08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

MIDDAP DITCHFIELD

ARCHITEC?

 

 

PLAGED Saris

 

 

Ww jp

   

 

1st February 2008 0634-1002
Noosa Council
PO Box 141
TEWANTIN Q 4565
“"“ATIN: NeilBlameySsSs=~<CS NS ae
Project: Multiple Housing Type 2 Duplex
15 Duke Street
SUNSHINE BEACH
Lot 201 on RP 48113
Previous ref: 2007/1045
Subject: Operational Works Application
Dear Sir,

We attach as part of a Development Permit for Operational Works, the following documents;

- FormA, Form E and Assessment Checklist
- Application Fee of $2,690.00

- Drawings

Should you require any further information or clarification on any item submitted, please contact

Kelly Martin on 5474 0877.

Yours faithfully

Kiielw

Kelly Martin

Director

MIDDAP & DITCHFIELD PTY LTD
ARCHITECTS

LAP Ey

 

 

HUG. GEC. 6OO.6U
Full text of the other 25 pages

Page 2

 

 

Development & Land Use Sections

/

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

IDAS APPLICATION

    

DEES ae

14 Form1PatA

 

1.1.1 Ensure that the form is fully completed. |

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 if there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the fand is a company, either ACN No. or Company Seal required.
1.2. Form Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [VY] :
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.

papa ne Ce

2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals.

BEST ENVIRONME! EI 3) ay
3.1. Ensure that Part G is completed if EPA referral is required.

    
   
  
 

 
 

 

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

 

 

 

Ensure that items 1- 28 have been ‘checked and/or lies ee information regarding
applicant details and owners consent.

 

Works) accompanies the application. In addition ensure that each set is complete.

 

§.1 Ensure that at least 6 sets of the Plan. of oerccenent eo for Reconfiguration and Operational | L
Y

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is
unbound.

 

 

 

and Operational Works). {f the application is accompanied by a covering letter, ensure that it is

 

capable of reproduction. [=]
6.2 In the case of reports, ensure that 1 of the copies is in an 1 A3 or A4 format and is unbound.

 

 

7.1 Ensure that the fe application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

7.2. Ensure that the fee which has been paid is recorded on the application form.

 

 

 

 

 

 

 

Receiving Officer

Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving

trays:-

« — {f the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

« ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

¢ if the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

«  Inall other circumstances — AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

SEP! g:\ant\forms\application checklist.doc

 

-MNEOLO NY We Checklist--Applications_Involving-Land——_--_——__

Page 3

s___ INTEGRATED PLANNING ACT_1997

 

   
  
 

s

 

idas)

Part A

Common details

 

{Identification of the premises the subject of the application

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

j
1. Can any part of the premises be identified by a street address or fot on plan description?
(DJ No - Answer Qt{a)
Yes - Complete Table B and answer Qt(b) and Qt(c)
Table B
O Lot on plan description
Unit | Street Official suburb Post (place each description in a separate row)
number | number Street name Aocality name code Lot Plan type Plan Local government area
number | (og RPS) | umber
18 Duke Street Sunshine Beach | 4567 201 RP 48113 Noosa Council
4(b). Can the address be further described by shop/tenancy number or storey/level?
No
(1 Yes - Complete Table C .
1(c). ts any part of the premises strategic port land under the Transport Infrastructure Act 1994?
No
(1 Yes - Complete Table D
2, Can the premises best be identified by coordinates (e.g. for development proposed in waters, oron asite within a large rural lot)?
oO =
[J Yes - Complete Table E
3. Are the premises within or adjacent to a water body or watercourse?
No
[1] Yes - Complete Table F and answer Q3{a)
4. - What is the total area of !and that makes up the premises (ie. the area covered by the application)?
Area of land above high water mark/outside watercourse Area in a water body or watercourse
611.69 [&]m? [_Jhectares (Tick applicable unit) (Jm? (hectares (Tick applicable unit)
[Existing use of the premises 7]

 

5. Are the premises currently used for any purpose?
[J Noe

[X] Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. focation
and nature of existing uses, buildings, structures and services

Part A, Version.3.0, 3. Septembes. 2007___

Page 4

INTEGRATED. PLANNING ACT 1997 - Part A. Version 3.0,3 September-2007____—
ne
“6, Are there any existing easements on the premises (e.g. for vehicular access, electricity, overland flow)?

No
(J Yes - Complete Table H and ensure the location and dimensions of each easement ere included in plans, submitted with the application

 

[Proposal details |
7. Are new uses proposed on the premises?

No
(C1 Yes - Provide details in Table |

8. Are new buildings or structures proposed to be erected on the premises?
(No

Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the
application

 

Applicant details ]
@ 9. Who is the applicant for the application?

 

 

Company/organisation name
(if applicable)

Individual contact person details

Title [Miss ‘) First name fkeily _ 1} Last name [Marin _ 4

Postal address |Cnr Thomas & Mary Street, Noosaville Q4566 |

eae. ... - _

Middap Ditchifield Architects

 

 

 

 

 

 

 

 

 

 

Contact telephone number [54740877

 

 

Mobile phone number N/A |

 

 

 

 

 

 

 

 

 

 

 

Facsimile number {54740906 oe
e-mail address [email protected] t
|Owner’s consent and resource entitlement ]
@ 10. Does the application involve a State-owned resource prescribed by schedule 10 of the /ntegrated Planning Regulation 1998 (IP Reg) or
any other regulation?
[x] No

(C1 Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement
11. Does the application involve land other than State-owned land (i.e. privately owned land) and require owner's consent?

(] No

Yes - Complete Table K and submit, with the application, written documentation of all owner's consent

Table K

 

Date written consent

Owner name/s Street address or lot on plan description was obtained

 

 

 

 

 

 

1 Bomerah (Qid Pty Ltd) 15 Duke Street, Sunshine Beach Q4567

 

Page 5

INTEGRATED. PLANNING ACT_1997.

ia

Part A;Version-3.0-3 September-2007—_—

 

‘Mandatory attachments and supporting information

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

j

 

 

 

 

 

 

 

 

 

 

Description of attachment or information Title (if applicable) ,
(e.g. Part C of Form 1, owner's consent, evidence of | (e.g. General Authority, James StreetTrafic Date Method of delvery to
resource allocation/entitlement, plans, drawings, reports) Report) assessment manager
1 Part E of Form 1 over the counter
[Portable Long Service Leave (PLSL) levy for building and construction work |

 

13. ts payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?

No - Complete and submit a QLeave Notification and Payment Form. The receipted form must be sighted by the assessment

CJ Yes - Complete Table L and submit, with the application, the ‘yellow’ (Local Govemment's (Council) / Private Certifier's) copy of

 

 

 

 

 

LJ No
Yes
13{b). Has the PLSL levy been paid?
@ manager before a development permit can be given.
the receipted QLeave Form.
OFFICE USE ONLY

Date Received | | r{ee ‘| Reference Numbers

 

 

 

FOR COMPLETION BY ASSESSMENT MANAGER

 

 

ls a QLeave Notification and Payment Form required for this application?

[x] No

(0) Yes - Complete Table M

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

To

 

 

 

Council

| have been engaged as the private certifier for the building work referred to in this application

 

 

e Date of

engagement

Accreditation number

Name

BSA Certification number

Building classification

 

 

 

 

 

 

 

 

Page 6

INTEGRATED. PLANNING. ACT_1997. Part A; Version-3.0-3- September 2007-

* Advice for completing Part A

 

General advice

le Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.

¢ — Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications,
are stated in other Parts of Form 1.

'@ The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building

Act 1975 only.

° For further information about completing this form go to [DAS Guide. 1 (Making and IDAS application)

 

ai

The premises, the subject of the application, may be identified in a number of ways. Street address and fot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or
other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA)
only. Instead complete Q1(a).

StrategicPortLand is within a local government area but a local govemment's planning scheme does not apply on Strategic Port Land.
StrategicPortLandis declared under the Transport Infrastructure Act 1994, For further information go to IDAS Guile 11 (Development
on strategic port land) and the Queensland Transport (Ports) website.

 

Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.

Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

Q3

A single development application may involve land both within and outside waters.

A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a fiver, creek or stream upstream of the point to
which high spring tide ordinarily flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a
watercourse is in the jurisdiction of the Department of Natural Resources and Water.

“Tidal water’ is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local goverhment and for strategic port land
is defined in the tPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to
high water mark at spring tides) establishes the boundary of a tidal area.

Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993.

Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic
port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for
alocal government tidal area, However, the IPA gives local governments jurisdiction for assessing and deciding applications for
prescribed tidal works within the tidal area for a local goverment, and the planning scheme may be applied to that assessment (to the
extent provided for in the code for prescribed tidal work).

 

Qs

The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 14 Application Form (including this Part and any other relevant Part) is correct.

If the applicant is a company or organisation, a contact person must be nominated.

Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

 

Q10

 

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Requiatien
Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.

Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry materia! below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark.

In the case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.

In the case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.

 

 

Page 7

im

+___ INTEGRATED. PLANNING.ACT_1997

°

 

Qi ° Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if
the application involves any of the following:
(i) a material change of use;
(ii) reconfiguration of a lot
{iii} work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management
Act 1995; or
(iv) work on rail corridor land defined under the Transport Infrastructure Act 1994.
. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the
application, entitled to receive the rent for the {and (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
° Owner's consent is not required for a mobile and temporary ERA.

 

Q12 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

 

Q13 . The Building and Construction industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in
the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service
leave. To fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of
the work, whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for
calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in
the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy.

« The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act} defines the building and construction
industry for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining
or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

. ¢ The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a
development permit for certain building or operational work. The assessment manager must sight an approved form issued by
QLeave advising of the status of the payment of the levy.

Building and Construction Industry Notification and Payment Forms are available from anyQueensiandpost office or agency, on
request from QLeave, or can be completed on the QLeave website at www.dleave.qld.gov.au

For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave,qid.gov.au )

Part-A.Version-3.0;3-September- 2007-————

 

 

Privacy Statement
The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in
accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside
of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as required
by Parliament. This information may be stored in a Department of Local Government, Planning, Sport and Recreation database. The
information collected will be retained as required by the Public Records Act 2002. For further information on your privacy, contact the

 

Privacy Contact Officer forthe Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.

 

 

 

 

 

 

Proposal ID

 

 

 

 

   

Click here to submit your DA

Page 8

 

Noosa Council
PO Box 141...
TEWANTIN Q 4565

PROJECT: NEW DUPLEX
15 DUKE STREET, SUNSHINE BEACH

SUBJECT: LETTER OF CONSENT
Dear Sir/ Madam;

We hereby give consent for Middap Ditchfield Architects to act as Applicant for any approvals
required by Council during the Building Approval process of the above property.

(Print Name) (Signature)

Owners: Romaveth .@- A

 

Page 9

Part E, Version 3.0,3.September-2007

  

 
  

Form 1 Development Application

Part E

Building &/or operational works assessable against a planning scheme

 
  

1. Isthe application seeking approval of building work assessable against the focal government planning scheme?

No
[I Yes

2. Is the application seeking approval of operational work assessable against a planning scheme?

® 1] No
Yes
2(a) _ Is the application seeking approval for more that one type of operational work?
(1) _No- Complete Table 8

Yes - Complete a new Table 8 for each type of operational work

 

Table B
(i) Whatis the nature of the operational work?
‘ {[] Roadworks (J Stormwater [1 Water infrastructure [F Sewerage infrastructure
[J] Landscaping (7) Clearing vegetation under the planning scheme Earthworks

(21 Drainage Works Other - Specify below
Landscaping, carparking & access, frontage works, stormwater drainage, site civil works & erosion & sediment contro!

 

 

 

 

(ii) ts the application for operational work involving the creation of new lots?

. No
6 [51 Yes - Specify number below

(iii) What type of approval is being sought?
(7 Preliminary approval
Development Permit

(iv) Is there a current Preliminary Approval for this operational work on the premises?

No
(11 Yes - Complete Table B(a)

(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

LJ No
Yes - Complete Table B(b)

Table Bib)

 

BE © 8! 61 epproval references [[0aie approved Jj | Date approval lapses

1 2007/1045 31-Oct-2007 31-Oct-2011

 

 

 

 

 

 

 

 

Page 10

INTEGRATED PLANNING ACT 1997

Part E,Version.3.0,3.September-2007-

 

3. . Confirm that the following mandatory information accompanies this application

‘Mandatory Information

 

 

 

 

 

Confirmation of § | ====teee
\Sdgement Method of lodgement
Pians showing the nature and location of the proposed works (inctuding the extent of any cut and fil) Confirmed

 

 

OFFICE USE ONLY

 

 

 

Date Received Reference Numbers

 

 

 

 

Page 11

 

2. INTEGRATED.PLANNING ACT 1997. IDAS-Assessment Checklist, Version 21.0, 3 September 2007

   
 
   

Form 1 Development Application

IDAS

Assessment Checklist

 

IDAS Development Application Form 4 is the approved form for all development applications under the Integrated Planning Act
1997.. Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications. The
relevance of other Parts of Form 1 depends on the nature of the application.

Form 1 also includes the IDAS Assessment Chechlist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.

Section 1 and all other relevant sections ofthe IDAS Assessment Checklist must be completed for all development applications

except those for building work requiring assessment against the Building Act 1975 only. For more advice refer to Part B of the
; IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

{f unsure, phone or visit your local goverment or log on to the IPA website for help.

Does the application seek approval to materially change use of the premises?

 

 

 

 

H¥yes - complete Section 2 of this checklist DiYes |[INo
Does the application seek approval to reconfigure a lot?
If yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1 OYes |{X]No

Assessment is by the local government

Does the application seek approval to carry out operational work?
fyes - complete Section 4 of this checklist Bx} Yes |[]No

 

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?

if yes - complete Section 5 of this checklist .

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme?

if yes - complete Part E of IDAS Application Form 1 fal Yes |[JNo
Assessment is by the local goverment

(Yes /[]No

 

 

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1 [Yes |{)]No
Assessment is by a building certifier

 

 

 

 

 

 

 

SECTION 1 section 1 must be completed for aft applications that require completion of the IDAS Assessment Checklist

 

 

 

HERITAGE |
11 Is any part of the proposal intended to be carried out on a registered place under the Queensland Hentage Act 1992?

No

CO Yes

IPA, schedule 8, part 1, table 5, item 2
JP Regulation, schedule 2, table 2, item 18
IPA, section 1.3.5 (Definitions for terms used in development)

 

[REMOVING QUARRY MATERIAL; WILD RIVER AREA ]

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 20007

No ‘
C] Yes

Page 12

-i—

INTEGRATED. PLANNING ACT 1997. DAS-Assessment Checklist; Version 21.0; 3 September 2007

IPA, schedule 8, part 1, table 5, item 1

IP Regulation, schedule 2, table 2, item 17

IP Regulation, schedule 1, table 5, item 2 (wild river area)
Water Act 2000, section 966C

Wild Rivers Act 2005, section 43A

 

 

 

‘ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA i
13 Does the proposal invoive an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No

[] Yes

IPA, schedule 8, part 1, table 2, itern 1
IPA, schedule 8, part 1, table 5, tems 3 and 4

JP Regulation, schedule 2, table 2, items 1 and 23

Environmental Protection Act 1994, section 73AA (wild river area)
Wild Rivers Act 2005, section 434

 

 

 

 

(WITHIN THE LIMITS OF A PORT |
414 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

No

[1 Yes

IP Regulation, schedule 2, table 2, items 15 and 16
IDECLARED FISH HABITAT AREA |
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

No

([]_ Yes - ifanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, item 26
|COMMUNITY INFRASTRUCTURE |

1.6 ts any part of the premises designated for community infrastructure?

[Xx] No
(1 Yes

IP Regulation, schedule 2, table 3, tem 7

 

 

IWASTE WATER MANAGEMENT ]

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

No
(] Yes

IP Regutation, schedule 2, table 3, item 5

 

 

on seeks app ‘operational Work '
PLANNING SCHEME |

 

 

44 Is any of the proposed operational work assessable under a planning scheme?
oO No - Go to Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

 

 

ISTATE-CONTROLLED ROAD }
4.1.1 ts any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No

(1 Yes

Page 13

 

__.__,, INTEGRATED. PLANNING ACT1897 IDAS Assessment Checklist Version 21.0, 3 September 2007

If no, is the proposed operational work listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed
the threshold?

No
(C1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation, schedule 2, table 3, item 3
IP Reguiation, schedule 2, table 3, item 1{b)

 

[ACID SULFATE SOILS

4.1.2 Is any of the operational work proposed in a local govemment area listed? in State Planning Policy 2/02: Planning and
Managing Development Involving Acid Sulfate Soils?

No
1 Yes
Spurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentarta, Cook, Cooloota, Douglas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Reddiiffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

IP Regulation, schedule 2, table 3, item 4
State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Soils, section 3.6
e [EASEMENTS AND SUBSTATIONS ]

4.1.3 Is any of the proposed operational work for filling or excavation?

O No
[x] Yes

If yes, is the filling and excavation associated with reconfiguring a lot?

CO Yes
No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or tansmission entity under
the Electricity Act 1994?
No
C] Yes
(b) 1s any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
No

C1 Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2. table 3 item 10{a)
e@ JP Regulation, schedule 2, table 3, item 10(b)

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No
[1 Yes

IP Regutation, schedule 2, table 3, item 17
[PUBLIC PASSENGER TRANSPORT ]

4.1.5 {s any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No
(1 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Reguiation, schedule 2, table 3, tem 14 .

 

 

 

|RAILWAY SAFETY AND EFFICENCY |
4.1.6 's any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No

[1 _ Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15

Page 14

INTEGRATED. PLANNING .ACT1997. IDAS “Assessment Checklist, Version 21.0, 3 September 2007

 

 

 

|KOALA CONSERVATION }
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area?

No

0 Yes

IP Regulation, schedule 2, table 3, item 19

 

WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industria!
development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers

code to that type of development.

 

 

 

 

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA
4.2 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?

@ [X] No
(Yes

IPA, schedule 8, part 1, table 4, item 2

IP Regulation, schedule 1, part 2, table 5, item 1(c)

Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area)

 

 

 

 

‘VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA |

43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

[X] No
LI Yes

IPA, schedule 8, part 1, table 4, items 1A-1G

IP Regulation, schedule 2, table 2, tem 5 (vegetation clearing)

IP Regulation, schedule 2, table 2, item 34 (koala conservation)

JP Regulation, schedule 1, part 3, table 4, item (vegetation clearing/wild river area)
Vegetation Management Act 1999, section 22A (vegetation clearing/wild river area)
Wild Rivers Act 2005, sections 31F and 43A

e (TAKING OR INTERFERING WITH WATER; WILD RIVER AREA |

 

44 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a
watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a
watercourse?

No
(1 Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRWis not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency

IPA, schedule 8, part 1, table 4, iterns 3(a)

IP Regulation, schedule 2, table 2, item &

IP Regulation, schedule 1, part 3, table 4, items 3 and 3A
Water Act 2000, section 966A (wild river area)

Wild Rivers Act 2005, section 43A

45 {s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?

No
[1 Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRWis
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3(b)

JP Regulation, schedule 2, fable 2, item &

IP Regulation, schedule 1, part 3, table 4, item 3

Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)

Page 15

 

JNTEGRATED.PLANNING ACT_1997 IDAS Assesament Checkfist, Version 21.0, 3 September 2007

46 Is any of the proposed operational work to allow, under the Wafer Act 2000, for taking overland flow water?

No
(1 Yes - Answer (a) and (b) below

eda

IPA, schedule 8. part 1, fable 4, item 3(c}()

IP Regulation, schedule 2, table 2, item 8

IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)
Wild Rivers Act 2005, section 434

47 \s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

[x] No
LD Yes

IPA, schedule 8, part 1, table 4, tem (chi)

IP Regulation, schedule 2, table 2, item 8

IP Regulation, schedule 1, part 3, table 4, item 3

Water Act 2000, section 966A (wid river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code dees not currently contain applicable provisions for sub artesian water)

48 Is any of the proposed operational work to allow, under the Wafer Act 2000, for interfering with overland flow water?
No
@ (1 Yes - Answer both (a) and (b) below

IPA, schedule 8, part 1, table 4, items 3{c}{j) and 3{d}
IP Regulation, schedule 2, table 2, item 9

IP Regulation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 9668 {wild river area)

49 |s the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 O No UD Yes
© To increase the storage capacity of a referable dam by more than 10% 0 No 0 Yes

if yes to elther or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 4
IP Regulation, schedule 2, table 2, item 10

 

(TIDAL WORK; WILD RIVER AREA

 

4.10 ls any of the proposed operational work tidal werk, other than excluded work defined under the IPA?

e .
(C1 Yes - Answer (a) and (b) befow

IPA, schedule 8, part f, table 4, tem5

IP Regulation, schedule 2, table 2, tens 12, 14 end 17

iP Regulation, schedule 1, part 3, table 4, items 4A and 5

Coastal Protection and Management Act 1995, section 104A (wild river area)

 

 

ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |
44 {s any of the operational work proposed to be carried out within a coastal management district?

No

LJ Yes

IPA, schedule 8, part 1, table 4, item 5

IP Regulation, schedule 2, table 2, items 12 and 14

IP Regulation, schedule 1, part 3, table 4, tems 4A and 5

Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area)
Wild Rivers Act 2005, section 43A

 

 

WATERWAY BARRIER WORKS; WILD RIVER AREA |
4.12 \s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No

C Yes

Page 16

ty
y

 

INTEGRATED. PLANNING. ACT1997. IDAS Assesament Checklist, Version 21.0, 3 September 2007

IPA, schedule 8, part 1, table 4, item 6

IPA, schedule 8, part 2, table 4, item 2

IP Reguiation, schedule 2, table 2, item 28

IP Regulation, schedule 1, part 3, table 4, tem 6
Fisheries Act 1994, section 76D (wild river area)
Wild Rivers Act 2005, section 43A

 

DECLARED FISH HABITAT AREA; WILD RIVER AREA

413 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?

No
C1 Yes

IPA, schedule 8, part 1, table 4, item 7

IPA, schedule 8, part 2, table 4, tem 3

IP Regulation, schedule 2, table 2, item 25

IP Regulation, schedule 1, part 3, table 4, item 7
Wild Rivers Act 2005, sections 43A

Fisheries Act, section 760C (wild river area)

 

IREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER [email protected] Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

1 No
C1 Yes

IPA, schedule 8, part 1, table 4, item 8

IPA, schedule 8, part 2, table 4, item 4

IP Regulation, schedule 2, table 2, item 29

IP Regutation, schedule t, part 3, table 4, item 8
Fisheries Act 1994, section 76DA (wild river area)
Wild Rivers Act 2005, section 43A

 

 

[WILD RIVER AREA J}
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

><] No

CI] Yes

IPA, schedule 8, part 1, table 4, item 10
IP Regulation, schedule 2, fable 2, Kem 37
Wild Rivers Act 2005, sections 42, 43A

 

 

[STATE-CONTROLLED ROAD |
e 4.16 ts any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No
( Yes

IP Regutation, schedule 2, table 2, item 3

 

Disclaimer:

While the Department of Local Goverment, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DLGPSR expressly disclaims all liability (including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form

 

 

 

Page 17

 

. INTEGRATED.PLANNING ACT1997. IDAS Assessment Checklist, Version 21.0, 3 September 2007

——___—-+-«——

 

 

 

 

 

 

Proposal ID

 

 

   

 

Click here to submit your DA

 

Page 18

+

 

 

 

CL SPRAYED RC FACING TO
{UPPER SLOPE” TO” STABILISE

 

|
|
|

 

EMBANKMENT, REFER DETAIL.

5 50
titi t

332259".

1.589

ee LTTE LT |
PliTI tl

[ffl

L Pigs Sy zt yy

Revision

Description Date

 

 

NO. ANCHORING-INTO:
NEIGHBOURING ALLOTMENTS,

 

BLOCK RETAINING WALL, REFER DETAIL.

42°58'20"
40.730

_ RP BOUNDARY

 

 

 

/

SLT—

 

 

 

 

 

 

 

      

 

 

            

EIALL LALLA

i|

!

 

S

SATURATE GROUND ADJACENT
EXCAVATION FOR A MINIMUM OF
24 HOURS PRIGR TO WORKS
COMMENCING,

 

           

THIS FOOTING (S FOUNDED GELOW CRITICAL:
DEPTH UNE AND IS STABLE,

PIERS OR UNDERPINNING FOUNDED BELOW THE
CRINCAL DEPTH LINE WOULD BE NEEDED 10
‘SUPPORT ANY FOOTING THAT IS FOUNDED
AGOVE THE CRITICAL DEPTH UNE.

CRITICAL_DEPTH LINE

‘CONCRETE FACING
/- S172 MESH MIDOLE

|
{
|
a + oni TRENCH,
'

  

 

 

 

 

 

 

 

vos
ope ,
“oe
hb’ sy fos
Nf fle Z Ze

4 . 4

 

REFERHYDRAUUCS/” 7” |.”
CONSULTANTS DOCUMENTATION’
FOR SITE DRANAGE DETAILS |

“Lf
Sof ft 4 fie

4 4 4 4
oof 4 4

“_AEXBING
DEMOMSHED # REMOVED,“

Co% 4 4 yoo4

 

 

 

y 7

       

“ 4 4 4 4

4 4 Z 4 y
house to BE”
YD)

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

{ENSTING STRUCTURE /OWELLING INCLUDING
NEIGHBOURING ALLOTMENTS

 

THE BUILDER /CONTRACTOR SHALL
CONFIRM ALL RELEVANT LEVELS
PRIOR TO COMMENCING WORKS.

 

 

 

THIS FOOTING WITHOUT PIERS IS FOUNDED:
‘ABOVE CRITICAL OEPTH UNE AND IS UNSTABLE.

UNE OF PROPOSED EXCAVATION EXCAVATION OR

NOTE:
THS DETAIL ALSO APPLES TO EXISTING
FOUNDATIONS ON NEIGHBOURING PROPERTIES.
SHEET PILING MUST BE INSTALLED WHERE
EASTING FOOTINGS WILL BE FOUNDED ABOVE
ANY EXCAVATION CRITICAL DEPTH UNE

    

      

 

4500 RC PIERS 6/NI6
FULL HT R8 SPIRAL 300
PITCH, SO COVER

 

 

IZ 400 centre,

 

 

 

fy ‘Longthaing
Pe rearcerent N12 0
; cro

SAE2 Mesh top 40
cover,

 

 

 

 

 

 

{
t 4 Z 4 s Z 7 Z ,
Bei 8 OS ig! “ys
S | pun ML pecs nnnncn nen nncmnnensrrrnnreg
BU et POEL IMLS ELEN
*| a: vv on ' / mo /|\ :
7 if ee een pence ene tenemos ‘eat — . ¢ (i
ITITTTTTT TT be at o . CREATE BUNOING IN
| | o te aA 1 TEMPORARY HARDSTAND) /
[en ey all “tt ut! LI) Eee" /
2g
GIT TT IT TTT tpt t+ t eer - STN ~ Spe pounoary 40538 (Ny - - > re
BLOCK RETAINING WALL, REFER DETAIL es 1,
AUGERED CONCRETE PILE WALL AND ANCHORED OPERATIONAL WORKS PLAN 4
CAPPING BEAM FOR SOWL RETAENTION, REFER Seale 1: 100
SECTION FOR DETALS, wc caren aca
a FULL LGTH OF WALL ROWE wnat
AONTS AT 6.0m CTRS.
SPRAYED 25NPo 900(W) GEO-FABRIC SILT

         

FENCE, FIXED TO SPIKES
AND BURIED 300 INTO
‘STABLE “GROUND.

1200(L) 50 Sq. HOWD
SPIKES, 1800 ctrs DRIVE
600 INTO GROUND.

i
SILT RENTENTION: FENCE DETAIL

Noturol Ground j

‘SILT RETENTION.
THE CONTRACTOR iS TO INSTALL APPROVED SLT RETENTION

 

 

 

 

 

 

 

 

1490

BSR RIC

 

2
i
5
:
z

OF SURFACE BUNDING OR SCOUR PROTECTED
THE FENCE MUST REMAIN IN PLACE UNTIL SUCH

 

 

 

 

B - Bose Width

 

10mm Joint, mastic. Besser control

(A if wall rendered, rt blocks.

 

Vertical bars, (size on
pln) in grout filed "tt

both sides of joint.

MOVEMENT JOINT DETAIL,

TYPICAL SECTION ~ RETAINING WALL

THAT FINISHED LANDSCAPING AND DRAINAGE MEASURES,
ONSTALED 5

LEGEND

 

LEVEL TO AHD.

zt
SILT RETENTION FENCE. TO DETAIL

i .

{fm INDICATES PROPOSED FINISHED SPOT
SURFACE LEVELS TO AHD..

%

< i

+” EXISTING SURFACE SPOT LEVELS.

{

CONTOUR AND

su

 

 

 

 

 

 

 

ORIVEWAY CROSS OVER DETAILS}
TO BE IN ACCORDANCE WITH

NOOSA SHIRE COUNCIL'S $ID
ORAWNGS 9005 & 9019.

 

20-40mm AGGREGATE
HARD STAND OVERLAY
FOR DEUVERY'S OURING
CONSTRUCTION,

EXISTING DRIVE WAY TO BE REMOVED.
NEW KERB AND CHANNELLING 10 8E

REINSTATED TO NOOSA SHIRE COUNCIL|
REQUIREMENTS,

 

CONSTRUCTION NOTES.

GENERAL:

4. Do nat sede from this drawing.

2. A dimensions in milimetres

3. Setting cut dimensions ore to be obtained from the archi
drawings.

4. Any discreponcies between these drawing and the architectural drawings
are to be retored to the engheer immediately

5. The builder is respotsibe for locating ofl existing services within ond
adjocent the allotment and shall ensure that aif new works ore in
accordance with the attached critied depth fine diagram,

FOOTPATHS AND DRIVEWAYS:

1, Existing foatpaths to be saw cut prior to removal

2. Crossings are mot designed for commerciol vehicles

3. Concrete driveway to be 125mm thk. excluding any finished treatments,
69. stomping

4. Concrete surface tolerance +5.0rmm_over 3.0m

5. Conarete N25 in occordonce with AS 1379 ond AS 3600

8. Reinforcement fabric to AS 1304, placed central ob depth,

7, Expansion jpints to be 10mm wide wet tooled vith every 2nd mesh wire
cut dong joint,

8. One access point permitted for each afotment

 

ture

 

 

9. For curved driveways, maxenum grades apply to inside edge of curve
10, All services to be located and protected ax required prior to work

 

 

SCG enema NS ENGINEERS

ABN 40 098 481 899

©

 

'ssue: TENDER ~ NOT FOR CONST.
18 DUKE STREET SUNSHINE SEACH QLD.4567

DESMO TK
Ph (07) 5447 5544 Fax (07)5447 2634

 

Title: OPERATIONAL WORKS & DRAINAGE.

 

Project 15 Duke Street,
Sunshine Beach QLD 4567

 

 

Date: Jan 2008 Drg No. 17273-OW1

 

 

 

 

Page 19

 

 

 

 

 

=a

fs
rl

I

T1398

@:
|

WI

——

 

 

HLTH

 

 

dani
peel yp

  

 

--——-——

 

 

 

: jas
REFER HYDRAULICS *
CONSULTANTS DOCUMENTATION} > — - —— -
FOR SITE DRAINAGE DETAILS

 

 

 

  

ii iiiltl

4 /
iil

 

| 0 ra

/
hel

HEEL a

PLE

 

 

 

 

 

 

 

 

 

 

 

 

Fae

 

 

 

 

 

 

 

  

 

 

 

 

VISITO

 

 

FRevistor| i mt Date
4 48 46 4 rm 42°3820" : 43 HT
af Les wifi i - } iY fey : ae 4 , . 40730 RP BOUNDARY a ag tT]
ald [| Ore Aff OO “]
oO IIL caeoer OF fe 77 ( |
PTET EG ST Foy

     

 

            

GROSS eau

 

 

    

 

 

 

 

 

   

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

              

 

 

 

   

 

 

 

      
    

ORIVEWAY CROSS OVER DETAIL!
JO BE IN ACCORDANCE WITH
NOOSA SHIRE COUNCIL'S STD
DRAWINGS 9005 & 9019,

 

EXISTING DRIVE WAY TO BE REMOVED.
NEW KERB AND CHANNELUNG TO BE
REINSTATED TO NOOSA SHIRE COUNCIL
REQUIREMENTS

      

 

 

 

 

   

 

 

 

 

 

 

 

 

 

  

 

 

~ LAY_BACK KERB & CHANNEL
4a

 

 

 

 

 

\ TRAP 10 HYDRAULIC)
[flit iiepiel PARKIN me ora nthe
- - = = - ~ a - - _ ~ - - J -. = - GENERAL:
{ he LT TTTT Tt |- a I Ir t | 40.535 ~~ 1, Do not scale from this dosing
O80 4g 48 . “4 RP BOUNDARY ‘pean 43 ; 2. AN dimensions fv ilfetres
. : 125 Thick ~™ 4. Setting cut dimensions are to be abtoined from the architectural drawings.
* PARK WAY PLA . driveway sab. PROVIDE KERB ADAPTOR ‘ ey Geogr be the og ad te ecard drain
t to be ref mi
Scale 1: 100 B WALL WIDTH DIMENSION (m) TONS. SPEGRICATION 2 Tae eae ts mening feng erveea stn on alo
0 1 2 3 35 - 4 tha aotment and shot! engura that of new works ore in occondence wih the |
Y ‘ attached critica depth line diagrom,
IF THE SLOPE IS ~ 1 FOOTPATHS AND DRIVEWAYS:
GREATER THAN 10:1 p Cut every 2nd 1. Existing footpaths to be sow cut prior to removd
SEE NOTE 2. wire along line 2. Crossings are not designed for commercial vehicles
Ground Level of pint, a Concrete drivency to be 125mm thk. exchiding ary fished treatments, eg.
[— Tu) TOOLED JOINT DETAI ‘Cotte ssc lene 450m, oe” 0
5, Concrete N25 in accordance with AS 1379 and AS. 3600
. a 6, Reinforcement fabric to AS 1304, placed central stab depth.
€& Grated ‘ 7. Exponsion joints to be 10mm wide wet tooled xith every 2nd mesh wire cut
= ; along joint
Kb ain [9 Is 8 fe IR 3 fa. & One access point permitted for eoch olotment.
= g st BY gi sl ¢ 8 t 9, For carved driveways, maximum grades apply to inside edge of curve
1 Ss | } 10. All services to be located and protected 3 required prior to work
@ i | cavetenng
t | ¥
\lA z = = d ‘LEGEND
= “ ~ ee = : a i _ = 777 INDICATES EXISTING SURFACE
; x. 2 i 19.09 CONTOUR AND LEVEL TO AHD.
x= E 3 fq ~—s INDICATES PROPOSED FINISHED SPOT
ROCK SIZE REFER a g SURFACE LEVELS TO AHD.
Kk To NOTES. | te fm) (25 TAK. DRIVEWAY SLAB ON
an t Crossover Detod Abgve COMPACTED MATERIAL, SL82 MESH, TOP
WALL’ DESIGN CHART ana | 40 COVER, FLEXIBLE JOINT AGAINST
FINISHED GL Rt 32.00 I \. MASONRY /CONCRE TE.
" wore: DRIVE WAY LONGITUDINAL SECTION toy bast Kee Tul DENOTES WET TOOLED JOINT TO TERRACE
‘oundation to be approved for a safe bearing copacity of ———e—eE—eE—E—E—E—e—=E—E— ‘an | SLAB, REFER T T N WING $2
100 kPa prior to construct a EXISTING. MATCH EXISTING . , stoners LAB, REFER TO DETALS ON DRA ‘Ty
. 2. Where the surface slope ined material is between 101 3 CROSS FALL CROSS FALL 4 I ~
(| & 4:1 the wall base dimension is to be increased by 0:5 q nate 8 150 Ssue: TENDER ~ NOT FOR CONST.
meters. ; I
— . | 3. Rock is to be sound and durable and ot least 0.5 square | r | Extend CONSULTING ENGINEERS ¢
. : metres in plan area; b SCG = Pitt « ‘i
200mm FREE ORAINING 4, Bock fill is to be granular, free draining and compacted ond bel SE sirwciral cil geateciecal
BACKFILL WITH GEO FABRIC 100 KEYED INTO ROCK @ minimum of 300mm wide; . é Z back of
WRAPPING AG PIPE 450 KEYED INTO SOIL 5. A continuous 100mm diameter subsoil droin wrapped in determined on=site. kerb. 18 DUKE STREET SUNSHINE BEACH QLD.4567 -
TO cPTs. B geotextile is to be installed at the rear of the wall; Saw cut ond 4 * Cempocted Ph (07) 5447 5544 Fax (07) 5447 2634
— 6, Rocks shall be placed in such o manner that they are stoble breakout BARREER, SEMT-MOUNTABLE, MOUNTABLE snd bed PAVEMENT WATERIALS Sudgrade
and interlocking & laid roughly coursed ond embedded on’ their Dock of erp KERB 4 CHARMEL OR VERT CROSSE Bsa Asphalic Surfacing to NSC specications PRI. =| Title. §—s CAR PARKING & DRIVE WAY PLAN
150 THK C20 broadest base, , . | ; . / 150 Bose course type 21 CBR 80 rel er gener
CONCRETE. BED BASE. 7. Where the width nominated is made up with o series of CROSSOVER DETAI 150 Sub-bose course type 2.5 CBR 45 /, Project 15 Duke Street,
. . rocks, rocks should be concrete routed together to ensure (Sedte 1:20) ‘Sub-grade preperation in accordance with specifications /notes Sunshine Beach QLD 4567
5 ; intertocking can occur. .
‘ TYPICAL ROCK WALL GEOMETRY , $

Date: Jan 2008 Drg No, 17273-OW2

 

 

 

 

 

\
}

Page 20

Sewer

Q Top 44.32

.

%, 4323

 

 

                      

 

 

 

 

 

4 8
O p.
‘ S, G TEM
: \ xa ie Ramiset In Kerb
x on =) CONTOUR & Nee RL 42,597 AHD
Lor 1109 a . 25}
Sone DETAIL PLAN 202.— eC \ PN > at
3108-01 on RP48113 Pra a S299 . Sm, & N
SCALE 1: 100 LOT 201 j % dH
De aceinteeny CTC (Fomor) On RPABIAS
== 2 — Gonroun a eta Pun 15 0UN@ sreeeT
Steck am ‘SUNSHINE BEACH
ie org por 8
. Parsh WEYBA
County March

 

Locality: TOWN OF
‘SUNSHINE GEACH

 

 

 

  

Existing hous

  

to be 2 427
demolished conee
Top 42.26
4052 e
/ £ a .
Cee s 200 .
RP48113 ‘
4

»
as

yi :

TBR ;

Ls Trp DECK _ >
<7 G20eH FFLA4,29 -

       

Us fo

   
   

          

‘3 Trees,
7 agin i
« fst . .
TAR White Masonry “4 A 34.01.08 OP Warks Application
DECK FPL 44.31 * TSSUE__ DATE DETAR
joct duner
FFL 47.08 ! ng crvtdy werk Oba edn Do lta of evar,
Patan Gooey to acted belo commen oh.
. Ths ea bebe cop and cathe prea ne
fo. arn gb ay i a wen etn
f MODAP DITCHFIELD ARCHTECTS.
Architects .
MIDDAP DITCHFIELD Pty Ltd
Tree Architect Reg. No,- P Middap - 001850. T Dichfeld- 002195
. 0.20 10H : : abn. 49 064 466 708
184 Coe Mary anc Thomas Streets
, 4
Highset . ; NOOSAVILLE QLD 4568
Fibro & RP48113 Ph -{07) $474 0877 Fax - (07) 474.0008
Timber

Emat - [email protected]
CLIENT

BOMERAH (QLD PTY LTD)
PROJECT

PROPOSED DUPLEX
LOCATION

15 Duke Street

SUNSHINE BEACH QLO

: DRAWING .
j . Working Drawings

Residence:

Ground Level 57.6
First floor 60.20

Existing Survey Plan
scale — date raw
] 1200 - -

Proj 0.

Ovg 0.
0724 WD 001-A

 

 

Page 21

 
          

   
 

 

 

 

 

 

   

 

 

 

 

        

 

  

 

  

 

   

 

 

 

 

 

 

 

 

  

 

| | . .
¢ \
- \
| A ' ” \,
1 fo Signage {0 vehicle | “ \
| Woe) manoeuvitig area : 1” \
.
1 2mbigh fence to Boundary | ; ae oNe | \
| Landscaped Rock Retaining Wall Conerete block retajning wall Adjacent Building outine “4 ‘ \
’ .
1 | Awning outline over 2m high fence to e650 \
pe Pe Be BM Boundary ‘
-—-—-—-— 4 a = 425827 \
' = f TEFSE , i,
E a a yo New 1.5m wide. \
: qe \
we | - t ws 1 Cone. Footpath . .
--" kL 16m Boundary Setback Line. _' 3° ; ‘
tt < OO Line of new 2m \
sITA Ce ying Boundary Setback Line. L — high fence .
U mt |” . see ne : = 1— Line of new 2m \
Tres Rt 300 Outline of Building over ’ BIB high tence \
Tank & Pool Equip. / 218 No permanent sight

 

 

obstruction within shaded
area, (Refer AS2890,1
Section 3.2.4) *

 

‘Tuming Circle to

 

 

\

  

New Crossover

 

 

 

yc reer eS nae) tio |e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PAN
~ Wwosey/
\
\
i ’
Outline of e ‘
i \ tu ‘
Building over . \
‘ uy \
no OF ’
3 } K
”o--s b
ee eer
yo & Pool Equi ESky
nk ool Equip. .
=
Rain Water Outline of exigtin, > \
Crossover |! Q\
. \
Letterboxs |”. ‘
Line of new Pm No permanent sight
high fence 7°" obstruction within shaded
: area, (Reféy AS2890.1
e@ te “ Section 3.2.4)
: ‘2m high fence to tS , : \

  

Landscaped Rock Retaining Wall

Boundary
2m high fence to Boundary

    

y B —31,01.08 OP Works Application

 

' , ‘Architects

'  MIDDAP DITCHFIELD Pty Ltd
r Architect Reg. No. « P Middap - 001850. T Ditchfleld - 002195
a.bin. 49 064 466 708

Cor Mary and Thomas Streets

NOOSAVILLE QLD 4566

Ph (07) $474 GOT? Fax (97) 5474 0906

Emall - deskgn)madarc.com.av

CLIENT

BOMERAH (QLD PTY LTD)

PROJECT

PROPOSED DUPLEX

LOCATION

15 Duke Street

SUNSHINE BEACH QLD

DRAWING

r ; Working Drawings

Operational Works Site Plan

] ‘ae dae raw
q 4:100 DecO7 KM & BM

Prol no. Dwg no.

0724 WD 100-B

=>

 

 

 

Page 22

4

all BIA Rev

10 DIA Tes | ACR.

 

r— ZMyo eff

Provide. wire. Amber fretlis

 

| foe chiimaber. cand fences
BTEC iL
3 Aus dol---—

450 sq, precast cone: pavers
2. BAN int

ump

 

Bc

 

 

 

 

  
 
 

 

 

   

 

 

 

 

 

 

      

 

 

    

 

   

 

 

 

 

   

 

   

 

 

 

 

 

 

 

  

      

 

 

 

 

 

 

 

 

 

 

   

 

 

       

 

 

 

 

     

 

 

 

 

 

18 DIA kw
ee i Et It AUS dol 5 5¥2. Bus
ISLOM bys Af pee 2 Eta ret . ak | c edge
' | - y_ wo —= * Dry Creek Bed
/ . Xoo Ry yep oe Ps =H +. me yf te tot eee ee oe TY
3 AS Gb — Wy pater oh S 3 5) FR Fy, + (Sie. notes)
- fi <4 vee ee ‘. pms ee
ACK imp f/f a eh ie tet a feC be - f 2 ELA vet
4 ov acu. j “4 r ‘ | eck ret walls ' 7 + 6 DIA ks
BAC cit. : ,
|. __. J, MYO par
akin fla ! +2 BAN Ro Hl Zo¥ fens
PAN JAS — :
( secamble. over téist- ky) A 2 CR | . é
. “ff PROROSED DUPLEX * Ww
2. BAN iat- Wi
YZ
+ : 7 par nod: DRAVEnIAY b
[3 DIA Rew ‘ 1 4
‘ , : 4 DIB Te 60 34 precast Canc.
10 BAN Rol 7 " ss paver’ £0 keHerbex ‘
; ="
G Myo par a [fF +} D>.
a Lo eet yf 4 + Viste ST
ye a, t AVEIRO RI Re a po ; PARK ING | ~~ 3 Zoy ten
. x x . . 7 T t ~ . J
Wocccbe I : qi fo 5 DIA BS
St) fa et ee eee t Tee Sl )
| | L . L : | | a Conhinvous &xrvededl
| 72 TEC hut 2s dul 10 Fer adv 3 GRE they i | Lan pew Concee te, opicden
keep dotouthned arcas clear | 2 BAN iat L ELA ret te pia Ses LG GRE seam 12. DIA Fes eager Co four as
larctin fo provide access | . | : selected oy Builder ,
maintenance. Forde © Picks Com 7450 sey precast Conc. pavers jo sve. Bas th BIA Rev | doe pay ned
mulchs a5 for planttel areas . L-2 myo ett : Prosiler wire o Amber prellis 5 Aus Blu Lo Ls ane 6
for dicnbers ov fences of 4 ;

PLANTING PLAN

 

 

 

 

 

  
  

Winter & Co.
PrY UID
‘Building & Landscope Architecture

libby Winter

_ in 0417 007 394
t 07 $447 5810
f 07 5447 2369

PO Box 380
Noosa Heods O 4567

 

 

 

Lh 7
CIENT: Bomerahs(@id PIL)

- PROJECT:

_ Proposed Duplex
LOCATION:
1S Duke. shee
SUNSHINE BEACH
DRAWING:
Planheg Plan/

DATE: Dec oF See: j:100

Page 23

DEWPLEX LANDSCAPE
15 Duke Street, Sunshine Beach

CODE

ANI Big
CRI pen
DIA Jes
DIA Kin
DIA Rev
PEN adv

MYO eli
MYO par
PAN jas
PHY nod

TEC hil

ZOY ten

BOTANICAL NAME

TUFTED PLANTS

ANIGOZANTHUS ‘Big Red’

CRINUM pendunculatum

DIANELLA ‘Little Jess'

DIANELLA ‘King Alfred’

DIANELLA ‘Little Rev’ .
PENNISETUM advena ‘Purple Fountain’ dwarf

GROUNDCOVERS & CLIMBERS
MYOPORUM ellipticum
MYOPORUM parvifolium
PANDOREA jasminoides

PHYLA nodiflora

TECOMANTHE hillii

ZOYSIA tenuifolia

COMMON NAME

Kangaroo Paw

River Lily

Flax Lily

Flax Lily

Flax Lily

Purple Fountain Grass

Coastal Myoporum
Creeping Boobiaila
Bower of Beauty

. Condamine Couch

Fraser Island Creeper
Korean Lawn Grass

Plant Schedule

QUANTITY CONTAINER

wo

53
18
43
20

148

12
21

60
103

Dec-07

140mm

140mm
Vireo Tube
Viro Tube
Viro Tube

Viro Tube

140mm
140mm
140mm
140mm
140mm
140mm

 

Page 24

ow

yee @

” ,» GENERAL NOTES

PLANTS

Plants to be ordered in advance from reputable source/s to
ensure availability.

Plants to be well-formed, hardened-off stock, well-branched &
foliated, true to type. ‘

Root system to be sturdily established in container with no
large roots extending. :

Form & habit to be normal for species scheduled & pruning
scars to be clean cut.

Leaves to be of normal shape, colour & texture with minimal
physical damage.

Plants to be free of living insect pests and free frorn any

- disease or physical injury

Containers to be free of weeds.
All plants to be delivered to site clearly & accurately labelled.
Contractor to maintain plants on site until planted.

SOIL PREPARATION

Remove all weeds, debris, rubbish, grass, etc. from areas to be
planted.

Form garden beds & spread any stockpiled topsoil. Beds
adjacent to hard areas to finish 100mm below paved level to
allow for depth of mulch. ~~ -~—._

Any imported topsoil to be free of large’s stones, weeds, sticks,
rubbish, or any material toxic to plant growth & shall be

” guaranteed free of Nut Grass & Oxalis.

PLANTING PROCEDURES

Do not plant in extreme hot, cold or atmospheric disturbances.
Dig separate holes for each plant, 100mm wider & deeper than
container. Loosen soil at base of holes a further 150mm depth.
Fill holes with water & allow to drain away.

Position plant in centre of hole, set plumb & backfill,
incorporating controlled release fertilizer as instructed on
packaging:

Gently & firmly tamp down around root ball, leaving a shallow
watering depression. Water immediately and thoroughly using
minimum 5 litres per-plant. .

MULCHING

All garden aréas to be mulched after planting and installation of
irrigation (recommended) with Hardwood Chip mulch (max. 5%

fines) to min depth of 100mm unless otherwise shown on plan.

Mulch to be kept at least 50mm from ail plant stems to prevent
collar rot.

DRY CREEK BED

To simulate a dry creek bed, excavate a roughly 300mm deep
elongated depression as shown on plan. Line outsides with 100
to 200mm diam river rock and line base with ungraded river
gravel te depth of 100mm.

Between footpath and road, place line of 100 to 200mm diam
rocks as shown to provide separation between river gravel
muiched area and Hardwood Chip mulched area.

GARDEN EDGING

Continuous extruded concrete mowing edge as shown, profile
as selected. .

ESTABLISHMENT

The Contractor shall establish and maintain the landscaping
works until the end of the Defects Liability Period.

“Make good any defects due to inferior materials, workmanship

ordamage: ~

Carry out all necessary watering, weeding, pruning & plant
replacements to ensure healthy growth.

Replace any dead or damaged plants with same species at the
contractor's expense (except for vandalism).

Remove all debris and leave site in a clean and tidy manner.

 

Page 25

 

 

 

rou a LAND USE SECTION FEES
im MNES :

 

 

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme’Documentation . 520
Copy of Permit/Approval Letter : 110
The Noosa Plan Documentation 111
APPLICATION FEES
: Material Change of Use - Code/Impact
Consistent 521
Inconsistent ‘ 521
- Assessment under Superseded Planning Scheme . 521°
Modification to a Development Permit . 521
Extension of a Currency Period . _ 521
Operational Works - Landscaping oO [ 5 521
@ ‘ Bldg Work assessable against the Planning Scheme - $21
PRE LODGEMENT REVIEW
Half Hour §22 .
One Hour 522
ADVERTISING :
: Purchase Advertised Applications . ‘ 523
JETTIES
Jetty Application Fee 524
Jetty Bond ‘ 51
: (Category 4)
BONDS /
Performance Bond : . . §1
(Category 9)
SIGNS : : .
Registration Fee . 222
stu FEE .
Search of Land Use Section file 112
Liquor Licensing Request 113
toTaL. § (OTS
NAME: Rowsrelh (@ld) PL. (Ct

 

ADDRESS: </~ Midclaio DB dcl’ 2 rtd
: CoN Po eS No

 

 

 

FILENO: 08/260 — DATE: _- i /a}os
‘RECEIPTNO: _ 3 L2L75 Signature of TP Officer: Coo...) Lea Kn
AUTHORITY NO: .

 

[2208 | 2oo/)

Page 26

     
 

DEVELOPMENT FEES & CONTRIBUTIONS

  
 
 
   

  

  
 

 

 

satay aah
Application Fees : Payee Name:
Road / Drainage Plan Exam Address:

 

Road / Drainage Field Inspection
Legal Document Examination

 
 

 

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

Developer Contribution - Drainage Other than PSP
Developer Contribution —-Pathway Other than PSP

Developer Contribution — Other Parks and Community

 

  
  
 
 
 
 

 

 
   
  

ICS - Community Land (Not currently active)

ICS - Public Transport
ICS — Sewerage (PSP Coastal)
ICS - Sewerage — South Peregian (PSP Maroochy)
ICS — Water Supply (PSP)

 
 
      
   
 
 

Road/Section:

     
   
   
 

 

   

Ra NE ya

PAPPLICATION(|
Payee Name:
Address:

      
  
  

 

‘ICS — Sport and Recreation Land (PSP Parks) .
ICS — Drainage (PSP Noosaville Master & Ward Street)
ICS ~ Road (CMRNICP) If BA not entered then use 594
ICS - Pathway (PSP)

 

 

 

 
   
 

 

 
  

Development Location:

 
    

   
 

 

 

 

 

     

 

   
 

 

   

 

ECPIDate: ne pe PE:| File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond
Total of Fees Paid (Including Bonds) | $ f b / & Date application properly made:

  
   

 

Receipt No: 4b. 2b 72 | Receipt Date:

PyLand Development/FEES & CONTRIBUTIONS/DEVELOPMENT FEES. doc

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Publis.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.