien| administering the Act authoring thet (b) . carried out by, or on behalf of, the designator. . — ;
developmen ft he desiaated purbise: oo NO | - re oO,
elfan-agenicy other Wan the designator is the’ Sz Se t. _
serene Dane Fr th Spoleto, th Grae (] YES : mS ,
"——_déstahaliig' ager. nl bea concurrence sae fok J a .
.-» AU apillealion i retin Iie et Se ar cenemaranensn casa cas asp stngcia mune stoevacshagis oe tbe gedit ec ao ee
, . Page6 . |Section 13
‘ INTEGRATED PLANNING ACT 1997 _ i: : . IDAS Assessment Checklist, Version 18.0 10 November 2006.
; ESEQ.Regiohal Plan.” eee "420. _ The application involves tick applicable boxles)- ot Se a
, Ree Pema 2109 -O @ amateriat change of use of premises ~ = _
- ergectect Bi eo ce) (a) in a Major Development Area in the Urban Footprint for - . ,
gai we eae wt Pate OG see Saf . an tty . . .
j BEG fo Chane 2: pt 6a svcd ate -C1@ an urban activity . _ oo .
Rena eee a 7 , C} in “an area included in a Structure plan where the IPA, section 3.1.6
Beets Stair ht ete SEE ps rn aA Re . . ies” ‘ ; es .
- SAN tue cbse Wo Oa . ~ O inan area not included in a structure plan where> -
; ee + the IPA, section 3.1.6 applies to the application for the Material change
. HER ET bates Bae SORE A ay . mt of use; or oo, ;
es SUS sey CUE st , . _* the'premises exceeds 10,000m2: or | .
. hae ee ENE HB gto aks Meng Beat Fx: ipraty “ATM . s . . .
ee ae So + the gross floor area (GFA) on the premises wil! exceed 10,000m2: or
— PT URRY AOA os : «impact assessment is required under the relevant planning scheme ;
Ciel ee my .
gee “HRM NR eh a ce art a C] (i) intensive animal husbandry, Or - —
Ban ahs . wae wider, ee : pak . ' - ¢ as . . : sae . eae 6
Ce . CO) (ii) residential development in volving a tural residential purpose |
Een (b) in the Regional Landscape and Rural Production Area for- oo
hae en pias Piles of “a OC) @ anurban activity and not specified in Section 2.4(2); or
ae iv ES me ae me , C1. (ii) spetiiodincocien avon a rural residential purpose and not
Panik ine eos eethgsey oT cid . , ified in section 2. . ,
a ES ee ae (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2): . .
a O22 (d) in the Investigation Area for - ;
- Bee ee (0 an urban activity and not specified in section 2.10(2); .
SE i SE ee sig tN CEASE beer oh ' . : : or ae . .
ce OS eer : oy ; nubs
Peele ~~ (i) residentiar development involving a rural residential purpose and not .
a Se tad , Specified in section 2.42(2): or Do
Be EEE ES pected th section 2. “ ;
we = “ee GAR SE BE . C1}: (ii) intensive animal husbandry |
Kegel Sie 2 ye spatenaaiy te hee fe teh _. Cote ; —
ae ee ~ 0 -fii)-recontiguring ato - ;
ae Be eS Saar °° Ontand in a Major Development Area in the Urban Footprint that is: .
Selo We epteneres k reall 2 a Shama alpen, . . . . ot . : .
Be ee esas (a) not included in a structure Plan;and | ;
ber rie aaa ws / - (b). not specified in section 3.1{2). - . ot a
Bek ie tee Bewae! Se : — . (ii) none ofthe above _ 7 fe bet ee So 2 et: PTE NS ow eg tt . .
bhees tatters eo ee 21. The application INVOIVeS: (tick the applicable boxes) . /
Fes nition ea wae - (J(i) anassessable material change of use for aquaculture - complete Part 0, of Form 4;
~ Redulalidat 88S Saree es :: wy i, , . we. .
yas ou std be aera CI (i) assessabie Operational work that is the construction or Falsing of a waterway barrier -.
: «tis eboaion ues seat hes ot q complete Part Os of Form 1; . oo - oo e
; Dedarunent of Paniary indlishies and Hgherieg ii) ° assescah oni ; ith itat area.
NOPARS Te casement: y 2 (iii) - assessable operational work, completely or partly within a declared fish habitat are .
i iugasis Sie aK BONE wns Lestiai sd complete Part O2 of Form 1; -
A. C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
fier, Bits ere tate cp ie aias cu To . : . : : . . . /
(sib lace ay sre a plant - complete Part O» of Fonn 4: _
x PREIS ea 3 Waar -. . ; o
Rech ane wee Sy Oy development assessable under the IPA, schedule 8, part 1, on land that adjoinsa -
ES HE Rb vaip “Pat ne declared fish habitat area; : - |
fee OAS rok ee eR (vi)-none of the above, | einer mss daria
ey eth en ey Sie aa! Paint Me rh | Sethe ee. mite sets meseate oats tees Careee _ _ ae et ttm Uz es te ‘ .
. : . - :
+ . . . . - i
. . . . . . - . ‘Section 14
: INTEGRATED PLANNINGACT 1997, oe . *_"_-_IDAS Assessment Checklist, Version 18.0, 10 November 20. Ges
“Were and HIE] 22. The pplication inves: te eet bx = Ce
“Eres Wehrle a is area - C1 (i) a-material change of use assessable against the planning scheme for a purpose ne
, - Mrangport lca ee eb : 7 , oo . wee
“Un IRA# sofedile 20 De Ie Rerutaton a, , . ‘enfioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that 8
- Unless ye disterel “one ofthe sbovestie: 2] Schedule. - : .
| ibileaibi ones iene Cres geoncmmencge| oo So
ee ve eee a) (h(i) reconfiguringalom—
. AME Oe es _ . (J) _ ontand that is completely or partly within a public transport corridor, and the
ES) tal umber ofttsincteases, -
Sie ee oo, (1b) ontand thatis completely or partly within a future pubfic transport corridor or
Besos ER Se aare (}{c) -on land that is within 400m of a public passenger transport facility ora future
par Sone RE 7 ____ public passenger. transport facility, and the total site area is 5000m? or greater, .
TREES Gee ne - - [(}(d) > fora residential purpose within the 25 ANEF contour for an airport; .
co poo at ee os i — C)(@)__ fora residential purpose resulting in 100 or more allotments. =. .
. Sea es -. (0) ii) operational work assessable against the planning scheme, but not associated witha = -
Z ie __.” “material change of use mentioned in (i) above or reconfiguring a lot mentioned in (i)"
| oe ee a | above, on land that— : | es
oe “(1 (@)_ is completely or partly within a public transport corridor or a future public’
Cee ere | ______ transport corridor, —_ oa
or Ce fh. C1 (b) wil result in work that encroaches into an airports operational airspace.
a oprome ont 2h ee emenmamssnmrionnnstnuninas,
o Ey ean ‘23. The application involvés: (tick the applicable bowes)— ne ee
o shone a Bie ou ee reuibon {L) (i) a material change of use assessable against the planning scheme for a purpose ,
Loe eure he: se mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
, —-«-HRRPIRone etenekto ata etencurence:/. === Schedule: , 7 - .
REO ee) (] (i) reconfiguring alot—
BNE | 0 BE oo {J} (a) _ on land that is completely or partly within’a future public transport corridor,
OEE SS ogee pend co] 1" future railway land or a railway tunnel easement,
Sgt cre. ARIS pe ’. (Jb) on fand that is within 400m of a Citytrain passenger railway station or a future:
EE a 7 “” Citytrain passenger railway station, and the total site areais 5000m2or =~ .
Cop greater; re’
SO (JT {c) on fand that abuts rail corridor land, commercial corridor land or future railway
a a ee land, and the total number of lots increases; - o -
re . [_] (d) - on tand that abuts rail corridor tand, commercial corridor tand or future railway -
PRD 8 ese SES Tete Pre land and an easement abutting the corridor or future railway land is created; .
(0 BRS SE ioe gis Gk BAe el] - (J €) | ontand that is completely or partly within 100m of; and abutting an approach
, Te - '. "+. to, a railway level crossing, and the total number of lots increases; -
EMBL st Be MACE AP vad - (1 (8 for a residential purpose resulting in 100 or-more allotments, a
i an - (_] (ii) operational work assessable against the planning scheme, but not associated with a
@.... ie hapa cone Pee matetial change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
Dor vi ST , above, involving extracting, excavating or filling greater than 50m3, onlandthat- st;
ea a fe {J (a) ” is completely or partly within rail Gorridor land or commercial corridor land, and
. uo BO , yo. the work is not for rail transport infrastructure or other rail infrastructure;
a a ~ (J (0) _ is completely or partly within future railway land, or a railway tunnel easement,
ee ef (c) abuts rail corridor land, commercial corridor tand or future railway land, and
De ee, qo ih. the work is within 25m of the railway boundary. . . .
BL iv) none of the above. ee
'_“‘Mooriiésto:Brisbane pipeline.“ | 24. The application involves the easement for the construction or operation ofthe Moonieto
> Ror take inbimationsefer to Setiedule 2of the (P Brisbane strategic pipeline, and involves: (tick the applicable box/es}— - tes
‘ieee snone otthe‘dtove’ the (J (i) a material change of use assessable against the planning scheme andnotassociated
"Application Wiggers referral to the holder of pipeline : - with reconfiguring a lot, and any structure or work will be located wholly or partly in the
“lcariog No.1 Gil ari ie Fes Act 1923, easement. oo Loe _
. cay Saito ONT Ply Lifer aie ~ (1 (ii) reconfiguring a tot .
an oot _ 1° [J Gill) operational work assessable against the planning scheme, thats filling, excavation,
, wre Sep tk ee i work is located wholly or partly in thé easement. - 0
Bs Coot . compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the :
ET se 8s. 7 -B] (ivpnone ofthe above. ym, oe
| pmyes . -Section 15
Pe aa . : - : . . . . . ‘ : . . ; my
"INTEGRATED PLANNING ACT 1997, _ ne __. IDAS Assessment Checklist, Version 18.0, 10 November 2006 -
habitat ane “gic gev iy vag) 20: The application involves: (tick the appicabie boxes) — | oF
> gies 2a te Reauote ee “ ie aes [J (i) a material change of usé of premises in a koala conservation area or koala’.
Hee on BORE PEEL aE -. Sustainability area made assessable under a-planni scheme, that is not for a. domestic -
a mie nr ane i ga ete et ee aed poms pee See iat ing : :
epee aseeatineieetbe mee) activity and willresultin- ~ _
Rice ne eee ae CJ (a) clearing of native vegetation over an ared greater than 2500m?:
BAAS Gab s eFol n Sh sal oi Gah EN PR LY ff . ; . - . :
so ERAS SoS pee ens - OJ) anew building and any reasonably associated structure with a total footprint .
Bay fer REE PR cle aie Sere oo reaterthan1000m2, a So ;
Mabie ccrahol Bipy hale) eee . - oF onal "or . oe
ie Be lp gtk te BSE eke Oe an extension to an existing building and any reasonably associated structure if
vo geass ae sh Bagger BSP RSS , . the extension has a total footprint greater than 1000m2,
. ee Gar OUEA Pnes ces ciel Ape ee Eee Ty at ncaa . a : . . . .
. Ke Wiech onecde ieee _ ~~ (1 (@) extracting gravel, rock or sand from an area greater than 5000m2,.. .
. Paracas Sa gai a gaee ‘C1 (e) excavating oF filing an area greater than 5000m?; oO
a oa eo Ste ea ac i - [-1{) additional traffic in a-koala conservation area or koala sustainability area,
GE i onboroorste an SIMA AB OE aba _ between 6p.m. on a day and 6a.m. on the following day. . .
aoe ee ed TERS Sek Dt eS TALES Cay cre apads| . . : . ° ° . '
: YS ere note. avs Sasi; : . ° . . rae oa
fe oo. be Rees 8]. (qi) reconfiguring a lot in-a koala conservation area or koala sustainability area that will ,
EM cub tn came ae hy adic -. resultin . 7
ae THR SS ORO teserer ee] ;
REPOS ee ae : _ Cl fa) anincreased number of lots; - : oo,
BS Be oe ek Foal Pees [} (b} clearing of native vegetation over an area greater than 2500m?.
DR ootoad hoop an ae eo ee fo : . wa, : befehitt. oc: :
GSES ESI SHS RECA RE _ C1 (il) operational work in a koala conservation area or koala Sustainability areamade =~
ORR ie SE Shee assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with Bt
est se Segd at gee een figuring @ fot mentioned in (ii) above} that will result in the clearing of nati tation
Bi i ade Se bing ha eg JFeconfiguring a k mentioned in (i) above) that will result.in the eanng of nai ve vege' :
oy SAS CS . OVer an area greater than 2500m?. ;
ee [1 {iv) operational work in a.koala conservation area or koala sustainability area made
oP AE TROIS SES ke EY 1 ye . . . _ eee as . : :
DE Re eS RGR Se a ee "Assessable under a planning scheme (not associated with @ material change afuso | =
Bee ea VERE mentioned in {?) or reconfiguring a lot mentioned in (if) above) that is not for a domestic activity
re (aT Shaner! es and willresultin-- So . oo ,
ae fey wh SS RAN Boe Sines [_] (a) clearing of native vegetation over an area greater than 2500m?;
Bree meee . we ee OED ED) ‘extracting gravel, rock or-sanid from an area greater than 5000m?,.
PGA Sues a) (c) excavating or fing an area greater than 5000m?. |
es ld funmeotinedoe ss |
Referral coordination“. *"° "126. Does the application trigger referral coordination? -
- (Aalitiaon ruts von tera esaiatoh| oO : eT :
4 a atte cere pes or ap EAVES, the application: (tick the applicable box/es) —-
the application invowes rcs s EP ee °
or stating see ad feed Le - Cf) tigers 3 or more concurrence agencies: oo
, schedule? of 8 of tha [P-Redutation: « . Meg ee eg, . . no . .
(ii) development which is subséet to ‘ari a “fo * (1) (i) involves a material change of use made assessable under a planning
"| application tor pretimiixany-approwal <3) " ". scheme and prescribed in schedule 7 of the IP Regulation; .
|. Tineronied in 83.26 ot the las sy oS ss re
“Fog rhore tikirmaticiy go t6 Guided bad Gunga 6 3 ; C) {iii) - involves a material change of use (ather than a dwelling house, outbuilding
pe RISES SSE ge farm building) made assessable under a plannin scheme, or
1g) Mme 'p g
; Co reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;
Gy stra retina sorovl merionedina46cfhePA
. ‘Referral agency responses priorto:” “] 27. Did.a referral agency give a referral agency response under $3.3.2 ofthe IPA before the
‘Todgement oe. ee: application was made to the. assessment manager? _- ; , :
.. _» Féferraf-agency resporise ofS miattbr. within its” ” : . : - . ‘ .
-{uristfiction shout & propisal:betore any dpphicatior ication: . - ; So
“fore propose is hades Oe sSsessrient. ES attach 2 copy ofte referral agency/s responsels
manager a uo : , :
Old Fire aitd Rescue Service):" wt ES wi reg yy —_ wh ates on Wi igen cde, set oh Ih eet tad li aeuteties y . 1 = Ae ie wepstiees resdscare dats pee me MSE . :
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the So
' "completed IDAS Assessment Checklist (if applicable). .. . — : * .
OFFICE USE ONLY (applicable to assessment manager) - ; oe OG
. oe . 7 . . . * ; . . i
; Page 9
SSSection 16
"INTEGRATED PLANNING ACT 1997 a DAR Assessment Checklist, Version 18.0, 10 November. <=
| ' ~ SECTION 2- BUILDING REFERRALS (completion not mandatory) = 8
. Below is a list of the referrals that can apply to.an appfication for building work assessable against the Building Regutation 2006. This section of the IDAS i
_ Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed andlodged wih an *
. ‘application for building work assessable against the Building Regutation 2006 only. oo oo Loo
———_‘iSpectal fire setvicessigenerally.i=,<.<| 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency ifthe building work |
Stor mors inforiason go ib sched 2 (abi6:t and’:"| requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(7 pSthedite 20 of te IB Rebun, i (IP Regulation) or includes an alternative solution assessed against the performance requirements of the -]-
ASSES sgn a Nee es ~ Building Code of Australia. mt Sf
Spermed refusal RUN, ee _— _
belie safety forbidgevaccominodation®=| 2. ~ An application may trigger referral to Qld Fire and Rescue Services as an‘advice agency if thé building work
_ St nore nixon go fo sees 208 IE 7 _ _ the subject of the application requires the installation of a fire safety system fora budget accommodation
_ | Spray painting ©5288 227573, An application may trigger referral to the Department of Industrial Relations (DIR) a8 a concurrence agency |
~ | Fosrere inferno goto sebeid 2 Ke IE 3) if. the application involves a workplace incorporating spray painting.
-— pRetttation ee oa eee ee te . - _ __f.
‘Retail: meat: premises's 5." <4] 4. . An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a_|-
"HE Grmiore intoniiation do to Sehetiie'2 obhe IP") retall meat premises, - 2 ;
- iBrivate health facilities 2cie4-2"'°] 5. An application may trigger referral to the Department of Health as a concurrence agency if the application |
- or iase einen ene Ne involves a private health facility,
_ [eau Ce ee _ . - _ _
| Workplace arealess than 2sim?. "22.16. An application may trigger réferrat to the Department of Industrial Relations (DIR) as an advice agency ifthe|
for mare information go to iedite Zhe") application involves a work place area less that 2.3m?. oo me
| flandicontiguotis.tora-siateee rotted 7. _-An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
- Haden iG eye WR es Sere °° -agency if the application involves land contiguous to a State-controlled road. —_
__ bee eration 9616 schools of EIB so .
Regulation i al hela te Sg eo ae __ :
. [Pastoral workers accommedations*|8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
Fob cre incre go-to Sehetite 2 ase ‘if thie apptication involves pastoral workers accommodation, *
© pBédufson nae nn PST TEE _ : .
- (Child. care.cenitye:'-:<)s °°"; 219. An application may trigger referral to the Department of Communities-as a concurrence agency ifthe
ior fhoré inforinallon go to ‘schedule 2 ofthe [Be 2. application involves a childcare centre. - v . oO fou
. Regulation“. eS UAE USS _ ‘ |. - : J;
.pGoastal development: <=". <1 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency.
- or more information go to Sctiedule 2 of the IP = if the application involves land completely or partly seaward of a coastal buildingline2, sO
. - PHeritage . - a: oe ne 414. An application may trigger referral to the Heritage Council asa concurrence’ agency if the application
| For more information go.to schedile Zofthe IP. involves a herilage registered place.. - ~~ .
| Resutation Se wo od
"| fisheries matters °°" "<1 42. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI@F) as a
- {Fer more informatich go to schedule 2 of the IP °° concurrence agency if the application-involves assessable building work in a declared fish habitat area: or
egulation To “UF -as an advice agency if the application involves assessable building work on land that adjoins a dectared fish
* GHritegration of tand.use arid public. :.:) 43. An application may trigger referral to Queensland Transport as a concurrence agency ifthe application =|
" fansport =) > eat involves existing or future public transport corridors, or airport operational airspace), .
; ‘For more intérmation 96 to schedute ofthe IP.) oo . vs a -
- ’PRaitway-safety and:efficienty .. ~ -:114. An application may trigger referral to Queensland Transport as a concurrence agency if the application. | -
For more information go to schedule, 2ofthe{P .| involves future railway land. oy 7 ;
, NOFE: CONCURRENCE AGENCY ASSESSMENT PERIODS ~ , _ wo ’ ,
: The local goverment, ‘as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed -
- time. For applications-relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period Is 5 days. For all
other applications the assessment period is 15 days. Ifno response is received from the local government for an application, it is taken to be a deemed .
. _ *fefusal. However for amenity and aesthetics impact of particular building work for a single detached class 12 or class 10 building or structure (15), no .
response is taken to ba-a deemed approval. oo Ss ot “
"Amenity and:aesthetic impatt.of 1 15. An application will trigger a referral to the local govemmentifitis: - oO , -
__|\particular buildinig-work for single: =] =» for a single detached.class 1 building or class 10 structure; and , a
. detached classt-hullding:orclass-10"} the focal govemment has declared by resolution the following: oo Foe
| | filuildingor'structure UT — the appearance of the building or structure will have an extremely adverse impact on the amenity of |
* | For more intormationigo to sctiedule Ztanle tof the the locatity; and oo
HRentafon ES — the appearance of the building or structure would be in extreme conflict with the character of the
7 ‘Assessment period: 15 days. No responsa is’@..~.« locality oo .
2 Coastal building lines are prescribed under the Coastal Profection and Management Act 1995. oo . - “ot -
Operational airspace is as defined in State Planning Policy 1/02 “Development in the Vieinity of Certain Airports and Aviation Facies’.
. Page 10. : ‘Section 17
_ "INTEGRATED PLANNING ACT 1997 ae _ _IDAS Assessment Checklist, Version 18.0, 10 November 2006
_» Whether partictilar buildings:tiay-he' | 16. “An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
; Occupied for residential purposes. ‘feferral to the local goverriment-as the coricurrence agency. - oy -
- — YAsestineht period 1S days: Norespome a.
-; (DeStaiania siting <5 2755°7,117, An application may tlager referal to the local govemment as the concurrence agency ifthe building work}
Lo Fora late’ 9p fo eho ie 1 bri does not comply with the performance criteria of pasts 11 and-12 of the Queensland Development Code.:
ot ES OS De eee 5} 18. -An application may trigger referral to the local.govermment as the Concurrence agency if the building work
Ascessitent period S days No fesporse 5425721 — does not comply with the qualitative statement for building clearance and site cover. —_
ee ae ee 19. An application may trigger referral to the local government 4s the concurrence agency if the building work
Pe RSS| does not comply wit the qualtave statement for performance itera 4, 5,7, 8 or 9 ofthe Queensiand |
iRlte safety int particular budget. ""'! 20." An application may trigger referral to the local government as the concurrence agency to determine the . |
accommodation buildings: ">. building will comply withthe fire safety standard under the Building Act 1975 when the building work has
‘Eat more infortation go fo sehedite Zable ofthes]| been completed. _
PA OR ied aniiar ro ee ci EAS ne PR ae ° : .
ase ona Fe days No response 8.) a He
* [deemed telusals se KS ec real = __ _ |
iHigher-fisk personal appearance: 7": 21. An application may trigger referral fo the local goverment as the concurrence agency to-determine ifthe
NS | ngok oe . oo
ative orneton Go sche Z tte a et ‘e - complies with the performance criteria of the Queensland Development code part 15; and _ OO
FE Resulsion aid the QDC pat 15: Se er ¢ the work does not comply with an acceptable solution stated in the part. .
"gpg ren ens UNE Ne eres 23 eS oe :
. Building work fot fesidential Service. 22. “An application for building work for premises in which residential care service under the Residential
‘ffektiete Biemalen bots schsdue at Partie| Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, wil trigger’
a oe oe ce 5 wef erral to the local government as the concurrence agency. -
‘Building workfor Binoval OF e.75- 2°] 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
pebuldiig oe eee ee referral to the focal goverriment as the coricurrence agency. , . f.
Meeipe iba Fa Sag et ei = - oo
. BUNGIE Work fet ainveteetanein 24. An application may trigger referral to the local goveriment as the concurrence agency to determine ifthe |
, designated rainwa ter Ganklares. fed building work or Structure complies with the relevant performance criteria if - . -
Fo: ote fT gb ek eee 2 table tot’ ‘Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
Je Reaifanan wid the Qoepatt 25: eerie s) building work, in‘a designated rainwater tank area; and . - =
Resse boviod Ie lisys::No fespatise'ss a". * Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable | -
: ; : Page 11. , 4Section 18
* ‘gui. APR. 2007p 17: 3 ipummmmumegEPA SOUTHERN REGION 07 32258723 NO. 5136 -P. 2/7
re we CEVA ett ‘ - . .
: , 3 a ‘s oo i is, . . ,
eco Pre; j
CEPCEECERGEEICHIS! .. *..
an a Notice
Coastal Development .
Notice of decision — Provision of evidence of “resource entitlement”
This notice is issued by the Environmental Protection Agency pursuant to section 3.2.1. of the Integrated Planning Act 1997.
Brett Paton . Ce: Chief Executive Officer .
c/- Noosa Jetty Builders Noosa Shire Council
PO Box 299 PO Box 144
NOOSAVILLE QLD 4566 TEWANTIN QLD 4565 :
@ Your reference: * ’
Our reference: BNE31110 Project Ref: SE9BAP2673 ,
Attention: Danny Reed
Re: Request for evidence of “resource entitlement” for the prescribed tidal work application forthe __
removal of existing pontoon and construction of a jetty pursuant to section 3.2.1 of the integrated :
Planning Act 1997
__ The Environmental-Protection Agency, under the “Land Act (Tidal works and prescribed tidal work) Delegation
(No. 1) 2005", has considered your request received on 26 March 2007 and wishes to advise you of the
decision as specified below. , ;
prescrbed tidal work | |
@ Demet on: Removal of existing pontoon structure and construction of jetty.
Description of |_| 74 Noosa Parade, Noosa Heads |
Subject Land: | 1 of 268 on Plan N21654
Pian / Drawing Drawing No: 07/301-1, dated February 2007
Numbers: Drawing No: 07/301-2, dated February 2007
Decision: Evidence of “resource entitlement” is granted. The application may proceed in the
. absence of an allocation of, or entitlement to, the resource.
Decision —
ae ya 2
Page 1 of 2 + 060116 [27 RECEIVED i)
. Sy
Saeed Protection Agency 106 . OY: ueehstaha Govelifent f:
a
se 5 “ROONG COUNTER
ww. epa.qid.gav.au oe a io AG hase sett hes “
LTT EYSection 19
fot IQ. APK. 2007 Tf: 3) tPA SOULHERN REGION O/ 32758723 NO.5136 =P. 3/7
ecoaccess .
anvironmental fieences and permits
Notice -
Notice of decision — Provision of evidence of “resource entitlement’
rm er
You are advised that all applications involving disturbance of marine plants require a development approval
from the Department of Primary Industries and Fisheries (IDAS Form 1 Part 02).
Itis important to note that the provision of evidence of “resource entitlement” over State land means that the
State has no objection to the lodgement of the application for development approval. It does not:
° imply consent to the development application; or
« affect functions the agency may exercise as the assessment manager or a concurrence agency: or
authorise a right to use and occupy land
An early concurrence response is enclosed. You will not be required to forward this application to the
Environmental Protection Agency for concurrence assessment during the IDAS referral process.
If you require more information, please contact Bob Hearle the Project Manager, on the telephone number listed
below, ©
Yours sincerely . ,
a 10 Apnl 2004
Signature Date
Tara Collins ‘ Enquirtes:
Operations Manager Coastal Coastal Unit
‘ Environmental Operations (Southern Region) Environmental Protection Agency
Environmental Protection Agency ne . PO Box 15155
CITY EAST QLD 4002
. Telephone: 3225 1210
Facsimile: . 3221 0768
Page 2 of 2 * 060116 Environmental Protection AgancySection 20
* Mmi0. APR. 200717: 3 lpm PA SOUTHERN REGION 07 32258723 NO.5136 PA/P
5 on oa re mass +)
oo ; 7 ; an aN Pan art : ‘ ne! vont , : : _
a 7 ert a “. ie m oo
Mar Notice
. Coastal development
Notice of Decision — Early Concurrence Agency Response
This notice is issued by the Environmental Protection Agency pursuant to Section 3.3.16 and Section 3.3.18 of the
integrated Pianning Act 1997 to advise of a dacision or action.
Brett Paton Ce: Chief Executive Officer
' c/- Noosa Jetty Builders ’ Noosa Shire Council _
PO Box 299 PO Sax 141
NOOSAVILLE QLD 4566 TEWANTIN QLD 4565 . -
@ Your reference: n/a *
Our reference: BNE31110 Project Ref: SES8AP2673 . .
Attention: Danny Reed
Re: Application for Operational Works for Prescribed Tidal Works for removal of a pontoon and
construction of a jetty in the Noosa River at 74 Noosa Parade, (Lot 263 on Plan N21854) Noosa
Heads. “8.
The EPA has assessed the application received on 26 March 2007 and wishes to advise you of the following
decision(s):
: . EPA Decision
Activity (R: A D
ivity (Referral triggers) Pproval type
Operational Work that is: Development Approval | Response provided IPCC00S78007
= Prescribed tidal works — Concurrence Agency | subject to conditions
Response that must attach to any
© development approval,
A corraspanding Concurrence Agency Response is attached for each assessable development type that .
includes any stated conditions applying to an approval or gives the basis for refusing an application. Please
retain thls documentation for your records.
Please note that it is a requirement under Section 3.5.15 of the Integrated Planning Act 1997 that a copy of the
finat Decision Notice (which includes the Agency's concurrence conditions) for this application issued by Noosa
Shire Council, be forwarded to each referral agency.
In addition, the State’s Native Title Work Procedures indicate that responsibility for assessment of native title
issues for an IDAS application rest with the Assessment Manager. -
Page 1 of 2 + 09/03 Version 1.1
Q aueenstanasovernmen
: Environmental Protection Agoncy Environmental Protection Agency
; www.eps.qid.gov.u ABN 67 221 158 786 Qurenstand Parks und Witdlife ServiceSection 21
FQ APR. 2007 17:32 EPA SOUTHERN REGION 07 32258723 NO.5136 =P. 5/7 -
ecoaccess oe a
‘ . , - Notice
me Notice of Decision - Concurrence Agency Response
Review and appeal processes may be available to the applicant in regard to this decision. An extract from the
integrated Planning Act 1997 (iPAct) is attached. This attachment details the applicant's rights regarding this
decision. The applicant should seek independent advice to confirm the procedures available. ,
Wf you require more information, please contact Bob Hearle, the Project Manager, on the telephone number .
listed below.
Yours sincerely
Tara Collins - Enquiries:
Operations Manager ~ Coastal ; Coastal Unit (Southern Region)
Environmental Operations (Southern Regian) * Environmental Protection Agency
© Environmental Protection Agency PO Box 15155
CITY EAST QLD 4002
Telephone: 3225 1210 .
: Facsimile: 3221 0768
Page 2 of 2 * 08/03 Version 1.1 Environmental Protection AgencySection 22
°° "mld. APR. 200 7m 17: 32 pomt PA SOUTHERN REGION 07 32258723 NO.5136 =P. 6/7
| ae .
on =O 0 ns PEM ee
PEEEPR RETR gf
. : oa ear ACR att 8d Wt
rn :
| 0 Response
MERITS Ci ,
Coastal development
_ Early Concurrence Agency Response - Coastal development
This notice is issued by the Environmental Protection Agency pursuant to Sections 3.3.16 and 3.3.18 of the Integrated
Planning Act 1997.
EPA decision number: IPCC00579007
Approval type: ; Early Concurrence Agency Response ae
e EPA application date: 26 March 2007. os
| Relevant Laws Coastal Protection and Management Act 1995 and subordinate legislation
and Policies: 96 9
Concurrence Agency —_| item 12 in Table 2 of Schedule 2 of the Infegrated Planning Regulation 1998.
. ‘Brett Paton te
Applicant: c/- Noosa Jetty Builders
Operational Works carried out within a coastal management district that is
Activity Description: prescribed tidal works; being the removal of an existing pontoon and
. construction of a jetty .
Description of Subject 74 Noosa Parade, Noosa Heads
Land: Lot 268 on Plan N21854
@ Response to Development Application
The concurrence agency response is that conditions must attach to any approval for the development.
_. Applicable conditions for the approval or reasons for refusal are provided in this response.
Reasons for the inclusion of development conditions
In accordance with Section 3.3.18(7) of the Integrated Planning Act 1997 and Section 278 of the Acts ,
interpretation Act 1954, the reasons for the inclusion of development conditions are:
® The Environmental Protection Agency is recognised as a concurrence agency under the integrated
. Planning Amendment Regulation (No. 1) 1998 for coastal management, other than amenity and aesthetic .
significance or value. Development conditions placed on the development approval for the application
are in accordance with section 106 of the Coastal Protection and Management Act 1995.
Page 1 of 2 - 09/03 Version 4.1 , ,
: Q owcessians Government
Environmental Protection Agency Envireomental Protection Agency
werw.epa.qid.gov.au ABN 67 224 158 768 Queensland Parks and Wildllfe ServiceSection 23
vo + 40, APR.2007.17:32 EPA SOUTHERN REGION 07 32258723 NO.5136. 7/7
environmental ticences and permits . ~ .
; . . . ‘+ Response
me ‘’ Early Concurrence Agency Response
The Activity for which this development approval is issued is simply a restatement of the activity as prescribed in
the fegislation at the time of issuing this development approval. Where there is any conflict between the above
description of the Activity for which this development approval is issued and the conditions as specified in this
development approval as ta the scale, intensity or manner of carrying out of the Activity, then such conditions
prevail to the extent of the inconsistency.: ‘
This development approval authorises the Activity. It does not authorise environmental harm unless a
concurrence agency condition within this development approval explicitly authorises that harm. Where there is
no condition, or the development approval is silent on a matter, the lack of a condition or silence shall not be
construed as authorising harm.
. As part of the concurrence agency response the following development conditions are to be attached to the
development approval: |
Conditions:
Agency interest. Coastal =
) . 1. The works must be undertaken in accordance with the plans listed below, .
Drawing No: 07/301-1, prepared by John Norden and Associates, dated February 2007
Drawing No: 07/301-2, prepared by John Norden and Associates, dated February 2007
Additional information for applicants
It is a requirement of the Environmental Protection Act 1994 that if the owner or occupier of this site becomes
aware a Notifiable Activity (as defined under Schedule 2 of the Environmental Protection Act 1994) is baing
carried out on this land or that the land has been affected by a hazardous contaminant, they must, within twenty
two (22) business days after becoming aware the activity is being carried out, give notice to the Environmental!
Protection Agency. A list of Notifiable Activities is provided within Schedule 2 of the Environmental Protection
Act 1994.
Yours sincerely
‘ (2 Ao 2064
Signature , Decision Date
: Tara Collins Enquiries:
Operations Manager - Coastal Bob Hearle - Coastal Unit
Southern Region — Environmental Operations Southern Region — Environmental Operations
Environmental Protection Agency Environmental Protection Agency
PO Box 15155
. CITY EAST QLD 4002
Telephone: 3225 1210
; Facsimile: 3221 0768
. Page 2 of 2 » 09/03 Version 1.1 Environmental Protection AgencySection 24
a a
Queensland
| : ’ Government
16 March 2007 Maritime Safety
; Queensland .
Noosa Jetty Builders
PO Box 299 Queensland Transport
Noosaville Qld 4566
Dear Sir
Tidal Works — Request for comments
Jetty - B Paton, 74 Noosa Parade, Noosa Heads (Lot 268 on RPN21858)
@ Thank you for your letter of 26 February 2007 about your proposal to construct a jetty at the location
mentioned above.
AS a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
foflowing navigation and marine safety conditions are complied with.
1. The contractor must build the jetty according to John Norden & Associates, Drawing No 07/30-1,
attached to your letter dated 26 February 2007.
2. No part of the structure or any ship berthed at this structure, is to come closer than 1.Smetres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan
07/30-1.
3. In the absence of a designated quayline, the structure and any part thereof must not extend beyond
that of neighbouring approved structures.
e 4. The jetty and all freestanding piles must be lit and clearly visible to approaching vessels. The
contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels. ae ,
5. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995,
6. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
, 1994 and the Transport Operations (Marine Safety) Regulation 2004.
Maritime Safety Queensland Ourref —_710/01487 P35177 F11 £19743
Marine Operations (Brisbane) : Your ref
MacArthur Avenue East 1 Enquiries Anne Senden
Pinkenba Queensland 4008 Telephone +61 7 3860 3536
Facsimile +61 7 3860 3571
ABN 13 200 330 520 . Website www.msq.qid.gov.au
Email [email protected]Section 25
ore}
7. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe .
access to or from neighbouring structures.
8. Any ship moored or dry berthed at this structure must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall - 5.0 metres N/A .
Beam - 2.0 metres
9. The contractor must construct the jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
. met. ; :
@ The above conditions must be included in your application to the assessment manager. :
This agency will also forward a copy of this letter to the Assessment Manager. |
Yours sincerely
v ag
Captain Richard C Jo is ; : }
Regional Harbouy Master (Bri ane)
Maritime Safety Queensland Page 2 of 2Section 26
EE Noosa I -_. LAND USE SECTION FEES |
oe So RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme'Decumentation 520
Copy of Permit/Approval Letter 7 110
The Noosa Plan Documentation 111
APPLICATION FEES: , | oo .
mo Materiat Change of Use - Code/Impact
Consistent 521
Inconsistent 521
- Assessment under Superseded Planning Scheme _§21-
Modification to a Development Permit = 521.
os Extension of a Currency Period a _ 521 -
Operational Works - Landscaping . - _ 521 .
@ ’ Bldg Work assessable against the Planning Scheme : 521
PRE LODGEMENT REVIEW ~ . . | -
Half Hour §22 |
One Hour . , 522
ADVERTISING ,
Purchase Advertised Applications §23
JETTIES | - oe | Bde
Jetty Application Fee [2oo 524.
~ Jetty Bond Soo $4 Frec } ry)
(Category 4)
BONDS oe
Performance Bond - ; 51
(Category 9) -
SIGNS 7 : oe . .
Registration Fee mo, oO So 222
s@curee tt” a |
Search of Land Use Section file 112
. Liquor Licensing Request : , 113 . mo
| | TOTAL. $ |100
NAME: J Me Cor _ _ :
ADDRESS: | | | _
FILENO: O72 E727 DATE: 7/uclor 7
RECEIPTNO: | 254U5+ - - Signature of TP Officer: (” . oe
AUTHORITY NO: _ |
| } | Zoo7 [/ 616] | | |Section 27
. . j
: — CALCULATION OF FEES | a | :
APPLICATION. FEE.—OSN TOTAL 7
| cL | FEES |
MCU - CODE ASSESSMENT | : : |
Details of Development eS .
- |Consistent 4.0: . | —— Ss
Inconsistent 3.0 .
_ |FEE CALCULATION oe
MCU - IMPACT ASSESSMENT ®
Details of Development ef
Consistent 1.0
{Inconsistent 3.0 .
FEE CALCULATION ~ | | |
OPERATIONAL WORKS — a | |
Details of Development . So
FEE CALCULATION ~ | | e
TOTAL FEES — ———"F Oo
- , . : : . ty . ,
- a - . . - . ee -- + t et . a , - ? . , oe ----- ee oo --- i
’ |Section 28
NOTES:
OTHERWISE TIMBER ORD Oe ree a CLASS 1 2.0 ‘Pa REAL. PROPERTY DESCRIPTION
LOT 268 on N21858
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL COMPLY WITH Parish of Weyba ie
County of March
THE ENVIRONMENTAL PROTECTION AGENCYS' OPERATIONAL POLICY - Site area: 611m2
"BUILDING AND ENGINEERING STANDARDS FOR TIDAL WORKS.*
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE APPROVED MARINE
GRADE 316. ALL OTHER STEELWORK INCLUDING NUTS, BOLTS, WASHERS,
SCREWS, NAILS, ETC., SHALL BE HOT DIPPED GALVANISED OR STAINLESS NOOSA RIVER
STEEL.
JETTY USE: 9170 APPROX 6800 OVA
4, TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED OR RINGED. SINGLE USER, PRIVATE
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM THE DRAWINGS. NO VEHICULAR ACCESS sa fe EE NOMINAL QUAYUNE {
LENGTH: 6.0m TO BE REMOVED jf
EXISTING MASS: 1080 kg ee EXISTING PONTOON
PROPOSED ~— te
JETTY
i
J-djd 9 SA 4 Ors ( ORR =e. C C2 cA fis
200 x 75 5@ De;"6: Py C2 rc Cx?
CASA CSI YS oY KS SS
\- So <>
i", LS St CO
ys)
O
1600
$1670 APPROX OA 6060
‘ ao
+3 Z9*
KICKER: ye ee
38 x 75 HWD (3%
neh!
DECKING a] ie LOT 200 LOT 268 i
Be LOT 2487
38 x 125 HWD pre ef one
Pa sect
611M2
STAIR TREADS: 150 x 75 a
i
50mm MINIMUM ia
THICK TREADS
TENSION RODS
aaT0
@ 250
190 x 75 ——<—— ee NOOSA PARADE
SITE PLAN
wees 11 _ fh PILE-IT PTY LTD B. PATON RABRINK PTY LTD T/A DRAWN DATE
NOOSA JETTY PROPOSED JETTY John Norden S ASHTON
| | BUILDERS LOT 268 & Associates ———
Ucerce No 723720 (No.74) ACH 010 263 677
ABN 55 000 036 736 Swesterel { Covi Denign Enginsera MBaUE
20 S maet Deve Prax 07 64564762 NOOSA PARADE Suite 16 Towers WORKIb DRG
FRAMING LAYOUT Cx 4667 tore 0408 137526 NOOSA HEADS Averus { PO Box 205 oreo [O]
0417 740046 Tewanéna Q
Ph: O? §4497137 Fax 07 64497172
johnnarden_sssocgpinasrade.on netSection 29
aw
176 RISER
7 ee F =
fo
SI oN
lg ee ——we SIS Pace || HAT 0.56
_ ;- ~ ah —<—<—<—o=<§< TE ina
eer, v
- cnet re re A ar —_MLWS -0.28 A T ———
—J
|
FRONT ELEVATION SIDE ELEVATION | fs sf
| i ||"
| PILE-IT PTY LTD
NOOSA JETTY
BUILDERS
126 1 38 HWD DECKING 180 x 78 Ucenos No 723720
1/78 x NO14 TYPE 17 CRS | Sa ABN 56 090 036 736
Prvfex 07 54564762
Re NS ee ee es Os 0 Noone Heade Mabie 0408 137528
Qid 4567 0417 740844
| et N B. PATON
Vv) Vv) 1M618 B/S (rt o 1 ONLVANZED Mad PROPOSED JETTY
STEEL OR 10 pl STAINLESS
M18 VS 216 85 TO EACH LOT 268
(12 pl GALVANZED MILD STEEL,
180 x 75 MWD HEADSTOCK
iMi6 8/3 BOLT TOPAES 14416 8/8 BOLT 14416 9/3 TO HEADSTOCK / PER SES ONS ¢ ) (No.74)
1AM16 9/8 TO DECK
216 3 TO STAIR STRINGER NOOSA PARADE
@ 250 H6
PILES. NOTE: ALL PLES NOOSA HEADS
TO ASA PLING
2186 - 1870
SEC TONS x 5 SECTIONS t \ J PTY LTD T/A
John Norden
& Associates
206 x 75 216 S38 IN ACN 010 263 877
‘Structural / Civi Design Engmeers
180 x 75 WWD 280 5 60 STAIR S
Sule 16 Tewarntin
76x76x10 ANGLE BRACKET sannen 150 0 75 am Tewentin / PO Box 206
at FO CONCRETE FACE: Pm: 07 54497137 Fax: 07 84497172
ONE M16 &/38 @ 280 Pee S TWO 100 x No14 &/S SCREWS Johnnorden_amecogjintemoce.on.net
DATE
216 8 8 ASHTON FEBRUARY 2007
116 &S 200 x 75 200 x 75
“NN
14416 B/S
DETAIL ‘ 1 ) pe TAlL ys 2 \ 160 x 76 14416 S/S DETAIL ae WORKIN DRG
ae Ally : 5 -07/30-2 |Used in these records
0014CBAC.001.pdfRelated documentPublic source context ↗
07/0676 - Op Works - Timber jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.