Council archive · source document
0014CBAC.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NEOLONe ee Checklist - Applications Involving Land
moe Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
EARPLIC ATION EORMS RTE ST SUE EE NY PE
14.1. Form1 PartA
‘ 1.1.1 Ensure that the form is fully completed. me
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 ifthe owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [J
‘ 1.1.2.1 Ensure that each of Forms 8-O which are attached are fully completed. [4
2aee REFERRAL INFORMATIONS Se ae eg Gea Me GN ene Noo unre [email protected] Ensure that items 1-23 have been checked and/or completed with regard to referrals. K []
ry ane ee erp ce nena career ae ay marae pate 7 3 oe Sle As REBT TT
SRE ENVIRONMENTALLY RELEVANT ACTIVITES TASucs utiwe nad Scare umm Nmea re
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
*eRRORMZEREQUESTsT O. CHANGE APPROVAL Aran aa irienen Rouen aut en ee oprs
YAR TR ee ae a TA RIA EER DD DOAUAL PAT EMU iL NERY aE ee SITE NT Pha i. shel [ag
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
EEE LEAT SS CRU TOME Bast eet samuel SRL OR TROT RNEEEY Fist Yd CREME ea CR ER inrn IRM AAs SAB Tg BN
BS UNS ae a a RR TRS ATE
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! [ec]
" Works) accompanies the application. In addition ensure that each set is complete.
. 5.2 Ensure that 1 of the copies of the Pian of Development is in an A3 or A4 format and is [4
unbound.
SEM SURBOR TING INFORMATION LYE ae es OU Ra
, 6.1 ‘Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration [ - |
and Operational Works). !f the application is accompanied by a covering letter, ensure that it is
@ capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =
BOER Bm ea SIRS opts soe i Be DE AST DD cel ere be aac: ree SAT Re ae Oe Bas PReR oie a fe ee i sgt
TITRE LEE a a et ee ee nee a enous
: 7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. . , |
Receiving Officer . SAB Aa cece Date LOL MY Dyce secon
Having completed this form and accepted thé.Application, please deliver both to the following IDAS Application Receiving
trays:-
«= If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
e Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
e If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
e Inall other circumstances — AOP1’s desk in the Land Use Section.
Please OO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEPI g:\ant\VYorms\application checklist.doc ‘ /See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014CBAC.001.pdfRelated documentPublic source context ↗
07/0676 - Op Works - Timber jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.